Satish Dhawan Space Centre First Launch Pad

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
First Launch Pad
Launch site Satish Dhawan Space Centre
Location Lua error in package.lua at line 80: module 'strict' not found.
Short name FLP
Operator India ISRO
Launch pad(s) One
Launch history
Status Active
Launches 24
First launch 20 September 1993
PSLV / IRS-P1
Last launch 15 October 2014
PSLV-XL / IRNSS-1C
Associated
rockets
PSLV
GSLV

The First Launch Pad[1] of the Satish Dhawan Space Centre is a rocket launch site in Sriharikota, India that began operation in 1993. It is currently used by two launch vehicles of the ISRO: the Polar Satellite Launch Vehicle (PSLV) and the Geosynchronous Satellite Launch Vehicle (GSLV). It is one of two operational orbital launch pads at the site, the other being the Second Launch Pad,[2] which opened in 2005. The first launch from this pad occurred on 20 September 1993, and was the maiden flight of the Polar Satellite Launch Vehicle carrying the IRS-1E satellite.

Launches

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

As of November 2013, 19 PSLVs (1 Failure, 1 Partial Success & 17 Fully Successful)[3] and 3 GSLVs (1 Failure & 2 Fully Successful) have been launched from here. The latest one was the successful launch of PSLV-C23 on 30 June 2014 carrying payload from 5 different countries. The launch was attended by the current Prime Minister of India, Mr. Narendra Modi.

Facilities

PM Modi visits Satish Dhawan Space Centre First Launch Pad in June 2014; Launch Vehicle seen in the backdrop.

"The individual stages of PSLV or GSLV, their subsystems and the spacecraft are prepared and checked out in separate facilities before they are sent to launch pad for integration A-76-meter tall mobile service tower (MST) facilitates the vertical integration of the vehicle. The foldable working platforms of MST provide access to the vehicle at various elevations. A massive launch pedestal, made up of steel plates, acts as the base on which the vehicle is integrated."[4]

"The spacecraft is integrated to the vehicle in a clean room, set up inside the MST. However, in the case of GSLV, the spacecraft is interfaced with the payload adopter and then encapsulated in the heat shield in the preparation facility itself. The encapsulated assembly is moved to the launch pad for integrating with the 3rd stage of GSLV. The umbilical tower houses the feed lines for liquid propellants and high-pressure gases, checkout cables, and chilled air duct for supplying cool air to the satellite and equipment bay."[4]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. See the Wikipedian page List of Satish Dhawan Space Centre launches
  4. 4.0 4.1 Public domain text sourced from the link - ISRO Launch Facilities