HVDC Tian–Guang

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
HVDC Tian–Guang
Location
Country China
Province Guangxi, Guangdong
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Lua error in package.lua at line 80: module 'strict' not found.
From Tianshengqiao Hydroelectric Plant
Passes through Pingguo, Laibin, Wuzhou, Luodong
To Beijiao, Guangzhou
Runs alongside existing AC powerline
Ownership information
Operator China Southern Power Grid
Construction information
Manufacturer of substations Siemens
Commissioned 2001
Technical information
Type overhead transmission line
Type of current HVDC
Total length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Power rating 1,800 MW
DC Voltage 500 kV
Number of poles 2

HVDC Tian–Guang is a bipolar 500 kV HVDC system used for transmitting power generated at Tianshengqiao Hydroelectric Plant to Guangzhou. HVDC Tian–Guan, which was built by Siemens and inaugurated in 2001 is capable of transmitting a maximum power of 1,800 MW.[1]

The terminals are situated at Tianshengqiao Hydroelectric Plant 2 at Lua error in package.lua at line 80: module 'strict' not found. and at Beijiao at Lua error in package.lua at line 80: module 'strict' not found. near Guangzhou. There is a parallel running AC powerline via Pingguo, Laibin, Wuzhou and Luodong, but the DC line helps damping oscillations and stabilizing the system.