Dandong–Dalian Intercity Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Dandong-Dalian Intercity Railway
ChinaRailwayHighspeed.svg
Overview
Native name 丹大城际铁路
Type High-speed rail
Status in operation
Locale Liaoning, China
Termini Dalian
Dandong
Stations 18
Services 1
Operation
Opened 17 December 2015
Operator(s) China Railway High-speed
Technical
Line length 292 km (181 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Operating speed 250 km/h (160 mph)
Route map
Dandong
 Shenyang–Dandong Intercity Railway to Shenyang South 
Tongxing
Dandong West
Qianyang
Donggang
Beijingzi
Gushan
 Xiuyan-Zhuanghe Railway to Xiuyan 
Landian
Zhuanghe North
Zhuanghe West
Huayuankou
Chengzitan
Pikou
Dengshahe
Guangningsi
Jinzhou
 Harbin–Dalian High-Speed Railway to Harbin West 
vxBHF-BHF
Dalian North
Dalian

Dandong–Dalian Intercity Railway is a Chinese high-speed railway within Liaoning Province, connecting the coastal cities of Dandong and Dalian.

Overview

Dandong–Dalian Intercity Railway is broken down into three segments: Dandong - Zhuanghe section, Zhuanghe - Dengshahe section and the Dengshahe - Dalian section. It will have a total length of about 292 km, of which 94 km will be in the Dandong prefectural area, 198 km will be in the Dalian region.[1] The total investment is estimated to be about 14.7 billion yuan with a design speed of 200 km/h of primarily double tracked electrified railway. The construction period was estimated to take about three and a half years[2] and was started on 17 March 2010. It started operation on 17 December 2015[3]

History

Planning Phase

  • 21 April 2009 - Liaoning Provincial Government and the Ministry of Railways signed the "On the strengthening of Liaoning railway construction Minutes", which set a railway design speed of 250 km/h along a double track line electrified railway for passengers and freight.
  • 28 June 2009 - Ministry of Railways jointly with the provincial government reported to the National Development and Reform Commission about their studies on this project.[4]
  • 19–21 December 2009 - Ministry of Railways held preliminary design review meeting, formally adopting the project preliminary design review.

Construction Phase

  • 17 March 2010 - Dandong - Zhuanghe section started.[5]
  • 2 December 2010 - First bridge girder erection in the Donggang, Liaoning, area, well north of the town of Wolong with several large bridges completed.[6]

Operation Phase

  • 17 December 2015 - Start operation.

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.