Bokpoort CSP
Bokpoort CSP | |
---|---|
Location of Bokpoort CSP in South Africa
|
|
Country | South Africa |
Location | Groblershoop |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Construction began | September 2013 |
Commission date | December 2015 |
Solar field | |
Type | CSP |
Site area | 300 hectares (741 acres) |
Power generation | |
Nameplate capacity | 50.0 MW |
Annual generation | 200 GWh |
Bokpoort CSP is a concentrated solar power (CSP) solar thermal power plant, located near Groblershoop in the Northern Cape province of South Africa.[1] It has a capacity of 50.0 megawatts (MW).[2] It covers an area of less than 300 hectares (741 acres).
The Bokpoort Plant has a full-load molten salt storage capacity of 1‚300MWh equivalent to around 9.3 hours.[3] The plant was completed in December 2015, after a construction period of 30 months.[4][5]
The consortium led by ACWA Power International (Saudi Arabia) describes this system as the largest thermal storage system ever built for a CSP plant of its size and capacity. The South African solar power plant has set a new African record (26 April 2016) for the continuous, round the clock supply of electricity.[6]
See also
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.