Nuclear energy in the Netherlands

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Nuclear power plants in the Netherlands(view)
Location dot red.svg Active plants
Location dot purple.svg Closed plants

The Netherlands' only commercial nuclear reactor is Borssele, which became operational in 1973 and as of 2011 produces about 4% of the country’s electricity according to the world nuclear association.[1] IEA statistics, however, identify only about 1.3% of total primary energy supply (TPES).[2] The older Dodewaard nuclear power plant was a test reactor that was later attached to the national grid but was closed in 1997.

A 2MW research reactor is located in Delft, as part of the physics department of Delft University of Technology. This reactor is not meant for energy provision, but is used as a neutron- and positron-source for research.

History

Researchers in the Netherlands began studying nuclear energy in the 1930s and began the construction of research reactor at Dodewaard in 1955. The researchers’ goal was to introduce nuclear power technology by 1962 and replace fossil fuels. In 1968, a test nuclear reactor was attached to the power grid. This unit was shut down in 1997.

In the 1970s, the Dutch chose a policy that required reprocessing all spent nuclear fuel. In 1984, the government decided to create a long-term (100 years) storage facility for all intermediate and low-level radioactive waste and research strategies for ultimate disposal. In September 2003, the Central Organization for Radioactive Waste created an interim storage facility for high-level waste.

In 1994, the Netherlands' parliament voted to phase out nuclear power after a discussion of nuclear waste management. In 1997, the power station at Dodewaard was shut down and the government planned to end Borssele's operating license in 2003. In 2003, with a new government in power, the shutdown was postponed to 2013.[citation needed] In 2006 the government decided that Borssele would remain open until 2034, if it complied with the highest safety standards. The owners, Essent and Delta, will invest 500 million euro in sustainable energy, together with the government—money which the government claims otherwise should have been paid to the plants' owners as compensation.[citation needed] After the 2010 election, the new government was open to expanding nuclear power. Both of the companies that share ownership of Borssele are proposing to build new reactors.[3][4]

In January 2012, Delta announced the postponing of any decision to start building a second nuclear power plant.

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.

<templatestyles src="Asbox/styles.css"></templatestyles>