Bohunice Nuclear Power Plant

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Bohunice Nuclear Power Plant
Jaslovske Bohunice Power Plant 1.JPG
Country Slovakia
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Construction began August 1, 1958
Commission date December 25, 1972
Decommission date 2006, 2008
Owner(s) Slovenské elektrárne, a.s. (V2), Javys, a.s. (A1 and V1)
Operator(s) Electrostation Bohunice
Power generation
Units operational 2 x 505 MW
Units decommissioned 2 x 440 MW, 1 x 143 MW
Annual generation 7,779

The Bohunice Nuclear Power Plant (NPP) (Slovak: Atómové elektrárne Bohunice, abbr. EBO) is a complex of nuclear reactors situated 2.5 km from the village of Jaslovské Bohunice in the Trnava District in western Slovakia.

Bohunice NPP comprises two plants: V1 and V2. Both plants contain two reactor units. The plant was connected to the national power network in stages in the period between 1978 and 1985. The four power reactors are pressurized water reactors of the Soviet VVER-440 design.

Annual electricity generation averages about 12,000 GWh. Upon development of a district heating supply network in the town of Trnava near Bohunice NPP, V2 switched to co-generation. Part of this system is a heat feeder line commissioned in 1987. In 1997 a heat feeder line to Leopoldov and Hlohovec was begun, branching off from the Trnava line.

Bohunice A1 (shutdown)

The A1 is another nuclear reactor situated on the Jaslovské Bohunice site. On February 22, 1977 the A1 reactor suffered a major accident during refueling, rated INES-4. This reactor is currently undergoing a decommissioning and cleanup process.

Bohunice V1 (shutdown)

As a condition of accession into the European Union (2004) Slovakia was forced to deactivate the two reactors at the V1 plant. A provision in the accession treaty allowed for reactivation in case of an emergency.

V1 plant was exempted from Slovenské Elektrárne sale to Enel and transferred to JAVYS, a national nuclear decommissioning company fully owned by the state. The first reactor was shut down at the end of 2006, the second on the last day of 2008.

The Russia-Ukraine gas dispute in January 2009 disrupted natural gas supplies and electricity generation. On January 10, 2009 the Slovak government ordered the second reactor, then still undergoing a shutdown procedure, to be returned into power-generation-capable mode.[1] Eventually, the reactor was not reconnected to the grid and the final shutdown was resumed.[2]

Bohunice V2 (operating)

Bohunice V2 consists of two second generation VVER-440/213 and went online on August 20, 1984 and December 18th 1985, respectively. In November 2010 both reactors were uprated from 440 MW to 505 MW and operation is planned to be maintained until 2025.

Bohunice V3 (planned)

In May 2009 Slovak Prime Minister Robert Fico and Czech PM Jan Fischer announced construction of a new reactor unit at Bohunice. A partnership of the Slovak Nuclear and Decommissioning Company (JAVYS) and the Czech energy company ČEZ will build the plant at a projected cost of around 3.7 billion Euros. The specification of new reactor has not been settled upon but will be rated at between 600 and 1,600 MWe. Four manufacturers have been mooted as possible suppliers: Mitsubishi, Atomenergoprojekt, Westinghouse and Areva. ČEZ is considering combining this project with their concurrent construction of the third and fourth reactors at Temelín Nuclear Power Station. Such a contract would be worth between 7 and 10 billion Euros. The project of constructing a third and fourth reactor at Temelín was cancelled by ČEZ in April 2013.

Notes

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.

External links