Kori Nuclear Power Plant
Kori Nuclear Power Plant | |
---|---|
File:Kori nuclear power plant.JPG
Kori Nuclear Power Plant, Reactors Kori 1, Kori 2, Kori 3, Kori 4 from right to left.
|
|
Location of Kori Nuclear Power Plant in South Korea
|
|
Country | South Korea |
Location | Gori, Busan |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | 1978 |
Operator(s) | Korea Hydro & Nuclear Power |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Westinghouse KEPCO E&C |
Cooling source | Sea of Japan (East sea of Korea) |
Cooling towers | no |
Power generation | |
Units operational | 1 X 556 MWe 1 X 605 MWe 2 x 895 MWe 2 X 960 MWe |
Make and model | GEC Turbines (Rugby) Doosan |
Units under const. | 2 X 1,340 MWe |
Nameplate capacity | 4,414 MW Planned: 8,030 MW |
The Kori Nuclear Power Plant (Korean: 고리원자력발전소, Hanja: 古里原子力發電所) is a South Korean nuclear power plant located in Kori, a suburban village in Busan. It is owned and operated by Korea Hydro & Nuclear Power, a subsidiary of KEPCO. The first reactor began commercial operation in 1978.
An expansion of the plant begun in 2006 added four new Korean-sourced reactors, the so-called Shin Kori reactors. The first pair of Shin Kori reactors are of the OPR-1000 design, while the second two are the APR-1400 design. By November 2010 the first was online and the rest undergoing trials or construction. Two further APR-1400 reactors are in planning.
Reactors
So far, all reactors on site are pressurized water reactors.
Name | Net Electric Output | First Criticality | Commercial Start | Reactor Supplier | NSSS supplier | Architecture | Construction |
---|---|---|---|---|---|---|---|
Kori 1 | 556 MWe | 06/1977 | 04/1978 | Westinghouse | GEC Turbines (Rugby) | Gilbert | Westinghouse |
Kori 2 | 605 MWe | 04/1983 | 07/1983 | Westinghouse | GEC Turbines (Rugby) | Gilbert | Westinghouse |
Kori 3 | 895 MWe | 01/1985 | 09/1985 | Westinghouse | GEC Turbines (Rugby) | Bechtel | Hyundai |
Kori 4 | 895 MWe | 10/1985 | 04/1986 | Westinghouse | GEC Turbines (Rugby) | Bechtel | Hyundai |
Shin Kori 1 | 960 MWe | 06/2010 | 02/2011 | KHNP/KEPCO | Doosan | KOPEC | Hyundai |
Shin Kori 2 | 960 MWe | 12/2011 | 07/2012 | KHNP/KEPCO | Doosan | KOPEC | Hyundai |
Shin Kori 3 | 1,400 MWe | 12/2015 | mid 2016[1] | KHNP/KEPCO | Doosan | KOPEC | Hyundai |
Shin Kori 4 | 1,400 MWe | early 2017[1] | KHNP/KEPCO | Doosan | KOPEC | Hyundai | |
Shin Kori 5[2] | 1,400 MWe | Unknown | Unknown | Unknown | Unknown | Unknown | |
Shin Kori 6[2] | 1,400 MWe | Unknown | Unknown | Unknown | Unknown | Unknown |
(NSSS = nuclear steam supply system)
Incidents
On 9 February 2012 at 8:30 p.m. Kori 1 was shut down for regular inspections. After this the reactor lost all power for 12 minutes, and the diesel generator did not start. The reactor was to be inspected and the nuclear fuel was to be exchanged. According to the South Korean nuclear regulator all facilities for the spent-fuel-pool and the cooling of the reactor were still operational. The incident was not reported to the regulator before 12 March 2012.[3] The incident was graded at INES level 2.[4] Subsequently five senior engineers were charged for a coverup of the serious incident.[5]
On 2 October 2012 at 8:10 a.m. Shingori 1 was shut down after a warning signal indicated a malfunction in the control rod system. An investigation is currently underway to verify the exact cause of the problem.[6]
In June 2013 Kori 2 was shutdown, and Kori 1 ordered to remain offline, until safety-related control cabling with forged safety certificates is replaced.[7] Control cabling installed in the APR-1400s under construction failed flame and other tests, so need to be replaced delaying construction by up to a year.[8]
In October 2013 cable installed in Shin Kori 3 failed safety tests, including flame tests. Replacement with U.S. manufactured cable has delayed the startup of the plant.[8][9]
See also
References
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ NHK-world (13 March 2012) S.Korean nuclear plant lost power for 12 minutes
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Yonhap News (2 October 2012) Nuclear reactor halts operation due to malfunction
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.