Bankura–Masagram line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Bankura-Masagram line
Overview
Status Partially operational
Locale West Bengal
Termini Bankura
Masagram
Stations 21
Operation
Opened 2005 (as broad gauge railway)
Owner Indian Railway
Operator(s) South Eastern Railway
Technical
Line length Broad gauge: 116 km (72 mi)
Track gauge 1,676 mm (5 ft 6 in) Broad Gauge
Bankura Masagram line
Bankura
Nobanda
Beliator
Sonamukhi
Patrasaer
Belur
Kumrul
Indas
Shakhrul
Sahaspur
Bonwaichandi
Guisarang
Koiyar
Seharabazar
Gopinathpur
Shyamsundarpur
Rainagar
Mathnasipur
Berugram
Damodar River
Dadpur
Habaspur
Gram Masagram
Masagram

The Bankura–Masagram line is a broad-gauge rail line connecting Bankura and Masagram. The 116-kilometre long (72 mi) railway line operates in Bankura and Bardhaman districts in the Indian state of West Bengal. .

History

The old narrow gauge route of Bankura Damodar Railway was planned to be revived by South Eastern Railway of Indian Railways in 1998 as a broad gauge line. The plans were to convert the old track with some minor diverisions to a broad gauge one and connect it with the Howrah-Bardhaman Chord near Masagram. The work has been scheduled to be completed in three phases: Bankura - Sonamukhi, Sonamukhi-Rainagar, and Rainagar-Masagram.[1]

The 41 kilometres (25 mi) long Bankura-Sonamukhi broad gauge section was completed and opened to the public in 2005.[2] The 55 kilometres (34 mi) long Sonamukhi-Rainagar broad gauge section was completed and opened to the public in 2008[3] and one stop extension to Mathnasipur was completed in 2011. According to Indian Railways, the missing link between Mathnasipur and Masagram is planned to open in the financial year 2012-2013. On completion of the 20 kilometres (12 mi) long Rainagar-Masagram new broad gauge section, the distance between Howrah and Bankura will be reduced from 231 kilometres (144 mi) (via Kharagpur) to 185 kilometres (115 mi). The last section involves the construction of a bridge across Damodar River.[3][4] The 510 m long bridge over the Damodar has already been constructed and work on the Mathnasipur-Masagram new project is nearing completion with the addition of four new halts – Gram Masagram (Mustafachak), Habaspur, Dadpur and Berugram.[5]

Construction on the 48.25 kilometres (29.98 mi) long new broad gauge railway line between Bankura-Chhatna-Mukutmanipur has also been inaugurated.[6]

Route Description

The previous NG line near Bankura was a bit different. The former NG station was physically isolated from the BG station. It was after the adjacent road, so if anyone wanted to change from BG to NG, he/she should cross the road to entrain the NG train. To continuing journey from Adra to Rainagar, the new BG line is branching just before Bankura Jn. (going to Adra from Kharagpur), then it turns as a semicircle, and then meets on the old Narrow gauge line alignment. On the rest portion it completely follows the old line’s alignment. The line is entirely single. There are crossings at Sonamukhi, Patrasayer, Bowaichandi, Seharabazar and Rainagar. It passes through land of red soil and part of a partly cut jungle.

Train Service

The Rainagar broad gauge station of Bankura-Masagram line built in place of old narrow gauge terminus station of BDR. It is built with special elevation keeping in view of flooding of Damodar River in monsoons.

At present (2012), two DMU trains run between Bankura Jn. and Mathnasipur,[7] and one between Bankura Jn. and Seharabazar. Since 2012, The line between Masagram and Mathnasipur has been completed and one pair of DMU runs on this line.

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.