Canyonview Aquatic Center

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Canyonview Aquatic Center
Canyonview Aquatics Center 01.jpg

The west pool and weight room

City: La Jolla, California
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Capacity: 2,336
Built: 1982
Home club(s): UC San Diego Tritons
Pools
Name Length Width Depth Lanes
West Pool
East Pool
50 m
50 m
25 yards (23 m)
25 yards (23 m)
7 ft
8 or 19
8 or 19

Canyonview Aquatic Center is the main aquatic center at the University of California, San Diego, comprising two Olympic-size swimming pools, bleacher seating, and associated fitness facilities. It is located on the Warren College campus and serves as the home stadium of the Triton men's and women's water polo, swimming and diving teams.


History

In June 1982, construction began on a recreation center to supplement the forthcoming student housing in Earl Warren College and ease pressure on the original Natatorium facility in Muir College. This recreation center would include a 50-meter Olympic-size pool, an outdoor whirlpool bath, four racquetball courts, and locker rooms with showers.[1] Upon its completion in spring 1983, the $1.8 million project housed the only publicly accessible long-course pool in San Diego.[2] In 1995, two racquetball courts were converted into an indoor climbing and bouldering facility.[3] In 2003, citing increased strain on the Natatorium and existing pool, UCSD began construction on a second long-course pool which would include seating for 1,000 and a new weight room and allow for more recreational swim hours. This West Pool was completed in February 2006.[4]

Facilities

West Pool

The west pool and bleachers

The West Pool is the home pool of the Triton water polo and swimming teams. It is 50 meters long and 25 yards wide, with a uniform depth of 7 feet. It was designed by the firm of Hanna Gabriel Wells and opened in 2006. There is bleacher seating for 1,000 along the south and west edges. The pool is heated year-round.

East Pool

The complex entrance and east pool

The East Pool is the home pool of the Triton swimming and diving teams. It is 50 meters long and 25 yards wide, with five diving boards along the south edge and an adjacent hot tub. It features bleacher seating for 336 and lawn space for an additional 1,000 spectators. The pool entered the Guinness Book of World Records when 26 continuous hours of water polo were played there on April 7–8, 1989.

Weight room and climbing center

The 1850 square foot weight room is housed in the location of the original Canyonview pump, which was relocated with the construction of the West Pool. It primarily features lifting equipment chosen specifically for aquatic training.[5] The southern part of the building houses the Outback Climbing Center.

Notable events

In 2014, Canyonview hosted the NCAA Water Polo Championships.[6]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.

External links