List of power stations in Uganda
From Infogalactic: the planetary knowledge core
This page lists all power stations in Uganda. As of October 2015, according to the Ugandan Ministry of Energy, the national generation capacity stood at 852 megawatts, with peak demand of 540 megawatts.[1] Two new solar power stations are expected to come online in December 2015, bringing total installed capacity nationally to 872 megawatts.[2]
Contents
Completed hydroelectric power stations
Hydroelectric power station | Community | Coordinates | Type | Capacity (megawatts) | Year completed or completion expected | Name of reservoir | River |
---|---|---|---|---|---|---|---|
Bugoye Power Station | Bugoye, Kasese District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 13 | 2009[3] | N/A | River Mubuku |
Bujagali Power Station | Bujagali, Buikwe District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 250 | 2012[4] | N/A | River Nile |
Kabalega Power Station | Buseruka, Hoima District | Lua error in package.lua at line 80: module 'strict' not found. | Reservoir | 9.0 | 2013[5] | Buseruka Reservoir | River Wambabya |
Kanungu Power Station | Kanungu, Kanungu District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 6.6[6] | 2011 | N/A | River Ishasha |
Kiira Power Station | Jinja, Jinja District | Lua error in package.lua at line 80: module 'strict' not found. | Reservoir | 200 | 2000[7] | Lake Victoria | River Nile |
Mpanga Power Station | Mpanga, Kamwenge District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 18[8] | 2011 | N/A | River Mpanga |
Mubuku I Power Station | Kitoko, Kasese District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 5[9] | 1950s | N/A | River Mubuku |
Mubuku III Power Station | Mubuku, Kasese District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 10[10] | 2009 | N/A | River Mubuku |
Nalubaale Power Station | Njeru, Buikwe District | Lua error in package.lua at line 80: module 'strict' not found. | Reservoir | 180 | 1954[11] | Lake Victoria | River Nile |
Nyagak Power Station | Paidha, Zombo District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 3.5[12] | 2012 | N/A | River Nyagak |
Kisiizi Power Station | Kisiizi, Rukungiri District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 0.3[13] | 2008 | N/A | River Kisiizi |
Gwere-Luzira Power Station | Gwere-Luzira, Moyo District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 0.0005 (0.5 kilowatts)[14] | 2009 | N/A | River Amoa |
Hydroelectric power stations under construction
Hydroelectric power station | Community | Coordinates | Type | Capacity (megawatts) | Year completed or completion expected | Name of reservoir | River |
---|---|---|---|---|---|---|---|
Isimba Power Station[15] | Isimba, Kamuli District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 183.2[16] | 2016[17] | N/A | River Nile |
Karuma Power Station[18] | Karuma, Kiryandongo District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 600[19] | 2018[20] | N/A | River Nile |
Maziba Power Station | Maziba, Kabale District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 6.5[21] | 2017[22] | N/A | River Maziba |
Proposed hydroelectric power stations
Hydroelectric power station | Community | Coordinates | Type | Capacity (megawatts) | Year completed or completion expected | Name of reservoir | River |
---|---|---|---|---|---|---|---|
Agbinika Power Station | Yumbe, Yumbe District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 20[23] | 2025 | N/A | Kochi River |
Ayago Power Station[24] | Ayago, Nwoya District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 600[25] | 2023 | N/A | River Nile |
Muzizi Power Station | Ndaiga, Hoima District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 44.7[26] | 2019 | N/A | River Muzizi |
Nengo Bridge Hydropower Station | Nengo Rukungiri District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 6.7 | 2017[27] | N/A | River Mirera |
Nyagak II Power Station | Paidha, Zombo District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 5[28] | 2017 | N/A | River Nyagak |
Nyagak III Power Station | Paidha, Zombo District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 4.36[29] | 2018 | N/A | River Nyagak |
Waki Power Station | Butiaba, Masindi District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 5[30] | 2017 | N/A | River Waki |
Kikagati Power Station | Kikagati, Isingiro District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 16 | 2017.[31] | N/A | River Kagera |
Nshungyezi Power Station | Nshungyezi, Isingiro District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 39[32] | 2022 | N/A | River Kagera |
Nyamwamba Power Station | Kilembe, Kasese District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 14[33] | 2017 | N/A | River Nyamwamba |
Rwimi Power Station | Rwimi, Kabarole District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 5.6[34] | 2017 | N/A | River Rwimi |
Siti Hydroelectric Power Station | Siti, Bukwo District | Lua error in package.lua at line 80: module 'strict' not found. | Run of river | 21.5[35] | 2017 | N/A | River Siti |
Completed thermal power stations
Thermal power station | Community | Coordinates | Fuel type | Capacity (megawatts) | Year completed or completion expected | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Bugala Power Station | Kalangala, Bugala Island | Lua error in package.lua at line 80: module 'strict' not found. | Biodiesel | 1.5[36] | 2010 | Bidco | Operational |
Namanve Power Station[37] | Namanve, Mukono Municipality | Lua error in package.lua at line 80: module 'strict' not found. | Fuel Oil | 50[38] | 2008 | Jacobsen | Preserved for use during peak hour demands. In July 2011, Uganda government decommissioned two diesel-powered thermal plants, each with 50MW capacity, to save money in a tight economy.[39][40] |
Tororo Thermal Power Station | Tororo | Lua error in package.lua at line 80: module 'strict' not found. | Biodiesel Fuel oil Crude oil |
80[41] | 2010 | Electro-Maxx | First indigenous independent power plant established and funded by Africans anywhere on the Continent |
Kakira Power Station | Kakira, Jinja District | Lua error in package.lua at line 80: module 'strict' not found. | Bagasse | 52[42] | 2005 | Madhvani Group | Upgraded to 52MW during 2013[43] |
Kinyara Power Station | Kinyara, Masindi | Lua error in package.lua at line 80: module 'strict' not found. | Bagasse | 40[44] | 2009 | Kinyara Sugar Works Limited | Capacity in 2009 was 14.5MW. Power Station currently under expansion to 40MW capacity by 2015.[45] |
Kaliro Power Station | Buwaya, Kaliro District | Lua error in package.lua at line 80: module 'strict' not found. | Bagasse | 12[46] | 2014 | Sugar & Allied Industries Limited | Capacity in 2014 is 12MW, of which 3MW is used internally by SAIL, the remaining 9MW is sold to the national grid. |
Lugazi Power Station | Lugazi, Buikwe District | Lua error in package.lua at line 80: module 'strict' not found. | Bagasse | 14[47] | 2007 | Sugar Corporation of Uganda Limited | Capacity in 2010 was 5MW, fully utilized internally by SCOUL. |
Mayuge Thermal Power Station | Mayuge, Mayuge District | Lua error in package.lua at line 80: module 'strict' not found. | Bagasse | 1.6[48] | 2005 | Mayuge Sugar Industries Limited | In April 2014, the owners applied for license to expand to 21-23 MW.[49] |
Proposed thermal power stations
Thermal power station | Community | Coordinates | Fuel type | Capacity (megawatts) | Year completed or completion expected | Name of Owner | Notes | |
---|---|---|---|---|---|---|---|---|
Katwe Power Station | Uganda to construct more power plants to generate 2,550 MW | Lake Katwe Kasese District |
Lua error in package.lua at line 80: module 'strict' not found. | Geothermal power | 150[50] | 2015 | AAE Systems Inc. & Katwe Geothermal Limited | Katwe Power Station Expected Online in 2015 |
Nzizi Power Station | Nzizi Hoima District |
Lua error in package.lua at line 80: module 'strict' not found. | Natural gas, Heavy fuel oil | 100[51][52] | 2017 | Tullow Oil Plc. & Jacobsen Elektro | Nzizi expected online in 2017. |
Hybrid power stations
Hybrid power station | Community | Coordinates | Fuel types | Capacity (megawatts) | Year completed or completion expected | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Bukuzindu Hybrid Solar and Thermal Power Station | Bukuzindu Kalangala District |
Lua error in package.lua at line 80: module 'strict' not found. | Solar power & Diesel fuel | 1.6[53] | 2014 | KIS & Uganda Development Corporation | Second power station on Bugala Island after Bugala Power Station owned by BIDCO |
Proposed solar power stations
Solar power station | Community | Coordinates | Fuel type | Capacity (megawatts) | Year completed | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Namugoga Solar Power Station | Wakiso District | Lua error in package.lua at line 80: module 'strict' not found. | Solar | 50[54] | 2018 (Expected) | Solar Energy for Africa & Naanovo Energy Inc. | In development |
Soroti Solar Power Station[55] | Soroti District | Lua error in package.lua at line 80: module 'strict' not found. | Solar | 10 | 2015[56] | Access Power MEA (Access) & TSK Electronica |
In development |
Tororo Solar Power Station | Tororo District | Lua error in package.lua at line 80: module 'strict' not found. | Solar | 10 | 2015[57] | Simba Telecoms Limited & Building Energy SpA |
In development |
Uganda Solar Power Station I[58] | To Be Determined | Solar | 125[59] | 2016 | UDC, Ergon Solair & Martifer Solar |
In development[60] | |
Uganda Solar Power Station II[58] | To Be Determined | Solar | 125[59] | 2016 | UDC, Ergon Solair & Martifer Solar |
In development[60] | |
Uganda Solar Power Station III[58] | To Be Determined | Solar | 125[59] | 2016 | UDC, Ergon Solair & Martifer Solar |
In development[60] | |
Uganda Solar Power Station IV[58] | To Be Determined | Solar | 125[59] | 2016 | UDC, Ergon Solair& Martifer Solar |
In development[60] |
See also
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Namanve Power Station Commissioned in 2008
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 58.0 58.1 58.2 58.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 59.0 59.1 59.2 59.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 60.0 60.1 60.2 60.3 Lua error in package.lua at line 80: module 'strict' not found.
External links
- As of February 2015 Installed Electricity Capacity Was 850MW With Peak Demand of 600MW
- UEGCL Vows To Bring Down Electricity Tariffs
- Uganda’s Energy Sector Grows Despite Challenges
- Generation Capacity To Hit 1,672MW by 2018
- Uganda Begins Construction of The 220KV Nkenda - Fort Portal - Hoima Transmission Line In 2014
- Karuma Power Plant Paves Way For More Hydropower Stations
- Albertine Region To Become Uganda's Energy Hub
- Uganda Plans To Double Size of Power Grid By 2019