Blue Plains Advanced Wastewater Treatment Plant

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Aerial view of Blue Plains in 2009

Blue Plains Advanced Wastewater Treatment Plant, located in Washington, D.C., is the largest advanced wastewater treatment plant in the world. The facility is operated by the District of Columbia Water and Sewer Authority (DC Water). The plant opened in 1938 as a primary treatment facility, and advanced treatment capacity was added in the 1970s and 1980s. The effluent that leaves Blue Plains is discharged to the Potomac River and meets some of the most stringent permit limits in the United States.

Current operations

The plant has a treatment capacity of 370 million gallons per day (mgd) or 1.4 Gl per day, with a peak capacity (partial treatment during large storms) of 1.076 billion gallons per day (4.07 Gl/day).[1][2] The plant occupies 150 acres (0.61 km2) in the southwest quadrant of Washington, D.C. and discharges to the Potomac River. It serves over 2 million customers in Washington, large portions of adjacent Prince George's County and Montgomery County in Maryland, and portions of Fairfax County and Loudoun County in Virginia.[1][3][4]

Historically, wastewater treatment plants have contributed nutrients such as phosphorus and nitrogen to the waterways in which they discharge. These nutrients have been found to deplete oxygen in the marine environment, a process that is detrimental to fish and other aquatic life.[5]

Expansion in the 1970s

Since the mid-1980s, Blue Plains has reduced phosphorus to the limit of technology, primarily in support of water quality goals of the Potomac River, but also for the restoration of the Chesapeake Bay. The Chesapeake Bay Agreement, reached in 1987, was a first step in reducing nitrogen discharge to waterways that are tributary to the Chesapeake Bay. Under the agreement, the Bay states and the District of Columbia government committed to voluntarily reduce nitrogen loads by 40 percent from their 1985 levels. Blue Plains was the first plant to achieve that goal. Furthermore, in every year since the full-scale implementation of the biological nitrogen removal (BNR) process was completed in 2000, Blue Plains has every year successfully achieved and exceeded that goal of a 40 percent reduction. In Fiscal Year 2009, the BNR process at Blue Plains reduced the nitrogen load by more than 58 percent.[6]

In 2010, DC Water received the "Platinum Peak Performance Award" from the National Association of Clean Water Agencies. This Award is presented to member agencies for exceptional compliance for their National Pollutant Discharge Elimination System (NPDES) permit limits.[7]

History

Sludge thermal hydrolysis reactors, utilizing the Cambi process, installed in 2013

The original Blue Plains facility opened in 1938 as a primary treatment facility. It discharged under 100 mgd, serving a population of 650,000. Population increases in the 1950s led to the construction of secondary treatment units in 1959, with an expanded discharge capacity of 240 mgd. In the 1970s a major expansion commenced that led to construction of advanced wastewater treatment components, and by 1983 the capacity was 300 mgd.[8]

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.

Lua error in package.lua at line 80: module 'strict' not found.