Line 6, Guangzhou Metro

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Line 6, Guangzhou Metro
Line 6
6号线
80x33px
265px
Overview
Type Rapid transit
System Guangzhou Metro
Status Open
Termini Xunfenggang
Changban
Stations 20
Services 2
Daily ridership 600,000 (2014 Avg.)[1]
822,000 (2015 Peak)[2]
Operation
Owner City of Guangzhou
Operator(s) Guangzhou Metro Corporation
Character Underground/Elevated (Three stations)
Technical
Line length 24.5 km (15.2 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rails, 1,500 V DC
Route map
Second phase (under construction)
Reserved extension
Luogang Depot
Xiangxue
Luogang
Connection with Line 21
Suyuan 21 
 Zengcheng Square – Yuancun 
Xian'gang
Jinfeng
Huangbei
Gaotangshi
Kemulang
Longdong
South China Botanical Garden
Reserved route split
Changban
Tianhe Coach Terminal 3 
Yantang 3 
 Airport South – Panyu Square 
Tianpingjia
Guangshen Railway
Shahe 11 
Shaheding
Huanghuagang
Ouzhuang 5 
 Jiaokou – Wenchong 
 Xilang – GZ East Railway Station 
Dongshankou 1 
Donghu
Tuanyida Square
Beijing Lu
Haizhu Square 2 
 Jiahewanggang – GZ South Railway Station 
Yide Lu
Cultural Park 8 
 Baiyun Lake – Wanshengwei 
Huangsha 1 
 GZ East Railway Station – Xilang 
Ruyifang 11 
Pearl River
Guangmao Railway
Tanwei 5 
 Wenchong – Jiaokou 
Connection with Line 5
Hesha
Baisha River
Shabei
Hengsha
Beihuan Expressway
Xunfenggang
Jingguangshengang HSR
Xunfenggang Stabling Yard

Line 6 of the Guangzhou Metro (Chinese: 广州地铁6号线; pinyin: Guǎngzhōu Dìtiě Liù Hào Xiàn) or Luogang Line (Chinese: 萝岗线; pinyin: Luógǎng Xiàn) runs from Liwan District to Tianhe District and in the future to Luogang District. It starts at Xunfenggang and ends at Changban, interchanging with Line 5 at Tanwei, Line 1 at Huangsha, Line 8 at Cultural Park, Line 2 at Haizhu Square, Line 1 at Dongshankou, Line 5 at Ouzhuang, Line 3 at Yantang and Tianhe Coach Terminal Station. The total length is 41.9 km with 32 stations. The color of Line 6 is Purple. The phase one section between Xunfenggang and Changban began to provide service from December 28, 2013 with the exception of Yide Lu and Shahe stations.[3] Yide Lu Station opened over a year later on 28 January 2015.

Station listing

Station Name
English
Station Name
Hanzi
Platform Types
Transfer/Connection
Location
Xunfenggang 浔峰岗 island-side (ele) Baiyun
Hengsha 横沙 side (ele)
Shabei 沙贝 side (ele)
Hesha 河沙 island (und) Liwan
Tanwei 坦尾 side (und)  5 
Ruyifang 如意坊 island (und)
Huangsha 黄沙 island (und)  1 
Cultural Park 文化公园 island (und)
Yide Lu 一德路 split (und) Yuexiu
Haizhu Square 海珠广场 split (und)  2 
Beijing Lu 北京路 island (und)
Tuanyida Square 团一大广场 split (und)
Donghu 东湖 island (und)
Dongshankou 东山口 split (und)  1 
Ouzhuang 区庄 split (und)  5 
Huanghuagang 黄花岗 split (und)
Shaheding 沙河顶 island (und) Tianhe
Shahe 沙河 split (und)
Tianpingjia 天平架 island (und)
Yantang 燕塘 island (und)  3 
Tianhe Coach Terminal 天河客运站 island (und)  3 
Changban 长湴 island (und)
Botanical Garden 植物园 Under construction
Longdong 龙洞
Kemulang 柯木塱
Gaotangshi 高塘石
Huangbei 黄陂 Luogang
Jinfeng 金峰
Xiangang 暹岗
Suyuan 苏元
Luogang 萝岗
Xiangxue 香雪

References

  1. 六号线开通一周年:全线客流每天近60万人次
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.