Burnley Manchester Road railway station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Burnley Manchester Road National Rail
265px
Location
Place Burnley
Local authority Burnley
Grid reference SD836322
Operations
Station code BYM
Managed by Northern Rail
Number of platforms 2
DfT category F1
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2004/05  0.143 million
2005/06 Increase 0.151 million
2006/07 Increase 0.167 million
2007/08 Increase 0.179 million
2008/09 Increase 0.190 million
2009/10 Increase 0.191 million
2010/11 Increase 0.216 million
2011/12 Increase 0.232 million
2012/13 Increase 0.247 million
2013/14 Decrease 0.245 million
2014/15 Increase 0.273 million
History
Original company Lancashire and Yorkshire Railway
Pre-grouping Lancashire and Yorkshire Railway
Post-grouping London, Midland and Scottish Railway
1 November 1866 Station opens
6 November 1961 Closed
13 October 1986 Station rebuilt and reopened[1]
National RailUK railway stations

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Burnley Manchester Road from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Burnley Manchester Road is a railway station serving the town of Burnley, Lancashire, England.

History

On 12 November 1849, the Manchester and Leeds Railway opened a single line branch – doubled in 1860 – from Todmorden to Burnley. The first station in the town, which was at Thorneybank, was replaced by Burnley Manchester Road in 1866. This closed on 6 November 1961,[2] but was reopened (with new platforms) in 1986, two years after the successful re-introduction of year-round services between Leeds and Preston/Blackpool North.

The town currently has three other railway stations, Rose Grove, Burnley Barracks and Burnley Central, on the East Lancashire Line which diverges from the Caldervale Line at Gannow Junction west of the town centre.

Services

On weekdays, the station is served by Northern Rail semi-fast services from Blackpool North to Leeds and York via the Caldervale Line. Currently (May 2015) there is an hourly service in each direction each weekday. On Sundays there is now also an hourly service (from mid-morning onwards) each since the May 2009 timetable change.[3]

From 17 May 2015 an hourly service between Blackburn and Manchester Victoria serves the station seven days a week.[4]

2013 Engineering work

Eastbound services (i.e. toward Hebden Bridge) were suspended for 5 months from November 2013 until the end of March 2014 whilst Network Rail carried out major repairs to Holme Tunnel (near to the site of the old Holme station). The 265-yard (250 m) long structure had been subject to a permanent 20 mph speed restriction for many years due to earth movement in the surrounding ground that had damaged the tunnel lining and eastern portal (steel supports were installed for most of the way along the tunnel bore since the mid-1980s to prevent further deterioration). The 20-week-long blockade[5] has seen the tunnel lining strengthened & re-profiled, the damaged lining sections replaced, the eastern portal rebuilt, new track laid and drainage improvements carried out. Since completion, trains can pass through the tunnel at 45 mph (72 kmh). Replacement buses operated to & from Hebden Bridge,[6] connecting with the train services from Blackpool & Preston whilst the work was in progress. The line was reopened to traffic as scheduled on 24 March 2014.[7]

Developments

The local councils and MP have campaigned to restore a direct rail link between the town and Manchester Victoria using the defunct south to west curve at Todmorden that was removed following the withdrawal of local trains in November 1965. This would allow trains to run between Burnley and Manchester via Rochdale in less than an hour.[8] Network Rail had intimated in its Lancashire & Cumbria RUS that such a link would be possible, but that the business case would only be viable with third party funding.[9] It was thought that the scheme would proceed following the finalising of a Multi Area funding agreement between central government and a consortium of councils in East Lancashire in January 2009,[10] although it was subsequently omitted from the list of projects recommended for funding over the next decade by the North West Regional Development Agency in July 2009.[11]

On 31 October 2011, it was announced that the scheme had been granted finance as part of the Regional Growth Fund announced by Deputy Prime Minister Nick Clegg.[12] Services were initially due to start at the May 2014 timetable change following completion of the curve (and its signalling) and the Holme Tunnel work. All structural work was completed by spring 2014. However, due to a lack of available rolling stock and unfinished signalling changes at the Todmorden end (which were not completed until February 2015) it was announced that services would not start until May 2015 at the earliest (eventually doing so at the May timetable change).[13]

The plans have also seen the station facilities upgraded at a cost of £2.3 million with the opening of a new ticket office in a new station building and the provision of additional car parking spaces and new waiting shelters; completion was scheduled for Spring 2014.[14] The station building opened in November 2014, having been almost complete and awaiting improvements to lighting since July.[15]

Notes

  1. Butt, R.V.J., (1995) The Directory of Railway Stations, Yeovil: Patrick Stephens
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Northern Rail Timetable 8 - Blackpool North to Halifax - Bradford - Leeds - York 17 May to 12 December 2009 Northern Rail website; Retrieved 2 June 2009
  4. Northern Rail timetable - Manchester Victoria to Blackburn via Todmorden from 17 May 2015Northern Rail; Retrieved 20 May 2015
  5. 20 Week Closure for Holme Tunnel UpgradeModern Railways website news article; Retrieved 22 August 2013
  6. Northern Rail News - Holme Tunnel ClosureNorthern Rail; Retrieved 25 October 2013
  7. Northern Rail - News : Holme Tunnel reopened on Monday 24 March Northern Rail press release; Retrieved 24 March 2014
  8. "Burnley–Manchester 45-minute rail link 'top priority'", Burnley Express, 30 June 2008. Retrieved 28 August 2008.
  9. Network Rail Lancashire & Cumbria Draft RUS. Retrieved 28 August 2008.
  10. Green Light For Rail Improvements Lancashire Telegraph website article 12 January 2009; Retrieved 13 January 2009
  11. "No funding for East Lancashire rail improvements"Burnley Citizen website article 13 July 2009; Retrieved 15 July 2009
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.

External links

Preceding station National Rail National Rail Following station
Accrington   Northern Rail
Caldervale Line
  Hebden Bridge
Rose Grove   Northern Rail
via Todmorden Curve
  Todmorden
Historical railways
Rose Grove
Line and station open
  L&YR
Copy Pit Line
  Towneley
Line open, station closed

Lua error in package.lua at line 80: module 'strict' not found.