Royal Commonwealth Pool

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Royal Commonwealth Pool
File:Royal Commonwealth Pool, Edinburgh.JPG
Royal Commonwealth Pool West side
Royal Commonwealth Pool is located in Scotland
Royal Commonwealth Pool
The pool's situation within Scotland
Alternative names Commonwealth Pool, the RCP, or the Commie[1]
General information
Architectural style Modernism
Location Edinburgh, Scotland
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Completed 1970
Cost $3.84 million
Client Corporation of the City of Edinburgh Architects[2]
Design and construction
Architect John Richards of RMJM
Other information
Seating capacity 2,000[3]

The Royal Commonwealth Pool is a category-A-listed building[4] in Edinburgh that houses one of Scotland's main swimming pools. It is usually referred to simply as the Commonwealth Pool and known colloquially as the 'Commie'.

History

The pool was commissioned by the Council under a plan by the then Lord Provost, Sir Herbert Archbold Brechin in 1966 as part of a wider project to bring the Commonwealth Games to Edinburgh. This, with the help of other committee members such as Sir John Inch came to fruition in 1970.

Construction began in 1967 and was completed in 1970. The architecture was by Robert Matthew Johnson Marshall with structural input from Ove Arup & Partners.[5]

The pool was closed 2009 to 2012 for major internal remodelling.

Architectural award nominations

In 1993 it was selected by the international conservation organisation DoCoMoMo as one of sixty key Scottish monuments of the post-war period.[6]

File:20131207 Warrender Gala.JPG
Swimming gala at the Royal Commonwealth Pool in 2013

It was also nominated in 2002 by the Architecture Heritage Society of Scotland as one of the most significant modern contributions to Scottish heritage. These sentiments were echoed in Prospect 100 best modern Scottish buildings, published in 2005.[7]

S&P Architects were the architects and lead consultants for the 2012 refurbishment and were awarded the Scottish Design Award in 2012 for the best reuse of a listed building.

Refurbishment

In June 2009, the pool was closed to the public to begin refurbishment.[8] The project,led by Frank and Charlie of S&P Architects began in August 2009, costing approximately £37 million, and included new 25 metres (82 ft) diving and teaching pools as well as improvements to the changing rooms, café, reception, and the dive gym.[9] It was originally expected to be finished by mid-2011[10] but did not reopen until March 2012.[11][12]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Buildings of Scotland: Edinburgh, Gifford McWilliam and Walker
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found. (registration required)
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. (20 March 2012) Commonwealth Pool in Edinburgh officially reopens BBC News, Retrieved 28 February 2013

External links