MAX IV

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

MAX IV aerial photo
MAX IV in Lund nearing completion.

MAX IV is the planned next-generation synchrotron radiation facility in Lund, Sweden. Its design and planning has been carried out within the Swedish national laboratory, MAX-lab, which operates three accelerators for synchrotron radiation research.

On 27 April 2009 the Swedish Ministry of Education and Research, Swedish Research Council, Lund University, Region Skåne and Vinnova, a Swedish government funding agency, decided to fund the research center.[1]

The construction site of MAX IV,[2] on the fields of Brunnshög in Lund North East, has been opened in 2010.The new laboratories, including two storage rings and a full-energy linac, will be built here. The larger of the two storage rings has a circumference of 528 meters, operates at 3 GeV energy, and has been optimized for high-brightness x-rays. The smaller storage ring (circumference 96 meters) is operated at 1.5 GeV energy and has been optimized for UV. There are also plans for a future expansion of the facility that would add a Free Electron Laser (FEL) to the facility, but is yet to be funded.[1]

The inauguration of MAX IV is planned on the day of summer solstice in 2016 (June 21).[3] At this point the 3GeV ring along with the first few beam-lines will be opened for users to start their experiments. The smaller storage ring will not be opened until later that year.

See also

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.

External links