Common Booster Core

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Common Booster Core
Delta 342 CBC delivery.jpg
Delivery of the CBC used as the first stage of Delta 342, which launched GOES 14
Manufacturer Boeing (1998–2006)
United Launch Alliance (2006—)
Country of origin United States
Used on Delta IV (stage 1)
Delta IV Heavy (boosters)
General characteristics
Height 40.8 m (134 ft)
Diameter 5.1 m (17 ft)
Gross mass 226,400 kg (499,100 lb)
Engine details
Engines One RS-68
Thrust 3,312.76 kN (744,740 lbf)
Burn time 367 seconds
Fuel LOX/LH2
Delta first stages in front of the Horizontal Integration Facility at SLC-37.

The Common Booster Core (CBC) is an American rocket stage, which is used on the Delta IV rocket as part of a modular rocket system. Delta IV rockets flying in the Medium and Medium+ configurations each use a single Common Booster Core as their first stage, while the Heavy configuration uses three; one as the first stage and two as boosters.[1] The Common Booster Core is 40.8 metres (134 ft) long, has a diameter of 5.1 metres (17 ft) and is powered by a single RS-68 engine burning liquid hydrogen and liquid oxygen.[2]

The first static test firing of a Common Booster Core was conducted on 17 March 2001, and the final test of the initial programme was conducted on 6 May.[3] Testing was conducted using Test Stand B-2 of the John C. Stennis Space Center,[4] a facility originally constructed for testing of the first stages of Saturn V rockets during the 1960s. The first launch of a Common Booster Core was the maiden flight of the Delta IV, which was launched from Space Launch Complex 37B at the Cape Canaveral Air Force Station on 20 November 2002.[5]

The first flight of the Delta IV Heavy, featuring three Common Booster Cores, was conducted on 21 December 2004. On this flight all three CBCs malfunctioned, cutting off prematurely due to cavitation in their oxidiser lines, and resulting in the rocket reaching a lower orbit than that which had been planned. In response to the failure, additional pressure valves were installed on future launches.[6]

As of December 2014, the Delta IV has made 28 flights; twenty in Medium and Medium+ configurations, and eight in the Heavy configuration, resulting in a total of 44 Common Booster Cores being launched.[7]

The CBCs are manufactured in United Launch Alliance's 1,500,000-square-foot (140,000 m2) manufacturing facility in Decatur, Alabama and then transported by the M/V Delta Mariner to either Vandenberg Air Force Base or Cape Canaveral Air Force Station where they are integrated with the spacecraft and other components such as strap-on boosters and a Delta Cryogenic Second Stage.[8]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Boeing: Multimedia - Image Gallery - Delta IV Launch Vehicle Manufacturing - Decatur, Alabama