File:Crossrail conveyer system.JPG

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Original file(3,000 × 753 pixels, file size: 1.37 MB, MIME type: image/jpeg)

Summary

Part of a conveyor system used to remove spoil from one of the Tunnel Boring Machines at the London Crossrail tunnel excavations at Royal Oak Portal. This section is north of Royal Oak Station. Spoil is stored between the end of the conveyor and Paddington Station, eventually it will be transferred west by the belt system and loaded onto trains at a rail-head that is still under construction (September 2012). Panoramic view created using Serif Stitcher.

Licensing

Lua error in package.lua at line 80: module 'strict' not found.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current10:36, 6 January 2017Thumbnail for version as of 10:36, 6 January 20173,000 × 753 (1.37 MB)127.0.0.1 (talk)Part of a conveyor system used to remove spoil from one of the Tunnel Boring Machines at the London Crossrail tunnel excavations at Royal Oak Portal. This section is north of Royal Oak Station. Spoil is stored between the end of the conveyor and Paddington Station, eventually it will be transferred west by the belt system and loaded onto trains at a rail-head that is still under construction (September 2012). Panoramic view created using Serif Stitcher.
  • You cannot overwrite this file.

The following page links to this file: