Fiona Stanley Hospital

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Fiona Stanley Hospital
Fiona Stanley Hospital logo.png
General information
Status Complete
Type Hospital
Location Perth, Western Australia
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Construction started 2009
Completed December 2013
Opening <templatestyles src="Plainlist/styles.css"/>
  • Phase 1: 4 Oct 2014[1]
  • Phase 2A: 17 Nov 2014
  • Phase 2B: 2 Dec 2014

  • Scheduled:[2]
    • Phase 3: 3 Feb 2015
    • Phase 4: 23 Mar 2015
Cost A$2 billion (est.)
Technical details
Floor area 150,000 m2 (1,600,000 sq ft)
Design and construction
Architect Silver Thomas Hanley, Hames Sharley, HASSELL
Main contractor Brookfield Multiplex
Other information
Number of rooms 6,400

Fiona Stanley Hospital is a state government hospital and teaching facility in Murdoch, Western Australia. Completed in December 2013,[3] the hospital is the largest building project ever undertaken for the Government of Western Australia.

Design

The hospital campus includes the main Fiona Stanley Hospital tower with 18 theatres and over 22 wards on nine levels, an education building complete with replica wards and a large tiered lecture theatre,[4] a separate mental health building,[5] the four-storey State Rehabilitation Service building, a pathology building, an administration building and two multi-storey public carparks. Most of the patient bedrooms in the hospital are single bed ensuite facilities, with less than 10% accommodating two patients.

After completion of the first stage, the initial design of the hospital was to have a capacity of 643 beds.[6] The final design saw the bed capacity increase to 783.[7] The hospital is named after epidemiologist and public health campaigner Fiona Stanley.

The site of the hospital is adjacent to Murdoch railway station, Murdoch University and the private St John of God Hospital. It is located 15 kilometres south of the Perth CBD via the Kwinana Freeway.

Construction

Hospital during construction, December 2010

The entire health campus, comprising several buildings, was designed by the Fiona Stanley Hospital Design Collaboration, a joint venture between the local offices of three architectural practices Silver Thomas Hanley,[8] Hames Sharley[9] and HASSELL. The directors responsible for the project from each firm were Giorgio Raffa, Warren Kerr and Jeff Menkens. The managing contractor for the project was Brookfield Multiplex.

Opening

The hospital opened progressively over several months between October 2014 and February 2015. The opening was delayed by six months to October 2014 due to issues with readiness of new integrated state-of-the-art information technology clinical systems.[10] The Fiona Stanley facilities incorporate technological innovations such as wi-fi-controlled "robots" that deliver catering to wards, and mobile computer workstations on wheels to assist staff with dispensing of patient medications while accessing required clinical applications.[11] Most bedrooms also have new multi-purpose, wall-mounted swing-arm, bedside patient entertainment systems incorporating touchscreens and keyboards that patients can use for ordering meals, making phone calls, watching TV or movies/games, which can also be redirected for use by clinical staff via a swipe card for functions such as updating patient records and reviewing diagnostic imaging such as x-rays.[12]

Phase 1

Exterior of the State Rehabilitation Service building at Fiona Stanley Hospital

Phase 1 was the opening of the State Rehabilitation Service, with pathology, pharmacy and medical imaging providing support as required.[2] It opened on 4 October 2014, with patients from Royal Perth Hospital's Shenton Park campus being transferred to the new facility. Approximately 23 vehicles – ambulances, or others suitably equipped – left Shenton Park, transporting more than 80 patients. The new State Rehabilitation Service has a 140-bed capacity.[1]

Phase 2

Standard ward room

In Phase 2A, several operating theatres and two 24-bed general wards (surgical and medical) opened on 17 November 2014, along with orthopaedic, anaesthetic, hyperbaric medicine and limited intensive care capability.[2]

Phase 2B in early December included opening of significant maternity services on level 3 of the main building - obstetrics, the birth suite and neonatal services.[2]

Phase 3

Emergency department, scheduled to open on 3 February 2015

Phase 3, the biggest stage, included the opening of the Emergency Department (ED), from 3 February 2015 with 72 beds including a paediatric emergency department. Many ED staff from the Fremantle Hospital moved across on the opening day and the ED at Fremantle closed as scheduled. Most other medical specialities in the main nine-storey main hospital building also opened, including 18 more wards and corresponding outpatient services in 10 clinics.[2]

Phase 4

The final Phase 4 included the opening of the heart and lung transplant services in March 2015.[2] The hospital employs approximately 4,000 clinical staff, as well as administrative, and other support staff such as cleaners, catering, equipment sterilisation services and technical support for hospital facilities such as power and security.

Gallery

A building site with three multi-storey buildings all nearing completion from an external perspective. There are two overhead cranes and many pallets of materials waiting to be lifted into the buildings, all of which are surrounded by a temporary security fence.
Panorama of the construction of the hospital, May 2012

Awards

In July 2015, the West Australian chapter of the Australian Institute of Architects awarded the Fiona Stanley Hospital Design Collaboration (comprising architectural practices Silver Thomas Hanley,[13] Hames Sharley[14] and HASSELL) the following awards and commendations:[15]

  • The George Temple-Poole Award (the program’s highest overall honour)
  • The Jeffrey Howlett Award for Best Public Architecture
  • The Wallace Greenham Award Best Sustainable Architecture
  • A Commendation for Urban Design

Notes

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 Lua error in package.lua at line 80: module 'strict' not found.
  3. http://www.fsh.health.wa.gov.au/About-us/Contact-us/Your-questions-answered
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. http://www.silverthomashanley.com/
  9. http://www.hamessharley.com.au/
  10. Fiona Stanley Hospital IT could cost another $50 million
  11. https://au.news.yahoo.com/thewest/a/25122758/robots-deliver-new-catering-era/
  12. http://www.fsh.health.wa.gov.au/~/link.aspx?_id=5F11996F6C9743508B2350FC5510010C&_z=z
  13. http://www.silverthomashanley.com/
  14. http://www.hamessharley.com.au/
  15. http://www.architectureanddesign.com.au/news/2015-wa-architecture-awards

External links