Orange Line (Washington Metro)

From Infogalactic: the planetary knowledge core
(Redirected from Orange Line (WMATA))
Jump to: navigation, search
WMATA Orange.svg Orange Line
West Falls Church-VT-UVA Station.jpg
Orange Line train at West Falls Church station
Overview
Type Rapid transit
System Washington Metro
Status Operating
Locale Fairfax County and Arlington, VA
Washington, D.C.
Prince George's County, MD
Termini Vienna (West)
New Carrollton (East)
Stations 26
Operation
Opened November 20, 1978; 45 years ago (November 20, 1978)
Operator(s) Washington Metropolitan Area Transit Authority
Character At-grade, elevated, and underground
Technical
Line length 26.4 mi (42.5 km)
No. of tracks 2
Track gauge 4 ft 8 14 in (1,429 mm)
Electrification Third rail
Route map
Vienna
Dunn Loring
I‑495 (Capital Beltway)
Falls Church Yard
West Falls Church
WMATA Silver.svg to Wiehle–Reston East
East Falls Church
Ballston–MU
Virginia Square–GMU
Clarendon
Court House
WMATA Blue.svg to Franconia–Springfield
Rosslyn
I‑66 (Custis Mem. Pkwy)
Potomac River
VA
DC
Foggy Bottom–GWU
Farragut West
WMATA Red.svg
McPherson Square
Metro CenterWMATA Red.svg
Federal Triangle
Smithsonian
Amtrak, VRE
L'Enfant PlazaWMATA Green.svg and WMATA Yellow.svg
L'Enfant Plaza (VRE)
Federal Center SW
I‑395 (3rd St Tunnel)
Amtrak First Street Tunnel
Capitol South
CSX Transportation RF&P
Eastern Market
Potomac Avenue
Stadium–Armory
Anacostia River
WMATA Blue.svg and WMATA Silver.svg to Largo Town Center
DC 295 (Anacostia Fwy)
Minnesota Avenue
Deanwood
DC
MD
CSX Transportation Landover Subdivision
CSX Transportation Alexandria Extension
Northeast Corridor
Cheverly
Landover
US 50
New Carrollton
New Carrollton Yard
Amtrak, MARC to Baltimore

The Orange Line of the Washington Metro consists of 26 rapid transit stations from Vienna to New Carrollton. It has stations in Fairfax County and Arlington, Virginia, the District of Columbia, and Prince George's County, Maryland. Half of the line's stations are shared with the Blue Line and over two thirds are shared with the Silver Line. Orange Line service began on November 20, 1978.

The Orange Line needs 30 trains (9 eight-car trains and 21 six-car trains, consisting of 198 rail cars) to run at peak capacity.[1]

History

Planning for Metro began with the Mass Transportation Survey in 1955, which attempted to forecast both freeway and mass transit systems sufficient to meet the needs of transportation in 1980.[2] In 1959, the study's final report included two rapid transit lines which anticipated subways in downtown Washington.[3] Because the plan called for extensive freeway construction within the District of Columbia, alarmed residents lobbied for federal legislation creating a moratorium on freeway construction through July 1, 1962.[4] The National Capital Transportation Agency's 1962 Transportation in the National Capital Region report anticipated much of the present Orange Line route in Virginia with the route following the median strip of I-66 both inside Arlington and beyond.[5] The route continued in rapid transit plans until the formation of the Washington Metropolitan Area Transit Authority (WMATA).

With the formation of WMATA in October 1966, planning of the system shifted from federal hands to a regional body with representatives of the District, Maryland and Virginia. Congressional route approval was no longer a key consideration.[6] Instead, routes had to serve each local suburban jurisdiction to assure that they would approve bond referenda to finance the system.[7] Because the least expensive way to build into the suburbs was to rely upon existing railroad right-of-ways, the Orange Line took much of its present form, except that it also featured a further extension along the railroad to Bowie, Maryland and along the Dulles Access Road to the Dulles Airport.[8] By 1966, WMATA and Arlington County planners had agreed "to realign the rapid transit through high-density commercial-office-apartment areas in the vicinity of Wilson Boulevard instead of the freeway's median between the river and Glebe Road."[9]

On March 1, 1968, WMATA approved its Adopted Regional System (ARS) plan that included suburban mass transit lines that followed the median of the proposed Interstate 66 through Virginia to Vienna and the CSX/Amtrak railroad right-of-way in Prince George's County, Maryland.[10] The construction of the downtown Washington sections of the Orange and Blue lines began simultaneously with the Red line. A joint ground-breaking ceremony was held on December 9, 1969.[10] Service on the joint downtown track was at first branded as just the Blue Line and commenced on July 1, 1977.[10]

In 1976, Robert Patricelli, federal Urban Mass Transportation Administrator, ordered Metro to conduct an alternatives analysis of the portion of its system that was not already under contract.[11] Because the Tysons Corner area of Fairfax County had developed significantly since the ARS was adopted in 1968, the analysis considered rerouting the Orange line to serve Tysons Corner at an additional cost of $60 million. However, because environmental impact statements had already been completed for the Vienna route, a change in the route would result in a five-year delay in the construction of the Orange Line west of Ballston. This prompted the City of Falls Church to sue WMATA for breach of contract. In the end, WMATA kept the Vienna route intact, leaving Tysons Corner without Metrorail service until 2014.[12][13]

Service on the Orange Line began on November 20, 1978 between National Airport and New Carrollton, with five new stations being added to the existing network from Stadium–Armory. When the line from Rosslyn to Ballston–MU was completed on December 11, 1979, Orange Line trains began following this route rather than going to the National Airport station. The line was completed on June 7, 1986, when it was extended by four stations to Vienna in the I-66 median.[10]

On January 13, 1982, an Orange Line train derailed as it was being backed up from an improperly closed rail switch between the Federal Triangle and Smithsonian stations, resulting in the deaths of three passengers.[14] It was the first incident within the Metro system that caused a fatality,[14] and the deadliest incident occurring in the system until the 2009 collision that resulted in nine fatalities.[15]

Between 2011 and 2013, service was interrupted at stations west of Ballston on designated weekends to accommodate the construction of the interconnection of the Silver Line with the existing Orange Line tracks.[16][17][18] As a part of this project, the train yard adjacent to the West Falls Church station on the Orange Line was expanded.[19][20]

On July 26, 2014, Orange Line stations between East Falls Church and Stadium-Armory began to serve Silver Line trains.

Route

As originally planned, Silver Line trains would have reversed course using the D98 pocket track east of the Stadium Armory stop. Safety concerns raised in December 2012 necessitate the trains to continue to Largo Town Center.

Starting at its western termini at the Vienna/Fairfax-GMU station in Virginia, the tracks run on the median strip of Interstate 66 until they enter a tunnel under Fairfax Drive just before the Ballston-MU station.[21] Although originally proposed to follow I-66 through Arlington, city planners successfully argued that the line be relocated to Fairfax Drive, which has since stimulated high rise development along the line's route. At the Clarendon station, the tunnel shifts to Wilson Blvd. and 16th Street North.[21] The tunnel then turns north and merges with the Blue Line just before entering the Rosslyn station which is located under North Lynn Street.[21] The tunnel continues under the Potomac River and bends to the east to travel under I Street NW in the District of Columbia.[21]

The tunnel continues east under I Street and between Farragut West and McPherson Square stations there is a non-revenue branch track that connects with the Red Line. The tunnel then turns south under 12th Street Northwest and enters the lower level of the Metro Center station.[21] After Smithsonian station, the tunnel turns east under D Street Southwest and then southeast under Pennsylvania Avenue Southeast.[21] At Potomac Avenue station, the tunnel briefly travels under G Street Southeast and then turns northwest under Potomac Avenue with a turn to the north to travel under 19th Street Southeast for the Stadium-Armory station.[21] The tunnel then travels under the RFK Stadium parking lots to surface near Benning Road.[21] The elevated tracks follow Benning Road across the Anacostia River and then split from the Blue and Silver lines. There is a pocket track just west of this split.

The above ground tracks continue along DC Route 295 between Minnesota Avenue and Deanwood stations and then follow the CSX/Amtrak railroad in Prince George's County, Maryland to the eastern terminus at New Carrolton.[21] The route includes a train yard adjacent to the West Falls Church station.[19] Orange Line service travels along the entirety of the K Route (from the terminus at Vienna/Fairfax-GMU to the C & K junction just south of Rosslyn), part of the C Route (from the C & K junction just south of Rosslyn to Metro Center), and the entire D Route (from Metro Center to New Carrollton).[22]

Stations

The following stations are along the line, from west to east:

Station Code Opened Terrain Other Metro
Lines
Notes
Vienna K08 1986 surface; median of I-66 Western terminus
Dunn Loring K07 1986 surface; median of I-66
West Falls Church K06 1986 surface; median of I-66
East Falls Church K05 1986 surface; median of I-66 Silver Line Silver Line Transfer station for the Silver Line (western)
Ballston–MU K04 1979 underground Silver Line Silver Line
Virginia Square–GMU K03 1979 underground Silver Line Silver Line
Clarendon K02 1979 underground Silver Line Silver Line
Court House K01 1979 underground Silver Line Silver Line
Rosslyn C05 1977 underground Blue Line Blue Line Silver Line Silver Line Transfer station for the Blue Line (western).
Foggy Bottom–GWU C04 1977 underground Blue Line Blue Line Silver Line Silver Line
Farragut West C03 1977 underground Blue Line Blue Line Silver Line Silver Line
McPherson Square C02 1977 underground Blue Line Blue Line Silver Line Silver Line
Metro Center C01 1977 underground Blue Line Blue Line Silver Line Silver Line Red Line Red Line transfer station for Red Line
Federal Triangle D01 1977 underground Blue Line Blue Line Silver Line Silver Line
Smithsonian D02 1977 underground Blue Line Blue Line Silver Line Silver Line
L'Enfant Plaza D03 1977 underground Blue Line Blue Line Silver Line Silver Line Yellow Line Yellow Line Green Line Green Line transfer station for the Yellow and Green Lines
Federal Center SW D04 1977 underground Blue Line Blue Line Silver Line Silver Line
Capitol South D05 1977 underground Blue Line Blue Line Silver Line Silver Line
Eastern Market D06 1977 underground Blue Line Blue Line Silver Line Silver Line
Potomac Avenue D07 1977 underground Blue Line Blue Line Silver Line Silver Line
Stadium–Armory D08 1977 underground Blue Line Blue Line Silver Line Silver Line Transfer station for the Blue and Silver lines (east)
Minnesota Avenue D09 1978 surface
Deanwood D10 1978 surface
Cheverly D11 1978 surface
Landover D12 1978 surface
New Carrollton D13 1978 surface Eastern terminus
Unused bridge pier east of West Falls Church station, now used for a bridge connecting the Silver Line to the Orange Line.

Future

The Virginia Department of Transportation (VDOT) announced on January 18, 2008 that it and the Virginia Department of Rail and Public Transportation (VDPRT) had begun work on a draft environmental impact statement (EIS) for the I-66 corridor in Fairfax and Prince William counties. According to VDOT the EIS, officially named the I-66 Multimodal Transportation and Environment Study, would focus on improving mobility along I-66 from the Capital Beltway (I-495) interchange in Fairfax County to the interchange with U.S. Route 15 in Prince William County. The EIS also allegedly includes a four station extension of the Orange Line past Vienna. The extension would continue to run in the I-66 median and would have stations at Chain Bridge Road, Fair Oaks, Stringfellow Road and Centreville near Virginia Route 28 and U.S. Route 29.[23][24] Also, plans to extend Orange Line to Bowie have been proposed. In its final report published June 8, 2012, the study and analysis revealed that an "extension would have a minimal impact on Metrorail ridership and volumes on study area roadways inside the Beltway and would therefore not relieve congestion in the study corridor." [25]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Schrag at p. 33–38.
  3. Schrag at p. 39.
  4. Schrag at p. 42.
  5. Schrag at p. 55.
  6. Schrag at p. 104
  7. Schrag at p. 108
  8. Schrag at p. 110.
  9. Northern Virginia Transportation Commission, Potential Rail Transit Corridors at p. 1, quoted in Schrag at p. 224.
  10. 10.0 10.1 10.2 10.3 Lua error in package.lua at line 80: module 'strict' not found.
  11. Schrag at p. 187.
  12. Schrag at p. 238–39
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. 14.0 14.1 Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. 19.0 19.1 Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. 21.0 21.1 21.2 21.3 21.4 21.5 21.6 21.7 21.8 Lua error in package.lua at line 80: module 'strict' not found.
  22. Schrag at p. 188.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. [1]
  25. http://virginiadot.org/projects/resources/NorthernVirginia/I-66_Multimodal_-_Final_Report.pdf

Further reading

  • Lua error in package.lua at line 80: module 'strict' not found.

External links