Konkan Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Konkan Railway
File:KRLogo.jpeg
Overview
Type Regional rail
Status Operational
Locale Konkan, India
Termini Roha, Maharashtra
Thokur, Karnataka
Stations 123
Website www.konkanrailway.com
Operation
Opened January 26, 1998; 26 years ago (1998-01-26)
Owner Ministry of Railways, Indian Railways
Operator(s) Konkan Railway Corporation
Depot(s) Verna
Technical
Line length 736 km (457.33 mi)
No. of tracks 1
Track gauge 1,676 mm (5 ft 6 in)
Electrification None
Operating speed 120 km/h (75 mph)
Route map
km
to Panvel (CSTM)
0 Roha (RN)
13 Kolad
24 Indapur
30 Mangaon
41 Goregaon Road
47 Veer
55 Sape Wamane
63 Karanjadi
71 Vinhere
Natuwadi Tunnel (4 km)
81 Diwankhavati
98 Khed
112 Anjani
128 Chiplun
Chiplun Tunnel (2 km)
138 Kamathe
Savarde Tunnel (3 km)
147 Sawarda
Shastri Bridge
Parchuri Tunnel (3 km)
150 Aravali
Gad Bridge
171 Sangameshwar
184 Ukshi
Karbude Tunnel (6 km)
197 Bhoke
203 Ratnagiri
Panval Nadi Viaduct
Tike Tunnel (4 km)
219 Nivasar
235 Adavali
Berdewadi Tunnel (4 km)
250 Vilavade
267 Rajapur Road
284 Vaibhavwadi Road
299 Nandgaon Road
314 Kankavali
333 Sindhudurg
343 Kudal
353 Zarap
364 Sawantwadi Road
371 Madure
Maharashtra state / RN limits
Goa state / KAWR limits
Pernem Tunnel (1 km)
382 Pernem
393 Thivim
Mandovi Bridge
411 Karmali
Zuari Bridge
427 Verna, Goa
432 Majorda Junction
435 Suravali
438 Madgaon
456 Balli
Barcem Tunnel (3 km)
472 Canacona
Goa state
Karnataka state
492 Asnoti
Kalinadi Bridge
500 Karwar
Karwar Tunnel (3 km)
513 Harwada
528 Ankol
526 Gokarna Road
555 Kumta
568 Honnavar
Sharavati Bridge
586 Manki
595 Murudeshwara
603 Chitrapur
609 Bhatkal
617 Shiroor
625 Byndoor Mookambika Road
631 Bijoor
644 Senapura
658 Kundapura
674 Barkur
690 Udupi
700 Innanje
706 Padubidri
715 Nandikoor
723 Mulki
732 Surathkal
736 Thokur (KAWR)
Gurupura River
to Hassan Junction (MYS)
to Mangalore Junction (PGT)
Route Map of the Konkan Railway
17-Konkan Railways
An express train passing through Konkan

The Konkan Railway (Railway Symbol:KR) is a railway line which runs along the Konkan coast of India between Mumbai and Mangaluru. It was constructed and is operated by the Konkan Railway Corporation. It runs from Roha in Maharashtra till Thokur in Karnataka for a total distance of 741 km (460 mi), along the west coast of India and Western Ghats.

History

Background

A train negotiating a long bridge between two hills
A train entering Chiplun Railway Tunnel

Until the Konkan Railway started its operations, the two important port cities Mangaluru and Mumbai were not directly connected by the railway network. People would travel by trains running through inland India via Bengaluru-Belagavi-Pune route. In mid twentieth century, people travelling to Mumbai from Mangaluru and adjoining areas would go to Kadur or Birur by bus and then catch a train to Mumbai (Bombay then). In the 1970s National Highway 17 (NH-17) was built to connect these cities by road. Direct bus services started between these two cities after the construction of NH-17. Even though economic reasons provided a strong need to connect these two cities, the region through which the railway track passed was geographically very tough and would be an engineering challenge. Due to the uneven terrain of the region, railway lines were not laid for many years.

Although the brainchild of veteran parliamentarian from Ratnagiri, Nath Pai M.P., national leaders such as Madhu Dandavate and George Fernandes, who hailed from the Konkan played a major role in the conception of Konkan Railway. In 1966, a line was constructed between Diva in Mumbai and Panvel in Raigad district. During the tenure of Madhu Dandavate, this was extended up to Roha in 1986, mainly to serve the industries located in the area. At the same time, works on Mangalore-Thokur line took impetus. However, the missing link from Roha to Mangaluru still remained. In October 1984, the Ministry of Railways decided to take a final location engineering-cum-traffic survey for the west coastal portion from Surathkal to Madgaon - a total distance of 525 km. In March 1985, the railways decided to extend the scope of their survey to include the omitted length of the west coast line extending from Madgaon to Roha. The Southern Railway was entrusted with this final location survey. They submitted the project report for this route to the Railway Ministry in 1988 and named it as the Konkan Railway after the coastline along which it

The project gained impetus after George Fernandes became the Railway Minister in 1989. It was decided to constitute a separately incorporated railway company for the construction and operation of the line. Thus, on July 19, 1990, the Konkan Railway Corporation Limited (KRCL) was incorporated as a public limited company under the Companies Act, 1956, with its headquarters at CBD Belapur in Navi Mumbai and E. Sreedharan, a senior railway official, as its first Chairman and Managing Director. The company set itself a challenging target of five years to complete the work - something that had never been achieved in India before for a project of this magnitude. The foundation stone for the project was laid at Roha on September 15, 1990, and the Corporation had its task cut out.

Challenges

The 1,319 m (4,327 ft) long[1] Konkan Railway bridge across the Zuari river in Goa.

Drawing up their plans in an office, Mr. Sreedharan's team had yet to realise what kind of terrain they would have to battle, and though some surveys had been conducted, there was no data for the entire stretch in Maharashtra - a route which involved half the length of the line. Besides, the task was formidable. With a total number of over 2,000 bridges and 91 tunnels to be built through this mountainous terrain containing many rivers, the project was the biggest and perhaps most difficult railway undertaking during this century, at least in Indian subcontinent.[2] A major challenge in the area was land acquisition as circa 43000 landowners had to be negotiated with. But though land related lawsuits are common in the Konkan, when KRCL began persuading people to give up property that had belonged to their families for generations, many gave it up voluntarily, convinced of the importance of the project. This enabled the entire process to be completed in just a year.[3]

There were challenges posed by the terrain and the elements. Flash floods, landslides and tunnel collapses affected work at many places on the project. The region was also thickly forested, and construction sites were often plagued by wild animals. Despite these problems, work on the project continued, and an effective system of decentralisation enabled better efficiency. The entire stretch of 740 kilometres (460 mi) was divided into seven sectors - Mahad, Ratnagiri, Kudal, Panaji, Karwar, Udupi - of approximately 100 km each, headed by a Chief Engineer.[4]

Contracts for the project were awarded to some of the biggest and most reputed construction firms in India, including Larsen and Toubro, Gammon India and AFCONS. To enable quicker construction, several innovative practices were adopted. Piers for major bridges were cast on the riverbanks itself and launched using cranes mounted on pontoons.[1] The technique of incremental launching of bridge spans was used for the first time in India.[5] Since it would take too long to complete the project using locally available tunnelling technology, nine hydraulic tunnelling machines were imported from Sweden[2] in order to bore through the hard rock of the Sahayadris. The biggest challenge, however, came from the nine tunnels that had to be bored through soft soil. No technology existed anywhere in the world for this purpose and the work had to be carried out through a painstakingly slow manual process. Excavation was almost impossible due to the clayey soil that was saturated with water owing to a high water table in the region. Several times tunnels collapsed immediately after they had been dug, necessitating work to be redone.[6] Nineteen lives and four years were lost while constructing the soft soil tunnels alone.[2][6] In all, seventy-four people perished during the construction of the line.

Controversy

Like most other major projects in India, the Konkan Railway was not without its share of controversies. The biggest one arose in the state of Goa, comprising 105 kilometres (65 mi) of the route, where serious concerns were raised about the environmental and economic impact of the line on the state. The opponents to the project stated that the proposed alignment, passing through the coastal regions of the state, would cause destruction of ecology, damage to historical sites and distrupt the lifestyles of people in the densely populated coastal region of the state. In 1991, they came together under an umbrella organisation called the Konkan Railway Re-Alignment Committee (KRRAC) and organised protests against the proposed alignment of the railway line.[7]

The main points raised by the KRRAC were that the existing alignment would cause flooding in coastal regions, destroy the fertile khazan lands, harm the monuments of Old Goa, cause irreparable damage to the marshes and mangrove swamps along the coastline and estuaries of the Mandovi and Zuari rivers, and result in the large-scale displacement of neighbourhoods along the coastal belt through which it passed. The KRRAC proposed an alternative alignment for the line, known as the hinterland alignment, to offset these problems. The hinterland alignment, passing through the relatively unpopulated hinterland of the state, was to be longer by about 25 kilometres (16 mi), but according to the KRRAC, would significantly minimise the damage caused to the environment.[8]

The hinterland alignment was rejected by the Konkan Railway Corporation on the grounds that it would involve substantial diversion of the line, deny rail access to the major towns of the state, and result in severe delays and escalation of costs of construction. By then, the KRRAC had grown into a political movement, backed by the powerful Church and certain political parties. In March 1992, it filed a public interest litigation in the Bombay High Court, seeking an injunction on the construction work and a diversion of the line through the hinterland alignment. In the plaint, it raised all the issues that had been brought up earlier. The High Court dismissed the plaint in April 1992, observing that <templatestyles src="Template:Blockquote/styles.css" />

...the claim of the petitioners that the alignment would have devastating and irreversible impact upon the khazan lands is without any foundation, and even otherwise, the extent of damage is extremely negligible and a public project of such a magnitude which is undertaken for meeting the aspirations of the people on the west coast cannot be defeated on such considerations. It is not open to frustrate the project of public importance to safeguard the interest of few persons. It cannot be overlooked that while examining the grievance about adverse impact upon a small area of 30 hectares of Khazan lands, the benefit which will be derived by large number of people by construction of rail line cannot be brushed aside. The Courts are bound to take into consideration the comparative hardship which the people in the region will suffer by stalling the project of great public utility. The cost of the project escalates from day to day and, as pointed out by the Corporation, the extent of the interest and east which will be suffered by the Corporation every day is to the tune of Rs. 45 lakhs. No development is possible without some adverse effect on the ecology and environment...[9]

Completion

Amid all the controversies and problems dogging the project, work continued to progress. In March 1993, the southernmost section of 47 kilometres (29 mi) between Thokur and Udupi in Karnataka was inaugurated, followed by the northernmost section of 47 kilometres (29 mi) between Roha and Veer in Maharashtra in June 1993. The first passenger train on the route was run between Mangaluru and Udupi on 20 March 1993. The service was extended by 51 kilometres (32 mi) from Veer to Khed in March 1995, and by a further 265 kilometres (165 mi) from Khed to Sawantwadi Road in December 1996. Services on the southern end were extended by 32 kilometres (20 mi) from Udupi to Kundapura in January 1995, and by a further 275 kilometres (171 mi) till Pernem in Goa in August 1997.[10] However, through services between Mumbai and Mangalore continued to remain on hold due to a problematic tunnel at Pernem, which was facing repeated cave-ins and flooding.[11] The tunnel was finally completed in January 1998, six years after its construction had commenced.[12][13] Through services on the line commenced after a formal inauguration of the entire stretch of 740 kilometres (460 mi) from Roha to Mangaluru on January 26, 1998.[14] Trains carrying passengers started running along the full route between Mumbai and Mangaluru from May 1998.[15] In October 1997, Mr. Sreedharan was asked to take up the responsibility of construction of the Delhi Metro Project.

Organisation

Karwar Railway station

KR does not have divisions like the other Indian Railways; however, it has two regions with headquarters at Ratnagiri in Maharashtra and Karwar in Karnataka. The Ratnagiri region extends over 480 kilometres (300 mi) from Roha to Sawantwadi in Maharashtra, while the Karwar region extends over 660 kilometres (410 mi) from Pernem in Goa to Surathkal in Karnataka.

Route

Barkur Railway station

The route is a single-line track, and is not electrified. The total length of the line is about 738 kilometres (459 mi). Although it has been designed for high-speed traffic of 160 kilometres per hour (99 mph), the fastest train on the route, the Trivandrum Rajdhani Express, at present runs at a maximum speed of 110 kilometres per hour (68 mph). The route is open to both freight and passenger traffic. The line, which runs parallel to the Arabian Sea coastline, offers some of the most spectacular views of any Indian rail journey.The Konkan railway route intersects national highway NH-17 at many places.

There are fifty-six stations on the entire line. Although the route is currently a single line, KR and South Western Railway lines run parallel from Majorda to Margao in Goa, making that section a double line.

According to a study conducted by Konkan Railway, doubling the track is possible on about 300 km that runs on the plains. There are several patches along the 738 kilometres (459 mi) line that can be converted to double track. For example, the 47 km from the starting point at Roha to Veer. The 60 km stretch between Udupi and Mangalore is another stretch[16]

Doubling of tracks on the route: On 3rd of November 2015 the Konkan Railway CMD Bhanu P Tayal announced to the press that "All paper works, including financing modalities, have been completed and foundation-laying ceremony would take place on November 8 in Kolad in the presence of Railway Minister Suresh Prabhu", [17] "Doubling of the tracks along with the electrification would start from November 8. The process of awarding the tender would begin soon. LIC has come forward to finance us and offered loan of Rs 250 crore at cheaper rates and other major finance companies have shown their interests to fund the project,", The project of doubling tracks is estimated to cost the exchequer Rs 10,000 crore while the electrification project will cost around Rs 750 crore. Konkan Railways has fixed the target of completing this project in next five years.

Operations

Passenger

The route became quite popular with passengers from the day it was opened, due to the connectivity it provided to regions hitherto inaccessible by rail, as well as the substantial savings in time for commuters between western and southern India. Several trains, which earlier took circuitous routes were diverted via the Konkan Railway, leading to a reduction in running time. The first of these was the Mumbai - Mangaluru Netravati Express later extended to Trivandrum, which was diverted via the Konkan Railway from March 1, 1998, followed by the Trivandrum Rajdhani from April 1, 1998.[18] The Matsyaganda Express running from Lokmanya Tilak Terminus to Mangalore was flagged off on May 1, 1998.[15] The Hazrat Nizamuddin - Mangalore Mangala Lakshadweep Express was diverted on the route from August 1, 1998 and extended to Ernakulam Junction.[19] The Pune-Ernakulam Junction Express was introduced on February 25, 1999.[20] Another train called Marusagar Express, which runs between Jaipur and Ernakulam Junction (Now extended till Ajmer) via the Konkan Railway began its service on October 12, 2001.[21] The Jan Shatabdi Express was flagged off between Mumbai and Madgaon (longest running Jan Shatabdi)on April 16, 2002, to commemorate 150 years of the existence of Indian Railways.[22][23] On February 1, 2008, a Garib Rath between Kochuveli satellite station of Thiruvananthapuram and Lokmanya Tilak Terminus was flagged off.[24] Other trains like Trivandrum Central- Veraval, Gandhidham - Trivandrum- Nagercoil, Bikaner- Kochuveli, New Delhi- Kochuveli, Mangalore-Verna Passenger, Konkan Kanya Express and Mandovi Express from Goa to Mumbai, Kerala Sampark Kranti Express from Chandigarh to Kochuveli, Amritsar- Kochuveli Superfast Express, Happa-Tirunelveli Superfast Express and Kochuveli Dehradun Superfast Express also pass through Konkan.

In 2009 Mumbai-Karwar tri-weekly Super Fast express was introduced. But within a year it was extended to Mangalore Junction railway station and now it runs daily. In year 2011 Pune-Ernakulam Super Fast express via Panvel was introduced on bi-weekly basis. In 2012, a train from Sawantwadi To Dadar was launched, named as Rajya Rani Express.

The latest trains are Porbander- Kochuveli, Bhavnagar- Kochuveli and Bikaner Coimbatore Superfast AC express via Konkan and the extension of the Yeshvantpur-Mangalore tri-weekly Express to Karwar. Most recently, from October 2012 the Yeshwantpur-Mangalore-Karwar Overnight Express is now bifurcated at Mangalore Central and the main portion now runs to Karwar fulfiling a long-standing demand of the Coastal Karnataka populace and fulfiling a Karnataka High Court Order considering a PIL (Public Interest Litigation) for a night train service between Karwar and Bengaluru. Currently the fastest train on this line is the Lokmanya Tilak Terminus to Ernakulam Biweekly Duronto Express which runs non stop via the Konkan Railway. In 2014 railway ministry has decided to run an AC double decker train between Lokmanya Tilak Terminus (Kurla) and Madgaon in Goa. The train was to make its inaugural run during Ganesh Chaturthi but has extended the inauguration date in late October. In February 2015, a passenger train was introduced from Byndoor (Karnataka) to Kasaragod (Kerala) running daily.This train was later extended to Kannur.

Freight

A RORO train seen at Sawantwadi Road station.
Approaching ends of tunnels are chain locked to prevent land sliding and shooting stones

Freight response to the Konkan Railway was lukewarm, prompting the worried corporation to consider cutting rates.[25] With an outstanding debt of 3,375 crore, KRCL was banking on freight traffic to bail it out.[26] In an effort to attract freight traffic, the corporation began creating awareness among local industries on the route.[27] In 1999, the corporation introduced the Roll-on/roll-off (RORO) service, a unique road-rail synergy system, on the section between Kolad in Maharashtra and Verna in Goa,[28] which was extended up to Surathkal in Karnataka in 2004.[29][30] The RORO service, the first of its kind in India, allowed trucks to be transported on flatcars. It was highly popular,[31] carrying about 1.6 lakh trucks and bringing in over 120 crore worth of earnings to the corporation till 2009.[32]

Difficulties

The hostile terrain and difficult weather conditions of the Konkan region resulted in problems continuing to dodge the line even after its inauguration. The first problems surfaced during the monsoon of 1998, when torrential rainfall caused landslides at many places, washed away tracks and disrupted services.[33] Despite the corporation's efforts at addressing the problems through engineering measures such as protective netting along cuttings to prevent boulders from rolling onto the tracks, the problems continued to recur each year.[34][35]

The first major accident on the line occurred on the night of June 22, 2003, when a landslide caused an express train travelling from Karwar to Mumbai to derail at the entrance to a tunnel. Fifty-one people died as a result of the accident, and several others were injured. As a result of the accident, the corporation came under heavy criticism for failing to adhere to adequate safety measures in the landslide-prone region.[36] An inquiry revealed the cause of the accident to be a failure of a cutting due to absence of monsoon patrolling.[37] The findings were disputed by the corporation, which insisted that the lack of monsoon patrolling did not lead to the accident which was entirely a result of the forces of nature.[37] Shortly after the accident, the corporation announced that it would enhance safety measures on the route.[38][39]

Barely a year later, these measures were found to be inadequate when a second major accident occurred on the line on June 16, 2004. The Matsyaganda Express bound to Mumbai from Mangalore derailed and fell off a bridge after colliding with boulders on the tracks, killing 20 people.[40][41] Again, the corporation insisted that the mishap was a result of nature's fury.[42][43] After the accident, questions were raised about the safety and credibility of the Konkan Railway,[44][45] prompting the resignation of its director Rajaram Bojji on August 31, 2004.[citation needed] An enquiry by the Commissioner of Railway Safety revealed the cause of the accident to be due to "falling of boulders and earth" on the tracks.[46] After the report, the corporation swung into action, implementing all its recommendations, including limiting the speed of trains during the monsoon to 75 km/h (47 mph) as opposed to the regular speed limit of 120 km/h (75 mph), as well as undertaking several geo-technical engineering works, including boulder netting, shotcreting, rock bolting, micropiling and vetiver plantations along the line to increase safety.[47][48]

In August 2014 a freight train derailed in a tunnel near Karanjadi railway station causing disruption of services on the line for a week.

In the Media

The Konkan Railway has featured in a recent episode of Channel 5 Television's series Chris Tarrant's Extreme Railways.

See also

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. The Goa Foundation v. Konkan Railway Corporation, AIR 1992 Bom. 571.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. Lua error in package.lua at line 80: module 'strict' not found.
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. Lua error in package.lua at line 80: module 'strict' not found.
  37. 37.0 37.1 Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. Lua error in package.lua at line 80: module 'strict' not found.
  40. Lua error in package.lua at line 80: module 'strict' not found.
  41. Lua error in package.lua at line 80: module 'strict' not found.
  42. Lua error in package.lua at line 80: module 'strict' not found.
  43. Lua error in package.lua at line 80: module 'strict' not found.
  44. Lua error in package.lua at line 80: module 'strict' not found.
  45. Lua error in package.lua at line 80: module 'strict' not found.
  46. Lua error in package.lua at line 80: module 'strict' not found.