Boğsak Tunnel

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Boğsak Tunnel
Boğsak Tüneli
Boğsak Tunnel.jpg
Boğsak Tunnel west end
Overview
Location Silifke, Mersin Province
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
(East end)
Route
Start Akdere, Silifke
End Boğsak
Operation
Opened March 18, 2014; 10 years ago (2014-03-18)
Owner General Directorate of Highways
Traffic Automotive
Character Twin-tube highway tunnel
Technical
Length 1,570 m (5,150 ft)
Number of lanes 2 x 2
Operating speed 70 km/h (43 mph)
Width 8 m (26 ft) each tube
Boğsak Tunnel is located in Turkey
Boğsak Tunnel
Boğsak Tunnel
Location of Boğsak Tunnel in Turkey

The Boğsak Tunnel is a road tunnel located in Silifke, Mersin Province in southern Turkey as part of the highway .

The highway is the main route running all the way from west to east in southern Turkey. Toros Mountains, which run in parallel to Mediterranean Sea coast, are to the north of the highway. The mountain range meets occasionally the sea with a high-sloped coast. Particularly, the 487 km (303 mi) portion of the highway connecting the two major Mediterranean ports of Antalya and Mersin is known for its steep ramps and sharp curves in the mountainous area. One of the most problematic courses up to date was a 5 km (3.1 mi)-course between Boğsak in the east and Akdere in the west, which was called the Çile yolu (literally: Road of ordeal) by the drivers.[1]

The tunnel was constructed to ease the traffic in this course. It was opened on 18 March 2014.[2] After the construction of the tunnel, the ramps were avoided and the length of the highway reduced by about 3.7 km (2.3 mi).[2] Construction of 22 other tunnels with a total distance of 18 km (11 mi) is planned to reduce the average travel time from 9 to 5 hours between Antalya and Mersin.[2][3][4]

It is a 1,570 m (0.98 mi)-long twin-tube tunnel carrying two lanes of traffic in each direction. The tubes are 8 m (26 ft) wide.[2] The tunnel is equipped with illumination, ventilation, intercommunication and other modern facilities.[4] The construction of the tunnel cost Turkish lira symbol 8x10px.png65 million.[2]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 2.4 Lua error in package.lua at line 80: module 'strict' not found.
  3. Mersin governor's page (Turkish)
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.