GE Wind Energy

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
GE Wind Energy
Industry Wind power
Predecessor Zond
Founded 1980
Founder James G.P. Dehlsen
Headquarters Fairfield, Connecticut, U.S.
Area served
Worldwide
Products Wind turbines
Owner General Electric
Website gewindenergy.com

GE Wind Energy is a branch of GE Energy, a subsidiary of General Electric. The company manufactures and sells wind turbines to the international market. In 2009, GE was the second largest wind turbine manufacturer in the world.[1]

History

The entity was created as developer (not manufacturer) Zond in 1980 by James G.P. Dehlsen, who also formed Clipper Windpower in 2001.[2] Enron acquired Zond and the German manufacturer Tacke in 1997.[3]

In 2002 GE acquired the wind power assets of Enron during its bankruptcy proceedings[4] while gas turbine sales slumped. Enron Wind was the only surviving US manufacturer of large wind turbines at the time, and GE increased engineering and supplies for the Wind Division and doubled the annual sales to $1.2B in 2003.[5] It acquired ScanWind in 2009.[6]

In February 2011, GE also acquired Wind Tower Systems LLC, a manufacturer of space frame wind turbine towers.[7]

Products

The company currently produces three types of wind turbines, ranging from 1.5 MW to 4 MW.

GE's current models
Feature GE 1.5-77[8] GE 2.5-100[8] GE 4.1-113<[8]
Rated capacity (MW) 1.5 2.5 4.1
Cut-in wind speed 3.5 m/s (11.5 ft/s) 3.5 m/s (11.5 ft/s) 3.5 m/s (11.5 ft/s)
Cut-out wind speed 20 m/s (65.6 ft/s) 25 m/s (82.0 ft/s) 25 m/s (82.0 ft/s)
Rated wind speed 11.5 m/s (37.7 ft/s) 12.5 m/s (41.0 ft/s) 14 m/s (45.9 ft/s)
Operational temperature −30 to 40 °C (−22 to 104 °F)
IEC 61400 wind class I&II IIIa, IIb Ib
Frequency (Hz) 50–60
Voltage 575
Rotor diameter 77 m (253 ft) 100 m (328 ft) 113 m (371 ft)
Rotor swept-area 4,657 m2 (50,128 sq ft) 7,854 m2 (84,540 sq ft) 9,567 m2 (102,978 sq ft)
Hub heights 80 m (262 ft) 75–100 m (246–328 ft) Site dependant

GE 1.5MW

GE 1.5MW wind turbine.

The GE 1.5 megawatt series of wind turbines was developed with the cooperation of the United States Department of Energy.[9][10] It consists of three fibreglass blades attached to a horizontal axis hub. The hub is connected to the main shaft which turns a multi-stage system of gears. The gears increase the rotational rate and send the kinetic energy obtained from the wind to a doubly fed electric machine, where it is converted into electrical energy. The angle of the blades and the direction which the turbine faces are controlled by an active, all electric pitch and yaw system. The generator has a maximum output of 1.5 megawatts (1,500 kW). The generator and gearbox are contained in the nacelle which is further insulated to minimize noise emissions.[9]

Three models in the series (the 1.5se, 1.5sle, and 1.5xle) had been developed by 2005. Their rotors ranged in diameter from 70.5 to 82.5 meters (231 to 271 ft), accommodating variable expected wind speeds.[11] Newer models (the 1.6-100 and 1.7-100) incorporate the 100m rotor from GE's 2.5MW towers, enabling these towers to generate substantially more electrical power from locations with sub-optimal wind. Several optional features support its presence in electrical grids, including voltage regulation, low voltage ride through, and the delivery of reactive power during grid disturbances or periods of low wind.

To further wind power research, a unit was commissioned at the National Wind Technology Center in late 2009.[12] Its 10,000 installations in the US at the time constituted 50% of the national commercial wind energy fleet, influencing the NREL's decision to install a model at the Center.[13] 12,000 turbines had been installed in 19 countries by mid-2009.[10][12][14] [15]

GE 2.5MW

The GE 2.5MW wind turbine (also called GE2.5XL) is the second and larger model of land based wind turbines sold by General Electric. It is currently in operation on three continents; Europe, Asia, and North America. The 845MW Shepherds Flat Wind Farm in Oregon is the first windpark in the United States to utilize this model as its primary wind turbine.[16] Unlike GE's 1.5MW models, the 2.5XL uses a permanent magnet generator, and its entire output is converted to AC at mains frequency. A second generation, using a doubly fed generator and rotor converter similar to the 1.5 series, is in planning.

GE 4.1MW

The newest turbine by GE, the 4.1 MW wind turbine (also called GE4.1-113)[8] is the only offshore wind turbine model currently manufactured by General Electric. The offshore GE 3.6 SL was discontinued, but its installations remain in operation at the Arklow Bank Wind Park.[17]

See also

References

  1. Acher, John. China became top wind power market in 2009 Reuters, 29 March 2010. Retrieved: 8 August 2010.
  2. Clipper Chairman inducted into Environmental Hall of Fame North American Windpower, 12 December 2008. Retrieved: 23 October 2010.
  3. Enron acquires Zond, a major wind-power company New York Times, 7 January 1997. Retrieved: 6 November 2010.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Fairly, Peter. The Greening of GE IEEE Spectrum, July 2005. Retrieved: 6 November 2010.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. GE acquires next-generation wind turbine tower technology PennEnergy/GE, 11 February 2011. Accessed: 23 February 2011.
  8. 8.0 8.1 8.2 8.3 Lua error in package.lua at line 80: module 'strict' not found. Cite error: Invalid <ref> tag; name "GE" defined multiple times with different content Cite error: Invalid <ref> tag; name "GE" defined multiple times with different content Cite error: Invalid <ref> tag; name "GE" defined multiple times with different content
  9. 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. 12.0 12.1 Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. DOE LPO finalizes deal on the World’s largest Wind Project to date United States Department of Energy, 17 December 2010. Accessed: 18 December 2010.
  17. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.