Mubuku I Hydroelectric Power Station

From Infogalactic: the planetary knowledge core
(Redirected from Mubuku I Power Station)
Jump to: navigation, search
Mubuku I Power Station
Mubuku I Hydroelectric Power Station is located in Uganda
Mubuku I Hydroelectric Power Station
Map of Uganda showing the location of
Mubuku I Power Station
Country Uganda
Location Kitoko, Kasese District
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Operational
Owner(s) Kilembe Mines Limited
Dam and spillways
Impounds Mubuku River
Reservoir
Normal elevation 1,180 m (3,870 ft)
Power station
Commission date 1950s
Type Run-of-the-river
Turbines 2
Installed capacity 5 MW (6,700 hp)

Mubuku I Power Station is a 5 megawatts (6,700 hp) mini-hydroelectric power station in Uganda.

Location

The power station is located between Bugoye and Kitoko, straddling the Mubuku River in Kasese District in Western Uganda. The station is in the foothills of the Rwenzori Mountains, close to the border with the Democratic Republic of the Congo. Kitoko lies approximately 20 kilometres (12 mi), by road, north of Kasese, the location of the district headquarters and the nearest large city.[1]

History

Kilembe Mines Limited built the state in the 1950s to power the extraction of copper ore from the Rwenzori Mountains.[2] The copper extraction ceased in the 1970s, and the power generated is now sold to the national grid. The Mubuku I Power Station is the third mini-hydropower station on the Mubuku River. The other two are the Mubuku II Power Station, commonly known as the Bugoye Power Station and owned by Tronder Power Limited, a Norwegian company, and the Mubuku III Power Station, owned by Kasese Cobalt Company Limitd with an installed capacity of 10 megawatts (13,000 hp).

Overview

The station is a run-of-the-river mini-hydropower installation, with installed capacity of 5 megawatts. In September 2013, Ugandan print media indicated that the Tibet-Hima Consortium, the Chinese company that won the concession to run Kilembe Mines for the next twenty five years, has plans to increase capacity of the power plant to 12 megawatts.[3][4]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.

External links