Algiers tramway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Algiers tramway
Tamway-algiers.svg
250px
Overview
Native name ترامواي الجزائر العاصمة
Locale Algiers, Algeria
Transit type Tram
Number of lines 1
Number of stations 29
Operation
Began operation 8 May 2011
Operator(s) ETUSA
Technical
System length 16.2 km (10.1 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
System map

Metro, suburban train and tramway map of Algiers.png

The Algiers Tramway (Arabic: ترامواي الجزائر العاصمة‎‎, Tramwāy al-Jazā'ir al-`Āṣimah, "Algiers Capital Tramway") is a tram system which commenced service on May 8, 2011 on part of the yet to be fully completed line in the Algerian capital, Algiers.[1] By June 2012, the opened sections had a length of 16.2 kilometres (10.1 mi) and 28 stops and were operated by ETUSA, the public transport operator for the Algiers metropolitan area, using Alstom Citadis trams. An extension, to take the tramway to a total length of 23.2 kilometres (14.4 mi), is currently (2013) under construction.[needs update]

Overview

Alger inaugure son nouveau réseau de tramway.jpg

The tramway is designed to carry between 150,000 and 185,000 people per day. The system offers a carrying capacity of 6,800 passengers per hour in each direction with a capacity of 400 persons per tram. The light rail vehicles (LRVs) being used are Alstom Citadis trams, specifically the second-generation Type 302. EMA has ordered 41 trams. The first set was delivered on March 28, 2009.[2]

The design of the trams was carried out by the agency RCP Design Global which covered the general concept, indoor environment and the outer casing of the trams. The livery of trams is blue and white.[3][4]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.

External links