Mahatma Gandhi Setu

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Mahatma Gandhi Setu
GandhiSetu1.jpg
A view of Mahatma Gandhi Setu
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Carries 4 lanes of roadway and pedestrian pathways each side
Crosses Ganga River
Locale Patna - Hajipur
Official name Mahatma Gandhi Setu
Maintained by National Highways Authority of India
Characteristics
Design Girder bridge
Material Concrete and steel
Total length 5.8 km (3.6 mi)
Width 25 m (82 ft)
Number of spans 47
Piers in water 40
Clearance below 265
History
Designer Gammon India
Construction begin 1972
Construction end 1982
Opened May 1982
Statistics
Toll No (closed)[1]

Mahatma Gandhi Setu (also called Gandhi Setu or Ganga Setu) is a bridge over the river Ganges connecting Patna in the south to Hajipur in the north of Bihar.[2] Its length is 5,575 metres (18,291 ft)[3] and it is one of the longest river bridges in India.[4][5] It was inaugurated in May 1982 by the then Prime Minister, Mrs Indira Gandhi, inauguration took place at north end of the bridge located in Hajipur viewed by thousands of people.

Planning and Significance

Gandhi Setu Bridge in Patna, India

The bridge was approved by the Central Government in 1969 and built by Gammon India Limited over a period of ten years, from 1972 to 1982 with total expenditure of Rs 87.22 crore at that time. . It was built to connect North Bihar with the rest of Bihar and part of national highway 19 (NH19). . Before this bridge was constructed, Rajendra Setu, opened in 1959, was the only link to North Bihar. Since then, the Vikramshila Setu has also been built across the Ganges. Two more rail-cum-road bridges are currently under construction, between Digha and Sonepur[6] and at Munger.[7]

The Indian postal department issued a commemorative postage stamp on Landmark Bridges Of India: Mahatma Gandhi Setu of denomination 0500 Paise on 17 August 2007.[8]

Engineering Details

The bridge consists 45 intermediate spans of 121.065 metres (397.19 ft) each and a span of 65.530 metres (214.99 ft) at each end.[9] The deck provides for a 7.5 metres (25 ft) wide two lane roadway for IRC class 70 R loading with footpaths on either side.[10] The cantilever segmental construction method was adopted to construct this mega bridge. Each span has two cantilever beams on both sides which are free to move at the ends. It has two lanes one upstream and the other downstream each with a width of around 6m. Both the lanes are also free from each other and are not connected anywhere. It was constructed by using 3 meter pre-casted parts being joined at both ends to complete the span. The Spans are connected by using a Protrusion which is free to move longitudinally also along the river flow. In upwards and downwards direction it is such that it allows vibration to transfer smoothly to the next span while vehicular movement without much discreteness.

Traffic Congestion

In recent times, the bridge has been witnessing major traffic chaos and accidents due to exceeding number of vehicles passing over it and regularly over loading the structure. Bihar Government is planning to build two Pontoon bridges in parallel to it, in order to ease traffic.[11]

References

  1. Traffic eases on Gandhi Setu as Centre drops toll collection timesofindia.com
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Gammon India Limited Archived 12 February 2011 at WebCite
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. longest river bridge to be rebuilt business-standard.com
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Ganga Rail-Road Bridge
  8. Welcome to the Indiapost Web Site Archived 12 February 2011 at WebCite
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Gammon India Ltd. - Builders to the nation Archived 12 February 2011 at WebCite
  11. Lua error in package.lua at line 80: module 'strict' not found.

See also



<templatestyles src="Asbox/styles.css"></templatestyles>