The Hornby Clocktower (also known as the 'Hornby Clock Tower' or simply as the clock tower to local residents) was an iconic Christchurch building, situated in the suburb of Hornby on New Zealand State Highway 1. It marked the southern entrance to Christchurch for over 50 years.[1]

Less than three months after a full refurbishment in 2010, the building was damaged in the 2011 Christchurch earthquake and subsequent aftershocks. It was demolished by October 2014.

History

1960s original building

The original incarnation of the building was constructed some time during the 1960s, and was designed by Don Donnithorne. During its early usage, it was home to the Central Canterbury Electric Power Board.[1]

2010 refurbishment

The building was refurbished in 2010 and completed by December of that year. It had been redesigned by Wilson and Hill Architects and was managed by Epoch Property.[2] The upper five floors of the tower were designated as office space. The ground level was reserved for retail space, initially occupied by coffeehouse chain 'Coffee Culture'. It was the only company to rent space in the building after the refurbishment. Outside of the Hornby Clocktower is a separate series of retail stores in the style of a strip mall, designed as an addition to the tower during its final refurbishment, and which still exist after demolition.

File:Hornby Clocktower Demolition.png
Demolition in October 2014

Earthquake damage

The building was largely undamaged by the 2010 Canterbury earthquake during the refurbishment. Less than three months after completion, the tower suffered damaged in the 2011 Christchurch earthquake. Following strong aftershocks in December 2011, it was vacated for the final time. Epoch Property claimed in early 2012 that they wanted to keep the Clocktower, but believed it wouldn't be financially viable to repair the building, and were considering demolition.[2]

Demolition

Demolition work began on the town at the end of August 2014. It was completed in October that year. The site will be used to construct a single-story building, owned by a national restaurant chain that has not yet been named.[3]

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.

Lua error in package.lua at line 80: module 'strict' not found.