GASUN

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

GASUN
Gas Unificação
Location
Country Brazil
State Mato Grosso do Sul, Goiás, Pará, Tocantins, Maranhão, Piauí
From Mimoso, Mato Grosso do Sul
Passes through Goiânia, Palmas, Belém
To Maranhão
General information
Type natural gas
Operator Petrobras
Expected 2026
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).

The National Unification Gas Pipeline (Gas Unificação – GASUN) will be a 5,000-kilometre (3,100 mi) natural gas pipeline in Brazil. GASUN will connect the Gasbol pipeline with the northern Amazon and the Northeast states (Pará, Tocantins, Maranhão and Piauí) allowing transportation of Bolivian gas into these regions. The project is expected to cost US$2.48 billion.

The first stage of GASUN will begin in Mimoso, Mato Grosso do Sul, and will join the Gasbol pipeline. From there it will run towards Brasília, passing through Goiânia.[1] Construction of this section started in 2005, and scheduled to be completed in 2007.

The longest and most costly portion of GASUN will be the 2,260 kilometres (1,400 mi) long central-north branch, which is to connect Goiás and Maranhão. It will pass through Palmas and Belém, Pará. The entire natural gas pipeline should be complete by 2026.[1]