Pensford Viaduct

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Pensford Viaduct
File:Pensford Viaduct - geograph.org.uk - 717285.jpg
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Carries Bristol and North Somerset Railway
Crosses River Chew
Locale Pensford, Somerset, England
Owner BRB (Residuary) Ltd
Heritage status Grade II listed building
BRB (Residuary) Ltd FNS3/17m 4ch[1]
Characteristics
Material Stone and brick
Total length 995 feet (303 m)
Height 95 feet (29 m)
Number of spans 16
History
Construction begin 1874
Closed 1968

Pensford Viaduct is a disused railway bridge in the village of Pensford within the English county of Somerset. It is a Grade II listed building.[2]

History

The viaduct was built in 1874 to carry the Bristol and North Somerset Railway over the valley of the River Chew. The contractor was J. Perry, of Tredegar Works, Bow.[3] During construction the bridge failed and had to be rebuilt.[4]

The last scheduled passenger train to cross the viaduct was the 9:25 a.m. from Frome to Bristol on 31 October 1959; after that there were only goods trains (mainly bringing coal from Radstock), which ceased in 1964, and very occasional excursion trains. It officially closed after the Great Flood of 1968 which damaged the viaduct and other buildings in Pensford and the wider Chew Valley.[5]

The viaduct was offered for sale for £1,[6] in 1984;[5] however, the likely maintenance costs were prohibitive and no one bought it.[7][8] It became the property of BRB (Residuary) Ltd which took over some of the assets of the British Railways Board when it was privatised.[1] In September 2013, BRB (Residuary) Ltd was abolished, with assets being transferred to the Highways Agency Historical Railways Estate.[9]

In 2014 a new microbrewery in Pensford known as the Chew Valley Brewery used a depiction of the viaduct as its logo.[10][11]

Architecture

Construction is of stone piers and spandrels with red brick soffits. The viaduct is 995 feet (303 m) long, reaches a maximum height of 95 feet (29 m) to rail level and consists of sixteen arches. The arches are of different widths and heights and supported by tall, tapering piers in the centre and thicker shorter ones towards the sides. Arches 5 and 13 are lower than the others dividing the bridge into sections with four higher arches at each end.[5]

Subsequent repairs were made with concrete rather than stone, though it was dressed to look similar to the surrounding stone.[5]

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 5.3 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.

External links