Interstate 74 in North Carolina

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Interstate 74 marker

Interstate 74
<mapframe frameless="1" width="290" height="290" align="center">{{Wikipedia:Map data/Wikipedia KML/Interstate 74 in North Carolina}}</mapframe>
Open segments of I-74 as of March 2015 in red
Route information
Maintained by NCDOT
Length: 124.91 mi[1][2][3][4] (201.02 km)
Existed: 1997 – present
Major junctions
West end: I‑77 at the Virginia state line
  <templatestyles src="Plainlist/styles.css"/>
East end: US 74 / NC 41 near Lumberton
Location
Counties: Surry; Forsyth, Guilford, Randolph, Montgomery, Richmond; Robeson
Highway system
NC 73 US 74

Interstate 74 (I-74) is a partially completed part of the Interstate Highway System that will eventually run from Davenport, Iowa, to Myrtle Beach, South Carolina. In the US state of North Carolina, I-74 currently exists in three distinct segments; from I-77 at the Virginia state line to U.S. Highway 52 (US 52) near Mount Airy, from I-40 in Winston-Salem to US 220 near Ellerbe, and from US 74 and US 74 Business (US 74 Bus.) near Maxton to US 74/North Carolina Highway 41 (NC 41) near Lumberton. I-74 has an extensive concurrency with I-73 from Randleman to Ellerbe in the Piedmont. When completed, I-74 will link the cities of Mount Airy, Winston-Salem, High Point, Rockingham, Laurinburg, and Lumberton.

The Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) authorized a new high priority transportation corridor from Michigan to Myrtle Beach, originally to be I-73. Conflicts over the routing of I-73 led to a compromise in 1995 that created a proposed extension of I-74 from Cincinnati, Ohio, to Myrtle Beach. The first section of I-74 was completed on August 27, 1996, between Steeds and Ulah. I-74 replaced North Carolina Highway 752 (NC 752) in 1998 near Mount Airy, and the entirety of the Mount Airy segment was completed by 2000. A segment of the Interstate was opened in 2008 between Maxton and Lumberton, creating the third segment of I-74 in North Carolina. In 2012, I-74 was extended from Ellerbe to Winston-Salem along US 311. The Piedmont segment was extended south in June 2013 and June 2018 in concurrency with I-73 and US 220 to Randleman.

Route description

As of September 27, 2018, there are a total of 124.91 miles (201.02 km) of I-74, broken in three segments across the state: Mount Airy, the Piedmont Triad, and Laurinburg areas.[5]

Mount Airy

File:EndI74NC.jpg
Southern terminus of the Mount Airy segment of I-74. Pilot Mountain can be seen in the background.

The first section of I-74 begins at the Virginia state line (overlapped with I-77 for approximately four miles [6.4 km]). After separation, it goes east and connects to US 52 near Mount Airy, where the first section ends.

I-74 is to be routed along US 52 from Mount Airy to Bethania, where it will then separate onto the new Winston-Salem Northern Beltway and go east around Winston-Salem before connecting to existing I-74 south of Kernersville. Under a new accelerated construction plan for the Beltway, right-of-way acquisition began in 2012 and construction started in December 2014. Until construction is completed, travelers wanting to connect between the first and second section of I-74 should stay on US 52 through downtown Winston-Salem and then take I-40 east to I-74 east toward High Point.[6]

Piedmont Triad

The second section of I-74 extends from the intersection with I-40 in southeastern Winston-Salem to High Point. Until January 2019, this section of I-74 was concurrent with US 311. This section was designated despite not having 10-foot (3.0 m) shoulders, with the promise that shoulders would be widened later. Signs were installed by August 2014. This section connects directly to another section,[7] called the High Point East Belt. It connects High Point with both I-85 Bus. and I-85. Construction completed on June 7, 2013, extended the freeway an additional eight miles (13 km) to US 220/I-73 at milemarker 86 in Randleman.[citation needed] The highway was originally to be completed by October 2012.[8]

I-74 joins with I-73/US 220 south in Randleman going south to Asheboro. The freeway is already completed but was not allowed to be signed as a full Interstate until the segment through Asheboro was upgraded to Interstate Highway standards in December 2013.[citation needed] The fourth section of I-74 (and I-73) starts along a bypass of Asheboro where a project to improve US 220 to Interstate standards was completed, and Interstate signs went up in 2012.[7][9]

I-74 continues concurrently with I-73 and US 220 between I-73 milemarkers 68–42 (26 miles (42 km)), the first section marked as I-74 (and I-73) in North Carolina in 1997. It continues south, bypassing the towns of Seagrove, Biscoe, and Candor. Visitor centers (completed in 2010) are located eastbound and westbound at milemarker 61.[10] After exit 41, US 220 leaves the freeway and the route continues as I-73/I-74 for another 16 miles (26 km) toward Rockingham. Though this part of I-73/I-74 was completed in 2008 and is up to Interstate standards, it was initially signed as a future Interstate route because it had not been accepted into the Interstate Highway System by the Federal Highway Administration (FHWA) by the time it was opened, necessitating the posting of future shields. This situation was remedied on July 7, 2011, when the FHWA approved the addition of this segment to the Interstate Highway System.[11] The route was finally signed as I-73 and I-74 in the fall of 2013.[citation needed]

I-73/I-74/US 220, near Biscoe

In late 2018, this segment was extended by 2.91 miles (4.68 km), from US 220/Haywood Cemetery Road to a partially completed trumpet interchange on US 220 north of Rockingham. A bypass under construction will extend this stretch to the US 74 bypass south of Rockingham.[citation needed]

Sandhills

At Rockingham, Future I-73 and I-74 will separate from current US 220 along a to-be-built bypass around the west of the city and then join the existing US 74 bypass freeway, which goes south around Rockingham and Hamlet. The first section of the bypass, four miles (6.4 km) of upgraded US 220, is under construction with a planned completion date of March 2018.[citation needed][needs update] Future I-73 ends near the NC 38 exit where it is planned to be routed south into South Carolina. Future I-74 continues to the end of the freeway. Between Hamlet and Laurinburg is an at-grade expressway that will eventually be upgraded to Interstate standards.[citation needed] At Laurinburg, I-74 is to use the Laurinburg Bypass that was at the standard North Carolina freeway grade and signed as I-74 in 2008; however, the North Carolina Department of Transportation (NCDOT) had to remove the signage the following year when the FHWA ruled against using them until the freeway was up to Interstate standards.

The third section of I-74 is officially named the American Indian Highway; completed in 2008, this 19-mile (31 km) section stretches from Maxton to south of Lumberton, connecting with I-95/US 301.[12] After NC 41, I-74 ends for the final time as the highway continues on as an at-grade expressway signed as US 74/Future I-74 Corridor.[citation needed]

East of I-95

Future I-74 is to continue to follow US 74, going through the city of Whiteville and bypassing the town of Lake Waccamaw. While there are no funded projects to upgrade the entire highway to Interstate standards, NCDOT is funding several smaller projects to replace intersections with interchanges for several of the remaining cross streets, including for NC 72/NC 130 north of Boardman, and replacing other intersections with grade separations, such as with Old US 74 near Evergreen, over the next 10 years.[citation needed] Before the town of Bolton, it will separate from US 74 onto a proposed new freeway toward Shallotte, then go west on the proposed extension of South Carolina Highway 31 (SC 31, Carolina Bays Parkway) into South Carolina. This entire section of I-74 is still under a feasibility study with several possible routing options; it thus may take years before reaching South Carolina. Current NCDOT plans suggest that construction may not begin until after 2020 and that this will likely be the last section of I-74 to be completed.[13][14][needs update]

An interchange at Boardman Road has begun construction starting May 25, 2021, and is scheduled for completion in 2024. Another interchange at NC 72/NC 130 is due to start in 2022.[needs update] A third project, now combined, would build an interchange at Chauncey Town Road (SR 1735) and a overpass at Old Lake Road (SR 1740) starting in 2025 for an estimated cost of $30 million for both projects. This would almost build a completed freeway to the NC 211 interchange in Bolton with two exceptions: an at-grade intersection at US 74/Creek Road (SR 2225) that would need to be closed and one minor crossing that would be deleted.

Alternate names

Though the highway is commonly known as I-74 throughout the state, the highway does have other known names it uses locally in areas.

  • American Indian Highway—official name of the 19-mile (31 km) section of I-74 in Robeson County (milemarkers 191–213). It is named to honor the large American Indian population in Robeson County.[12]
  • Blue Star Memorial Highway—unofficial North Carolina honorary name of I-74 in Randolph County (dedicated on June 7, 2013).[15][16]
  • High Point East Belt—road name in Guilford County.

History

ISTEA initially authorized the new high priority transportation corridor 5, tentatively known as I-73, to travel from Michigan to South Carolina.[citation needed] Because of several disputes to the routing, a compromise was reached in 1995, by Senator John Warner and Senator Lauch Faircloth, that extended I-74 from its then current eastern terminus of Cincinnati to overlap I-73. (Original plans called for I-73 to run through Winston-Salem and Mount Airy, but, when its alignment was shifted to serve Greensboro, North Carolina, instead, this compromise resulted in I-74 using the Winston-Salem to Mount Airy route.) In Virginia, I-74 would follow I-77 into North Carolina, while I-73 would go east to Roanoke then south along US 220 toward Greensboro.[17][18][19] However, when I-73 crossed a border between two states, the federal law authorizing the road required that the two states agree that their sections meet. Originally, both Carolinas selected a route running south from Rockingham. North Carolina had more money to spend on roads, though,[20] and, on May 10, 1995, the US Senate Environment and Public Works Committee approved North Carolina's plan for I-73 to run eastward to the coast and enter South Carolina at North Myrtle Beach, South Carolina.[21] Another compromise, between Senator Lauch Faircloth and Senator Strom Thurmond, agreed to have both Interstates enter South Carolina: I-73 south of Rockingham and I-74 south of Wilmington, North Carolina.[22][23] After later amendments and the Transportation Equity Act for the 21st Century of 1998 (TEA-21), on July 25, 1998, the American Association of State Highway and Transportation Officials (AASHTO) accepted I-73/I-74 into the Interstate Highway System within the states of South Carolina, North Carolina, and Virginia.[citation needed]

I-74/I-77 near Pine Ridge

The 12.6-mile (20.3 km) portion from south of Steeds north to south of Ulah was completed August 27, 1996, and was the first road marked as I-74 (and I-73).[24] Future signage was also installed north to the Greensboro area.[25] The remainder of the 26 miles (42 km) of existing and new freeway between Ulah and Candor was also signed as I-73/I-74 along US 220.[citation needed] In 1998, NC 752, a freeway spur of I-77 was renumbered as the segment of completed I-74, from I-77 to US 601. On June 30, 1999, the freeway was extended an additional five miles (8.0 km) to US 52, south of Mount Airy. In April 2001, I-74 was overlapped with I-77 from the Virginia state line to exit 101.[citation needed]

In January 2008, a 16.8-mile (27.0 km) section of freeway was completed from Candor to Ellerbe; however, it was signed Future I-73/I-74.[26] On November 22, 2010, a 14-mile (23 km) section (known as the East Belt) was added between North Main Street in High Point to Cedar Square Road near Glenola. This also includes the 6.4-mile (10.3 km) section of new freeway that opened between I-85 Business Cedar Square Road.[27] On October 4, 2012, I-74 was extended west from High Point to I-40, in Winston-Salem.[28]

On June 7, 2013, I-74 extended eight miles (13 km) east onto new primary routing from Cedar Square Road to I-73/US 220, near Randleman. Continuing in concurrency with I-73/US 220, it now connects two segments of the Interstate from Winston-Salem to Candor.

American Indian Highway and Laurinburg Bypass

On September 26, 2008, a 19-mile (31 km) section of I-74/US 74 was opened between Maxton to NC 41 near Lumberton, known as the American Indian Highway.[citation needed] The Laurinburg Bypass was also resigned I-74/US 74 at the same time.[citation needed] By the middle of the following year, the Laurinburg Bypass was removed of its I-74 designation by NCDOT after a ruling from the FHWA (it was resigned as a Future I-74 Corridor). The reason was that the section, though a freeway by North Carolina standards, it was not up to Interstate standards. It was also at this same time that NCDOT fixed an exit number error along milemarkers 181–191.[citation needed]

North Carolina Highway 752

NC Highway 752
Location: Pine Ridge, North Carolina
Length: 1.0 mi[29] (1.6 km)
Existed: 1994–1998

North Carolina Highway 752 (NC 752) was the designation of the four-lane limited-access highway that traversed from I-77 to NC 89, near Pine Ridge. Established in 1994, it was a one-mile (1.6 km) freeway spur. In 1998, the freeway was extended to US 601 and was renumbered as I-74. Its short four-year existence was simply to be a placeholder for I-74.[citation needed]

Future

Pilot Mountain Parkway

From Mount Airy to Rural Hall, US 52 is planned to be upgraded to Interstate standards. However, it is currently flagged "Scheduled for Reprioritization", with no estimated cost or date established.[30]

The section from Rockingham–Hamlet Bypass to Laurinburg Bypass is planned to be upgraded to Interstate standards. However, it is currently flagged "Scheduled for Reprioritization", with no estimated cost or date established.[31] When this section opened, it was signed "Future I-74", but those signs were taken down in late 2016.[citation needed]

A proposed new freeway in Columbus and Brunswick counties would traverse from Whiteville to SC 31 in South Carolina. However, it is currently flagged "Scheduled for Reprioritization," with no estimated cost or date established.[13][14][32][33]

Winston-Salem Northern Beltway

NC Highway 74
Location: Winston-Salem, North Carolina
Length: 5.5 mi (8.85 km)
Existed: 2020–present

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The Winston-Salem Northern Beltway is an under construction freeway loop around the North Carolina city of Winston-Salem. The western section has been designated as NC 452, which will later become I-274 when completed, and the eastern section of the beltway is designated as NC 74, which will later become part of I-74 when completed.[34][35]

On September 7, 2011, North Carolina Governor Bev Perdue announced that construction of a part of the eastern leg of the beltway would begin in 2014. The section to be built connects US 158 to I-40 Bus. (now US 421/Salem Parkway). Right-of-way acquisition began in 2012 and cost $34 million (equivalent to $NaN in 2021[36]); construction was estimated to cost $156 million.[37][38] Construction on the segment, Project U-2579B; commenced in December 2014,[6][38] with an anticipated completion date of November 2018.[citation needed] However, after delays, including an opening date of late 2019,[35] it was finally opened to traffic on September 5, 2020.[39]

Since then, funding has been allocated to complete the remaining sections of NC 74 between US 52 and the current I-74 (formerly cosigned with US 311), starting with the segment between US 311 and US 158, known as Project U-2579C; in October 2017.[citation needed] Construction on this segment began in 2018,[citation needed] this section has since opened to traffic effective December 23, 2020.[40]

That same year, a contract for the segment between NC 66 and US 311, Projects U-2579D, U-2579E, and U-2579F; was awarded. Actual construction began April 2019 and is scheduled to be completed in September 2021.[40][35][needs update] Next, construction on the segments between I-74 and US 421/Salem Parkway, Projects U-2579AA and U-2579AB; are scheduled to begin in 2020[40][6][needs update] and will open in 2024.[35] Construction on the interchange with US 52, which began in 2019,[41] is scheduled to be completed in September 2022.[35][needs update]

Rockingham bypass

A western bypass of Rockingham is planned, beginning at the partially-built trumpet interchange with US 220 where I-73 and I-74 currently end and running southwest to the trumpet interchange between US 74 and US 74 Bus., which will be reconfigured to accommodate the new bypass. Construction was initially scheduled for 2026 but was rescheduled for late 2019 and is planned to last three years, costing $146.1 million.[42][43] Upon completion of the bypass, I-74 will be designated along its length and along US 74 around Rockingham and Hamlet, terminating east of Hamlet at US 74 Bus.[44] The bypass will also carry I-73, which will terminate at the interchange with US 74 west of Rockingham until the section of I-73 extending into South Carolina is completed.[44]

Exit list

County Location mi km Exit Destinations Notes
Surry 0.0 0.0 I‑77 north – Wytheville Western terminus of I-74 at the Virginia state line
Pine Ridge 5.0 8.0 5 I‑77 south – Statesville South end of I-77 overlap
5.6 9.0 6 NC 89 – Mount Airy
7.8 12.6 8 Red Brush Road
Mount Airy 11.0 17.7 11 US 601 – Mount Airy, Dobson
13.0 20.9 13 Park Drive
17.0 27.4 17 US 52 north – Mount Airy
Route transition from I‑74 to Future I‑74
Cook School Road Existing interchanges of US 52 (upgrade to Interstate standards, unfunded)[45]
West Main Street – Pilot Mountain
Pilot Mountain NC 268 – Pilot Mountain, Elkin
Pilot Knob Park Road – Pilot Mountain State Park
Stokes Perch Road – Pinnacle
Forsyth King South Main Street – King, Tobaccoville
Moore-RJR Drive
Rural Hall Westinghouse Road
41A NC 65 – Rural Hall, Bethania Completion scheduled for October 2019 (preliminary work for Northern Beltway project)[6][46]
Bethania 41B US 52 south – Winston-Salem Under construction (completion scheduled for September 2022)Template:Update-needed
Winston-Salem 42 NC 66 (University Parkway) Under construction (completion scheduled for September 2021)[6][41][46]Template:Update-needed
43 NC 8 (Germanton Road)
45 Baux Mountain Road
Walkertown 49 US 311 (New Walkertown Road) Segment currently designated as NC 74, opened on December 23, 2020
50 US 158 (Reidsville Road) Segment currently designated as NC 74, opened on September 5, 2020[6][46][39]
Kernersville 53 US 421 / NC 150 (Salem Parkway)
55 Kernersville Road Future interchanges (construction to start in early 2022 with a completion date of November 2026)Template:Update-needed
Winston-Salem 56 I‑40 – Statesville, Greensboro
55.2 88.8 Route transition from Future I‑74 to I‑74
55 I‑40 – Statesville, Greensboro Temporary designation of I-74, future NC 192
56.6 91.1 56 Ridgewood Road
Union Cross 57 NC 192 west – Winston-Salem Future interchange
58.9 94.8 59 Union Cross Road
60.3 97.0 60 High Point Road
Horneytown 63.0 101.4 63 NC 66 – Kernersville
Guilford High Point 65.0 104.6 65 North Main Street
66.4 106.9 66 Johnson Street
67.4 108.5 67 NC 68 (Eastchester Drive) – High Point, Greensboro To Piedmont Triad International Airport and High Point University
69.0 111.0 69 Greensboro Road
70.3 113.1 70 Martin Luther King Jr. Drive Formerly named Kivett Drive[47]
71.1 114.4 71A East Green Drive
71.7 115.4 71B I‑85 Bus. / US 29 / US 70 – Thomasville, Greensboro
Archdale 75.2 121.0 75 I‑85 – Charlotte, Greensboro
Randolph Glenola 79.4 127.8 79 Cedar Square Road
Sophia 84.0 135.2 84 Old US Highway 311
Randleman 86.8 139.7 86 I‑73 north / US 220 north – Greensboro North end of I-73/US 220 overlap; eastbound left exit
Asheboro 87.9 141.5 79 Pineview Street
89.3 143.7 77 Spero Road
90.7 146.0 76
To US 220 Bus. north / Invalid type: road
91.5 147.3 75 Presnell Street
92.4 148.7 74 NC 42 – Asheboro Left exit; western terminus of NC 42
94.0 151.3 72
A-B
A:
US 64 Bus. east / NC 49 north – Raleigh
B:
US 64 Bus. west / NC 49 south – Lexington, Charlotte
To North Carolina Zoo
95.1 153.0 71 McDowell Road
70 US 64 – Raleigh, Lexington
98.7 158.8 68
US 220 Bus. north / NC 134 south – Ulah, Troy
To US 220 Alt
100.9 162.4 65 New Hope Church Road To North Carolina Zoo
Seagrove 105.1 169.1 61 NC 705 – Seagrove, Robbins
108.4 174.5 58 Black Ankle Road
Montgomery Ether 111.1 178.8 56
US 220 Alt. – Ether, Steeds
Star 114.2 183.8 52 Spies Road – Star, Robbins
Biscoe 117.4 188.9 49 NC 24 / NC 27 – Biscoe, Carthage, Troy
Candor 122.4 197.0 44 NC 211 – Candor, Pinehurst
Emery 125.5 202.0 41
US 220 south / US 220 Alt. north – Candor
South end of US 220 overlap
127.4 205.0 39 Tabernacle Church Road
Richmond Norman 131.4 211.5 35 Moore Street – Norman
133.2 214.4 33 NC 73 – Windblow, Plainview
136.5 219.7 30 Haywood Parker Road
Ellerbe 138.8 223.4 28 To NC 73 west / Invalid type: road
141.5 227.7 25 US 220 north – Ellerbe
23 Dockery Road / Haywood Cemetery Road
22 I‑73 end / US 220 south – Rockingham Partial interchange (rest to be constructed by 2023)[48]
Route transition from I‑74 to Future I‑74
20 Cartledge Creek Road Future interchange to be built as part of Rockingham Bypass project[48]
16
US 74 west / US 74 Bus. east – Wadesboro, Rockingham
Future interchange (funded)[48]
15 Galestown Road – Cordova Existing interchanges of US 74
US 1 to US 220 – Rockingham, Southern Pines, Cheraw
NC 177 – Hamlet, Cheraw
NC 38 – Bennettsville
I‑73 south – Bennettsville Future interchange (unfunded)[49][50]
NC 381 – Hamlet, Gibson Existing interchanges of US 74[31]

US 74 Bus. west – Hamlet
Scotland Laurel Hill NC 144 east (Old Wire Road) – Wagram Existing interchanges of US 74 (upgrade to Interstate standards, unfunded)[31][citation needed]
180.4 290.3 181
US 74 Bus. – Laurinburg
181.2 291.6 182 NC 79 – Laurinburg, Gibson
Laurinburg 182.8 294.2 183 US 15 / US 401 / US 501 north – Fayetteville, Aberdeen, Bennettsville Existing interchanges of US 74 / US 501 (upgrade to Interstate standards, unfunded)[citation needed]
183.2 294.8 184 US 15 Bus. / US 401 Bus. – Laurinburg
184.1 296.3 185 US 501 south – Rowland, Myrtle Beach
185.8 299.0 186 To US 74 Bus. (Highland Road) – Laurinburg Existing interchanges of US 74 (upgrade to Interstate standards, unfunded)[citation needed]
186.6 300.3 187 US 74 Bus. – Laurinburg, Maxton
189.4 304.8 190 Airport Road – Laurinburg–Maxton Airport, Maxton
Robeson Maxton 190.8 307.1 191 NC 71 – Maxton, Red Springs
194.0 312.2 Route transition from Future I‑74 to I‑74
194 US 74 Alt. east / US 74 Bus. west – Maxton Signed as 194A (west) and 194B (east)
197.0 317.0 197 Cabinet Shop Road
200.7 323.0 200 NC 710 – Pembroke, Red Springs
203.9 328.1 203 Dew Road – Pembroke
207.9 334.6 207 Back Swamp Road
Lumberton 209.3 336.8 209 I‑95 / US 301 – Lumberton, Fayetteville, Florence Signed as 209A (south) and 209B (north)
210.5 338.8 210 US 74 Alt. west
213.1 343.0 213 NC 41 – Lumberton, Fairmont
213.6 343.8 Route transition from I‑74 to Future I‑74
219.4 353.1 219 Broadridge Road (SR 2220) Completed November 2019; not currently signed as I-74
222 NC 72 west / NC 130 west – Lumberton, Fairmont Project scheduled to be let January 2023
Columbus Boardman 225 Old Boardman Road (SR 1506) Contract awarded April 20, 2021; interchange construction has started effective May 25, 2021 (completion scheduled for February 2025)
Evergreen 228.9 368.4 228 NC 242 (Haynes Lennon Highway) – Bladenboro, Cerro Gordo Current interchanges of US 74 (upgrade to Interstate standards, unfunded)[13][14]
Chadbourn 233.7 376.1 233 US 74 Bus. east / NC 130 east / NC 410 – Chadbourn, Bladenboro
235.7 379.3 235 US 76 west – Chadbourn, Fair Bluff Existing interchanges of US 74 / US 76 (upgrade to Interstate standards, unfunded)[13][14]
238.5 383.8 238 Union Valley Road
Whiteville 241.4 388.5 241 US 701 – Whiteville, Clarkton
244.3 393.2 244 US 74 Bus. / US 76 Bus. west to NC 214 east – Whiteville, Lake Waccamaw
Hallsboro 248.0 399.1 248 Hallsboro Road (SR 1001) Opened to traffic June 12, 2020; not currently signed as I-74
Lake Waccamaw 252.4 406.2 252 Chauncey Town Road (SR 1735) Roundabout interchange; contract awarded on July 11, 2022; interchange construction will start effective August 2022 (completion scheduled for mid-2025)
Bolton 258.4 415.9 258 NC 211 – Bladenboro, Southport Last exit with I-74 exit number on US 74
Proposed Interstate 74 corridor from US 74/US 76 to US 17/South Carolina state line (route unconfirmed).[13][14][32][33]
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.[full citation needed]
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. 12.0 12.1 Lua error in package.lua at line 80: module 'strict' not found.
  13. 13.0 13.1 13.2 13.3 13.4 Lua error in package.lua at line 80: module 'strict' not found.
  14. 14.0 14.1 14.2 14.3 14.4 Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.[page needed]
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. 31.0 31.1 31.2 Lua error in package.lua at line 80: module 'strict' not found.
  32. 32.0 32.1 Lua error in package.lua at line 80: module 'strict' not found.
  33. 33.0 33.1 Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. 35.0 35.1 35.2 35.3 35.4 Lua error in package.lua at line 80: module 'strict' not found.
  36. Lua error in package.lua at line 80: module 'strict' not found. United States Gross Domestic Product deflator figures follow the Measuring Worth series.
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. 38.0 38.1 Lua error in package.lua at line 80: module 'strict' not found.
  39. 39.0 39.1 Lua error in package.lua at line 80: module 'strict' not found.
  40. 40.0 40.1 40.2 Lua error in package.lua at line 80: module 'strict' not found.
  41. 41.0 41.1 Lua error in package.lua at line 80: module 'strict' not found.
  42. Lua error in package.lua at line 80: module 'strict' not found.
  43. Lua error in package.lua at line 80: module 'strict' not found.
  44. 44.0 44.1 Lua error in package.lua at line 80: module 'strict' not found.
  45. Lua error in package.lua at line 80: module 'strict' not found.
  46. 46.0 46.1 46.2 Lua error in package.lua at line 80: module 'strict' not found.
  47. Lua error in package.lua at line 80: module 'strict' not found.
  48. 48.0 48.1 48.2 Lua error in package.lua at line 80: module 'strict' not found.
  49. Lua error in package.lua at line 80: module 'strict' not found.
  50. Lua error in package.lua at line 80: module 'strict' not found.

External links

Script error: No such module "Attached KML".

  • Media related to Lua error in package.lua at line 80: module 'strict' not found. at Wikimedia Commons
Interstate 74
Previous state:
Virginia
North Carolina Next state:
South Carolina