Sardar Sarovar Dam
Sardar Sarovar Dam partially completed.JPG
The Sardar Sarovar Dam,
partially completed in August 2008
Sardar Sarovar Dam is located in Gujarat
Sardar Sarovar Dam
Location of Sardar Sarovar Dam in India Gujarat
Country India
Location Navagam, Gujarat
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Operational
Owner(s) Narmada Control Authority
Dam and spillways
Type of dam gravity dam, concrete
Impounds Narmada River
Height (foundation) 163 m (535 ft)
Length 1,210 m (3,970 ft)
Spillway capacity 84,949 m3/s (2,999,900 cu ft/s)
Reservoir
Total capacity 9,500,000,000 m3 (7,701,775 acre·ft)
Active capacity 5,800,000,000 m3 (4,702,137 acre·ft)
Catchment area 88,000 km2 (34,000 sq mi)
Surface area 375.33 km2 (144.92 sq mi)
Max. length 214 km (133 mi)
Max. width 1.77 km (1.10 mi)
Normal elevation 138 m (453 ft)
Power station
Operator(s) Sardar Sarovar Narmada Nigam Limited
Commission date June 2006
Turbines Dam: 6 x 200 MW Francis pump-turbine
Canal: 5 x 50 MW Kaplan-type[1]
Installed capacity 1,450 MW
Website
www.sardarsarovardam.org

The Sardar Sarovar Dam is a gravity dam on the Narmada river near Navagam, Gujarat in India. It is the largest dam and part of the Narmada Valley Project, a large hydraulic engineering project involving the construction of a series of large irrigation and hydroelectric multi-purpose dams on the Narmada river. The project took form in 1979 as part of a development scheme to increase irrigation and produce hydroelectricity.

One of the 30 dams planned on river Narmada, Sardar Sarovar Dam (SSD) is the largest structure to be built. Following a number of controversial cases before the Supreme Court of India (1999, 2000, 2003), by 2014 the Narmada Control Authority had approved a series of changes in the final height – and the associated displacement caused by the increased reservoir, from the original 80 m (260 ft) to a final 163 m (535 ft) from foundation.[2][3] The project will irrigate more than 18,000 km2 (6,900 sq mi), most of it in drought prone areas of Kutch and Saurashtra.

The dam's main power plant houses six 200 MW Francis pump-turbines to generate electricity and include a pumped-storage capability. Additionally, a power plant on the intake for the main canal contains five 50 MW Kaplan turbine-generators. The total installed capacity of the power facilities is 1,450 MW. Its final configuration is the second largest concrete gravity dam (by volume) after Grand Coulee Dam in the US and has the world's third largest spillway discharging capacity.[4]

Narmada Canal

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The dam will irrigate 17,920 km2 (6,920 sq mi) of land spread over 12 districts, 62 talukas, and 3,393 villages (75% of which is drought-prone areas) in Gujarat and 730 km2 (280 sq mi) in the arid areas of Barmer and Jalore districts of Rajasthan. The dam will also provide flood protection to riverine reaches measuring 30,000 ha (74,000 acres) covering 210 villages and Bharuch city and a population of 400,000 in Gujarat.[5]

Solar power generation

In 2011, the government of Gujarat announced plans to generate solar power by placing solar panels over the canal, making it beneficial for the surrounding villages to get power and also help to reduce the evaporation of water. The first phase consists of placing panels along a 25 km length of canal, with capacity for up to 25 MW of power.[6]

Projected benefits

The benefits of the dam as listed in the Judgement of the Supreme Court of India in 2000 were:

"The argument in favour of the Sardar Sarovar Project is that the benefits are so large that they substantially outweigh the costs of the immediate human and environmental disruption. Without the dam, the long term costs for people would be much greater and lack of an income source for future generations would put increasing pressure on the environment. If the water of the Narmada river continues to flow to the sea unused, there appears to be no alternative to escalating human deprivation, particularly in the dry areas of Gujarat.

The project has the potential to feed as many as 20 million people, provide domestic and industrial water for about 30 million, employ about 1 million, and provide valuable peak electric power in an area with high unmet power demand (farm pumps often get only a few hours of power per day).It will also provide flood protection to riverine reaches measuring 30,000 ha. covering 210 villages and Bharuch city and a population of 4.0 lac in Gujarat. In addition, recent research shows substantial economic multiplier effects (investment and employment triggered by development) from irrigation development. Set against the future of about 70,000 project affected people, even without the multiplier effect, the ratio of beneficiaries to affected persons is well over 100:1."[7]

Controversy

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The dam is one of India's most controversial and its environmental impact and net costs and benefits are widely debated.[citation needed] The World Bank was initially funding SSD, but withdrew in 1994. The Narmada Dam has been the centre of controversy and protest since the late 1980s.[8]

One such protest takes centre stage in the Spanner Films documentary Drowned Out (2002), which follows one tribal family who decide to stay at home and drown rather than make way for the Narmada Dam.[9] An earlier documentary film is called A Narmada Diary (1995) by Anand Patwardhan and Simantini Dhuru. The efforts of NBA to seek "social and environmental justice" for those most directly affected by the Sardar Sarover Dam construction feature prominently in this film. It received the (Filmfare Award for Best Documentary-1996).[10]

The figurehead of much of the protest is Medha Patkar, the leader of the Narmada Bachao Andolan ("Save Narmada Movement").[11] The movement was cemented in 1989, and received the Right Livelihood Award in 1991.[12]

Support for the protests also came from Indian author Arundhati Roy, who wrote "The Greater Common Good", an essay reprinted in her book The Cost of Living, in protest of the Narmada Dam Project.[13] In the essay, Roy states:<templatestyles src="Template:Blockquote/styles.css" />

Big Dams are to a Nation's 'Development' what Nuclear Bombs are to its Military Arsenal. They are both weapons of mass destruction. They're both weapons Governments use to control their own people. Both Twentieth Century emblems that mark a point in time when human intelligence has outstripped its own instinct for survival. They're both malignant indications of civilisation turning upon itself. They represent the severing of the link, not just the link—the understanding—between human beings and the planet they live on. They scramble the intelligence that connects eggs to hens, milk to cows, food to forests, water to rivers, air to life and the earth to human existence.

Height increases

The Sardar Sarovar Dam,
undergoing height increase in 2006.
  • In February 1999, the Supreme Court of India gave the go ahead for the dam's height to be raised to 88 m (289 ft) from the initial 80 m (260 ft).
  • In October 2000 again, in a 2-to-1 majority judgment in the Supreme Court, the government was allowed to construct the dam up to 90 m (300 ft).[2]
  • In May 2002, the Narmada Control Authority approved increasing the height of the dam to 95 m (312 ft).
  • In March 2004, the Authority allowed a 15 m (49 ft) height increase to 110 m (360 ft).
  • In March 2006, the Narmada Control Authority gave clearance for the height of the dam to increased from 110.64 m (363.0 ft) to 121.92 m (400.0 ft). This came after 2003 when the Supreme Court of India refused allow the height of the dam to increase again.
  • In August 2013, heavy rains raised the reservoir level to 131.5 m (431 ft), which forced 7,000 villagers upstream along the Narmada River to relocate.[14]
  • On June 2014, Narmada Control Authority gave the final clearance to raise the height from 121.92 m (400.0 ft) metres to 138.68 m (455.0 ft)[15]

Report of the Ministry of Environment and Forests (MoEF)

The Second Interim Report of the Experts' Committee set up by the Ministry of Environment and Forests (MoEF) of the Government of India to assess the planning and implementation of environmental safeguards with respect to the Sardar Sarovar (SSP) and Indira Sagar projects (ISP) on the Narmada River. The report covers the status of compliances on catchment area treatment (CAT), flora and fauna and carrying capacity upstream, command area development (CAD), compensatory afforestation and human health aspects in project impact areas. Construction, on the other hand, has been proceeding apace: the ISP is complete and the SSP nearing completion. The report recommends that no further reservoir-filling be done at either SSP or ISP; that no further work be done on canal construction; and that even irrigation from the existing network be stopped forthwith until failures of compliance on the various environmental parameters have been fully remedied.[16]

The Supreme Court decision

Despite popular protest, the Supreme Court gave clearance for the height to be increased to 121.92 m (400 ft), but in the same judgment Justice Mr. Bharucha gave directions to Madhya Pradesh and Maharashtra (the Grievance Redressal Authorities of Gujarat) that before further construction begins, they should certify (after inspection) that all those displaced by the raise in height of 5 metres have already been satisfactorily rehabilitated, and also that suitable vacant land for rehabilitating them is already in the possession of the respective States. This process shall be repeated for every successive five metre increase in height.

Notes

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Scudder T. (2003) (SSP), Unpublished Manuscript, retrieved 7/9/2007 India’s Sardar Sarovar Project
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Friends of River Narmada, retrieved 9 July 2007 The Sardar Sarovar Dam: a Brief Introduction
  12. In an opinion piece in The Guardian, the campaign led by the NBA activists was accused of holding up the project's completion and of even physically attacking local people who accepted compensation for moving.Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.

References

  • Sardar Saroval Narmada Nigam. (01/2002) retrieved 7/9/2007 Narmada for People and Environment
  • Dam-Affected Resettlement in Gujarat, by Chhandasi Pandya, retrieved July 13, 2007 Article
  • SECOND INTERIM REPORT OF THE COMMITTEE FOR ASSESSMENT OF SURVEY/ STUDIES / PLANNING AND IMPLEMENTATION, OF THE PLANS ON ENVIRONMENTAL SAFE GUARD MEASURES FOR SARDAR SAROVAR & INDIRA SAGAR PROJECTS Report