Dandong–Dalian Intercity Railway
From Infogalactic: the planetary knowledge core
Dandong-Dalian Intercity Railway | |
---|---|
Overview | |
Native name | 丹大城际铁路 |
Type | High-speed rail |
Status | in operation |
Locale | Liaoning, China |
Termini | Dalian Dandong |
Stations | 18 |
Services | 1 |
Operation | |
Opened | 17 December 2015 |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 292 km (181 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 250 km/h (160 mph) |
Dandong–Dalian Intercity Railway is a Chinese high-speed railway within Liaoning Province, connecting the coastal cities of Dandong and Dalian.
Contents
Overview
Dandong–Dalian Intercity Railway is broken down into three segments: Dandong - Zhuanghe section, Zhuanghe - Dengshahe section and the Dengshahe - Dalian section. It will have a total length of about 292 km, of which 94 km will be in the Dandong prefectural area, 198 km will be in the Dalian region.[1] The total investment is estimated to be about 14.7 billion yuan with a design speed of 200 km/h of primarily double tracked electrified railway. The construction period was estimated to take about three and a half years[2] and was started on 17 March 2010. It started operation on 17 December 2015[3]
History
Planning Phase
- 21 April 2009 - Liaoning Provincial Government and the Ministry of Railways signed the "On the strengthening of Liaoning railway construction Minutes", which set a railway design speed of 250 km/h along a double track line electrified railway for passengers and freight.
- 28 June 2009 - Ministry of Railways jointly with the provincial government reported to the National Development and Reform Commission about their studies on this project.[4]
- 19–21 December 2009 - Ministry of Railways held preliminary design review meeting, formally adopting the project preliminary design review.
Construction Phase
- 17 March 2010 - Dandong - Zhuanghe section started.[5]
- 2 December 2010 - First bridge girder erection in the Donggang, Liaoning, area, well north of the town of Wolong with several large bridges completed.[6]
Operation Phase
- 17 December 2015 - Start operation.
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.