USS George H.W. Bush

From Infogalactic: the planetary knowledge core
(Redirected from USS George Bush (CVN-77))
Jump to: navigation, search
USS George H.W. Bush (CVN-77)
US Navy 110129-N-3885H-158 USS George H.W. Bush (CVN 77) is underway in the Atlantic Ocean.jpg
USS George H.W. Bush in January 2011
History
United States of America
Name: USS George H.W. Bush
Namesake: George H. W. Bush
Ordered: 26 January 2001
Awarded: 26 January 2001
Builder: Northrop Grumman Newport News[1]
Cost: $6.2 billion[2]
Laid down: 6 September 2003[1]
Sponsored by: Dorothy Bush Koch[1]
Christened: 7 October 2006
Launched: 9 October 2006
Commissioned: 10 January 2009[2]
Homeport: NS Norfolk, Norfolk, Virginia
Motto: Freedom at Work
Nickname(s): Avenger
Status: In active service, as of 2015
Badge: CVN-77 insignia.svg
General characteristics
Class & type:
Displacement: 102,000 long tons (114,000 short tons)[3]
Length:
  • Overall: 1,092 feet (332.8 m)
  • Waterline: 1,040 feet (317.0 m)
Beam:
  • Overall: 252 ft (76.8 m)
  • Waterline: 134 ft (40.8 m)
Draft:
  • Maximum navigational: 37 feet (11.3 m)
  • Limit: 41 feet (12.5 m)
Propulsion:
Speed: 30+ knots (56+ km/h; 35+ mph)
Range: Unlimited distance; 20–25 years
Complement:
  • Ship's company: 3,200
  • Air wing: 2,480
Sensors and
processing systems:
  • SPS-48E 3-D air search radar
  • SPS-49A(V)1 2-D air search radar
  • SPQ-9B fire control radar
  • 2 × SPN-46 air traffic control radars
  • SPN-43C air traffic control radar
  • SPN-41 instrument landing system radar
  • 3 × Mk 91 NSSM guidance systems
  • 3 × Mk 95 radars
Electronic warfare
& decoys:
  • SLQ-32A(V)4 Countermeasures suite
  • SLQ-25A Nixie torpedo countermeasures
Armament:
Armor: 2.5 in (64 mm) Kevlar over vital spaces[5]
Aircraft carried: 90 fixed wing and helicopters

USS George H.W. Bush (CVN-77) is the tenth and final Nimitz-class supercarrier of the United States Navy.[1] She is named for the 41st President of the United States and former Director of Central Intelligence George H. W. Bush, who was a naval aviator during World War II. Bush's callsign is Avenger, after the TBM Avenger aircraft flown by then-Lieutenant George Bush in World War II. Construction began in 2003[6] at the Northrop Grumman Newport News shipyard's Dry Dock 12, the largest in the western hemisphere.[7] She was completed in 2009 at a cost of $6.2 billion[2] and her home port is Naval Station Norfolk, Virginia.

Etymology

George H. W. Bush became the U.S. Navy's youngest pilot when he received his Naval Aviator wings and naval commission on 9 June 1943, three days before turning 19.[8] He flew torpedo bombers off USS San Jacinto on active duty from August 1943 to September 1945 during World War II. On 2 September 1944, during a mission over the Pacific, Japanese anti-aircraft fire hit his plane. The Navy submarine USS Finback rescued him. He was awarded the Distinguished Flying Cross and three Air Medals for courageous service in the Pacific Theater.

USS George H.W. Bush is the second United States aircraft carrier to be named after a naval aviator (Forrestal was the first) and the second, following Ronald Reagan, to be named after a living former president (Reagan was christened in 2001 while President Reagan was still alive).

Ship's seal

Each element of the seal is significant for its relevance to the ship’s namesake, naval aviation, naval service, and the nation. There are six prominent features of the seal, beginning with the 41 white stars, symbolizing the ship’s namesake (the 41st President). The rays of light that appear on the seal’s horizon represent Bush’s concept of a "thousand points of light", wherein he urged Americans to find meaning and reward by serving a purpose higher than themselves. The graphic depiction of the aircraft carrier reflects the carrier as both a symbol and instrument of American strength as a force for freedom. Above the carrier are the overhead profiles of a TBM Avenger torpedo bomber (representing Bush’s days as a Navy pilot), an F/A-18 Hornet strike fighter, and an F-35C Lightning II, superimposed one upon the other in order of the individual aircraft's outline size.[9]

Fouled anchors and shields, centered on naval aviators wings, honor the ship’s namesake’s aviation history. Finally, the motto "Freedom at Work" is adapted from Bush’s inaugural speech, during which he said, "We know what works: Freedom works. We know what’s right: Freedom is right."[9]

Description

Section ref: Global[10]

Bush stretches 1,092 feet and displaces over 100,000 tons, making her one of the world’s largest warships (though she is slightly shorter than USS Enterprise). Her top speed exceeds 30 knots; powered with two nuclear reactors, she can operate for more than 20 years without refueling.

Several features differentiate CVN-77 from other ships in the Nimitz class.[11]

Hull

New features include a bulbous bow design that provides more buoyancy to the forward end of the ship and improves hull efficiency, curved flight deck edges to reduce radar signature, a new underwater hull-coating system, deck covering modernized to reduce ship weight by 100 tons, low Solar Absorptive and Anti-Stain Paint, a less cluttered hangar bay, and a new propeller design.[12]

Island

Placing the 700-ton island onto the ship’s flight deck in 2006

Bush is the second carrier to have a modernized island, which includes a new radar tower (enclosed to reduce radar signature), navigation system upgrades, communication systems enhancements, and transparent armor windows. The island is smaller and has been repositioned farther aft to improve flight deck access and reduce signature and electronic self-interference.

Air operations

New air operations design features include an updated aviation-fuel storage and distribution system, semi-automated refueling and servicing with new deck locations to provide faster, more efficient aircraft pit stops, requiring fewer people, modernized aircraft launch and recovery equipment, and redesigned jet blast deflectors.

Environmental

Environmental upgrades have also been designed into the ship, including a vacuum collection/marine sanitation device (VC/MSD), a new marine sewage system that uses fresh water in lieu of sea water for lower maintenance costs. Many older ships in the U.S. Navy utilize a gravity-driven collection holding and transfer (CHT) system to handle sewage waste. Newer U.S. Navy ships, including now CVN-77, collect sewage waste by vacuum, allowing for greater flexibility in piping installation, smaller pipe sizes overall and reducing water consumption. The collection tanks of Bush were modified to accommodate both the VCHT (Vacuum CHT) equipment and the elements of a marine sanitization device to treat the waste prior to discharge. Bush is the first and only aircraft carrier in the U.S. Navy to combine the two technologies.

This new VC/MSD driven waste management system has, however, not been without problems. Reports began surfacing immediately after delivery in May 2009 of issues with the ship's toilet system. As of November, 2011, the entire system has gone down at least twice, rendering all 423 commodes in the ship's 130 heads inoperable, with many more incidents that have rendered either half of the ship, or sections of the ship, without operating sanitary facilities. In one ship-wide incident, a repair crew spent 35 non-stop hours attempting to return the system to working order. The system is said to suffer breakdowns when inappropriate materials such as feminine hygiene products are flushed down the toilets.[13] During a four-month maintenance period in dock in 2012, anti-clog measures were installed in the ship's toilet disposal systems.[14]

Electronics and communications

New electronics and communications technology, space rearrangement, operational procedure changes, advanced sensor technologies and maintenance systems have been incorporated to reduce manning costs. A new zonal electrical distribution system will keep problems from affecting other parts of the ship. Automated material movement devices, semi-autonomous, gravity compensated weapons handling devices, damage control automation systems and components have also been installed. Medical and dental equipment have been upgraded, integrated display screens in Damage Control Central have been modernized to improve data integration and display, and equipment in general shops has been modernized to improve productivity.

History

Pentagon naming ceremony in December 2002.

The contract to build CVN-77 was awarded to Northrop Grumman Shipbuilding Newport News on 26 January 2001. A naming ceremony was held on 9 December 2002 at Northrop Grumman Newport News, with Former President George H.W. Bush attending.[6][15] The Honorable Gordon R. England, Secretary of the Navy, presided at a ceremony.

Construction

The Keel Laying ceremony was on 6 September 2003,[6] with Former President George H. W. Bush serving as the keynote speaker. Former First Lady Barbara Bush also attended with their daughter, Dorothy Bush Koch, the ship's sponsor. The former President authenticated the keel by chalking his initials onto a metal plate. His initials were then welded onto the plate, which was permanently affixed to the ship.

USS George H. W. Bush shortly after being released from dry dock for the first time

The ship was modularly constructed, where large sections are assembled and then lifted into place using a large crane. Major milestones in the construction include the bow placement in March 2005, followed by the island placement on 8 July 2006.[6] The 700-ton island was lifted onto the flight deck in a ceremony called "stepping the mast," which dates from antiquity and consists of placing coins or other items of significance under the step or bottom of a ship’s mast during construction. Since at least the construction of USS Constitution in the 1790s, this tradition has been passed on as a symbol of good luck for U.S. Navy ships. George H. W. Bush participated in the event, placing his naval aviator wings underneath the island during the ceremony.[citation needed]

George H.W. Bush was christened on 7 October 2006.[1] Former President George H. W. Bush attended the ceremony and became the first president in history to participate in the christening of his namesake ship. President George W. Bush also attended and honored his father during the ceremony as a special guest speaker. Other officials participating in the ceremony included Secretary of Defense Donald Rumsfeld, Secretary of the Navy Donald Winter; Virginia Senators John Warner and George Allen, Virginia Gov. Tim Kaine, and Chief of Naval Operations Admiral Michael Mullen.[citation needed]

Other construction milestones included catapult system testing on the ship's flight deck on 25 January 2008. Former President George H. W. Bush signaled the launch of two "dead loads" off the deck of the carrier. Dead loads are large, wheeled, steel vessels weighing up to 80,000 pounds, simulating the weight of actual aircraft.[16]

On 11 August 2008, the Pre-Commissioning Unit (PCU) crew moved aboard the ship, the first meals were served in the galley, the U.S. flag was raised on the fantail for the first time, and the first watches were set.[17]

Bush left Northrop Grumman Ship Building for the first time on 23 December 2008, proceeding a few miles down river to Norfolk Naval Station.

Part of the ship's steel was manufactured from re-forged steel made from the support columns hauled out of the Twin Towers wreckage.

Commissioning

Guests and U.S. Navy personnel at the commissioning ceremony on 10 January 2009
George H. W. Bush and Barbara Bush depart the ship following the commissioning ceremony

USS George H.W. Bush was commissioned 10 January 2009 at Norfolk Naval Station[18] prior to her official delivery to the Navy. 15,000 people were in attendance including veterans of the USS San Jacinto, the ship George Bush served on during World War II. President George W. Bush delivered the principal address, George H.W. Bush set the first watch, and ship's sponsor Dorothy "Doro" Bush Koch gave the order to "man our ship and bring her to life!" A GM-built Grumman TBM Avenger like the one then-Lieutenant junior grade George Bush flew in World War II performed a fly-over. Northrop Grumman Corporation Builder's sea trials were completed on 16 February 2009, providing an opportunity to test systems, components and compartments at sea for the first time. The trials included high-speed runs and a demonstration of the carrier's other capabilities.[19] Following builder's trials, the ship underwent acceptance trials on 10 April 2009,[20] conducted by representatives of the U.S. Navy Board of Inspection and Survey, to test and evaluate the ship's systems and performance.

Delivery and shakedown

Bush was officially delivered to the Navy on 11 May 2009.[21]

The first fixed-wing flights were conducted on 19 May 2009 when F/A-18 Super Hornets from Air Test and Evaluation Squadron at Naval Air Station Patuxent River, Maryland began flight deck certification, which tests a carrier's ability to conduct air operations.[22][23] On 26 May 2009, Former President George H.W. Bush and his daughter, Dorothy Bush Koch, flew aboard the carrier to observe flight operations during the ship's underway period in the Atlantic Ocean. USS George H.W. Bush successfully completed her first flight deck certification on that day.[24]

Bush returned to Northrop Grumman Newport News shipyard on 18 June 2009 for post-delivery maintenance work, also known as the ship's post shakedown availability (PSA). A PSA is a typical availability in the early life of a carrier that allows the Navy and builder to resolve any items that came up during trials and delivery and make any last-minute changes and upgrades. Work includes the installation of a Rigid Hull Inflatable Boat (RHIB) handling system and a new fresh water purification system. Other changes include compartment reconfigurations, combat system and radar equipment upgrades, and minor repairs. The work was scheduled to last through early 2010.[25]

First deployment

Bush (background) conducts an ordnance transfer with Harry S Truman off the East Coast in 2011

The ship was assigned to Carrier Strike Group Two for her first deployment. Under the command of Rear Admiral Nora Tyson, George H.W. Bush, Carrier Air Wing Eight and the four ships of her group departed on her first deployment on 15 May 2011. They sailed across the Atlantic to Britain to participate in Exercise Saxon Warrior, held in the Western Approaches and culminating in a so-called 'Thursday War'.[26] She then moved towards Portsmouth, England on 27 May, anchoring adjacent to Stokes Bay through 31 May, because she was too large to enter the harbor, and the naval base did not have sufficient nuclear berths for the carrier to moor alongside.[26][27] The carrier arrived at Naples, Italy on 10 June 2011.[28]

On 23 August 2011, she made her 20,000th arrested fixed wing aircraft recovery (landing) while operating in the Arabian Sea during Operation Enduring Freedom flight operations. This milestone was accomplished by LCDR Chris R. Swanson who was flying an E-2C Hawkeye Airborne early warning and control aircraft assigned to VAW-124 (Carrier Airborne Early Warning Squadron 124).[29]

The carrier returned to Norfolk on 10 December 2011, following a seven-month deployment supporting operations with the U.S. Navy's 5th and 6th fleets.[30]

2012–2013 operations

George H.W. Bush undertakes carrier qualifications in the Atlantic in May 2013; an F/A-18F Super Hornet is on the catapult; another F/A-18F and an X-47B are parked forward of the island superstructure; two more F/A-18Fs and four C-2 Greyhounds are parked aft.

On 25 July 2012, George H.W. Bush began its four-month overhaul at Norfolk Naval Shipyard at Portsmouth, Virginia, included scheduled short-term technical upgrades.[31] On 1 December 2012, George H.W. Bush completed its PIA maintenance cycle and began sea trials on 3 December 2012. After completing sea trials on 4 December 2012, the carrier started its training and qualification cycle in preparation for the group's 2013 deployment.[32][33] During a two-week underway period beginning 14 January 2013, George H.W. Bush tested the MV-22 tilt-rotor aircraft from squadron VMX-22 as a potential carrier on-board delivery aircraft as well as operating mine-sweeping MH-53E helicopters from squadron HM-14.[33][34]

An X-47B is catapulted from Bush in May 2013, the first time a UCAV had been launched from an aircraft carrier at sea, during carrier qualifications in the Atlantic

During another underway period, George H.W. Bush conducted at-sea tests for X-47B unmanned drone in the Atlantic Ocean, including the first time that an unmanned drone has been catapulted off an aircraft carrier on the morning of 14 May 2013 (pictured).[35] On 17 May 2013, another first was achieved when the X-47B performed touch-and-go landings and take-offs on the flight deck of Bush while underway in the Atlantic Ocean.[36] Also during this two-week underway period, the aircraft carrier tested a new torpedo self-defense system, as well as completed more than 115 launches and landings in assessing a new precision landing system, before returning to Norfolk on 24 May 2013.[37]

On 10 July 2013, an unmanned X-47B drone completed an arrested landing on the flight deck of George H.W. Bush. The landing marks the first time any unmanned aircraft had completed an arrested landing on board an aircraft carrier operating at sea.[38] The drone subsequently completed a second successful arrested landing on Bush, but it was diverted to the Wallops Flight Facility in Virginia after an issue was detected, requiring that a planned third landing to be aborted.[39] One of the drone's three navigational sub-systems failed, which was identified by the other two sub-systems. The anomaly was indicated to the mission operator, who followed test plan procedures to abort the landing. The Navy stated that the aircraft's detection of a problem demonstrated its reliability and ability to operate autonomously.[40] On 15 July 2013, in a fourth attempt, a X-47B drone failed to make a successful flight deck landing on board the vessel due to "technical issues."[41]

2014

Bush transits the Straits of Gibraltar in February 2014.

In late February 2014, George H.W. Bush transited the Strait of Gibraltar on the way to a scheduled port stop in Piraeus, Greece, for a scheduled port visit.[42]

On 5 March 2014, George H.W. Bush arrived in southern Turkey, which is under 500 miles away from Crimea, amid developing tensions over Ukraine with Russia.[43] On 9 March 2014, the carrier entered port in Antalya, in southern Turkey.[44] Some news sources had speculated that the ship's stay in the Mediterranean Sea would be extended as a result of the 2014 Crimean crisis, but this proved to not be the case with Carrier Strike Group 2 proceeding through the Suez Canal.[45]

Carl Vinson (foreground) relieves Bush as the 5th Fleet on station carrier in October 2014.

The carrier was transiting the Suez Canal on 18 March 2014. On 23 March 2014, USS Harry S. Truman (CVN-75) officially turned over the watch to George H.W. Bush in the U.S. 5th Fleet area of responsibility conducting maritime security operations and supporting theater security cooperation efforts.

On 14 June 2014, George H.W. Bush was ordered to the Persian Gulf to protect US interests in Iraq in light of the Islamic State takeover of several major cities in that country.

On 8 August 2014, two F/A-18F Super Hornets launched from the ship and conducted an airstrike on Islamic State artillery shelling the Kurdish city of Erbil.[46] The mission was launched in accordance with President Obama's announcement on the evening of 7 August that the US would begin airstrikes to protect US personnel and the Yazidis in the region from ISIS attacks.

On 23 September 2014 F/A-18 Hornets and Super Hornets from Carrier Air Wing Eight have been launched from George H.W. Bush in the Persian Gulf to strike at specific targets in Syria such as command-and-control centers, training camps and weapons depots.[47]

On 2 November 2014 while on route back to the United States, George H. W. Bush put in to the French Mediterranean port of Marseille for rest and recreation.[citation needed]

On 15 November 2014, George H. W. Bush returned to her homeport in Norfolk, Virginia after a nine-month deployment.

References

Notes

  1. 1.0 1.1 1.2 1.3 1.4 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 6.2 6.3 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Ryder, Robert Randall "My War Chuck Downey Youngest Naval Aviator in WWII." Sea Classics, August 2013. "Off he went for training in Memphis, Tenn., before heading to Pensacola, Fla., for flight school, where he was commissioned as an Ensign in the U.S. Navy on July 16, 1943. Downey was the tender age of 18 years, 11 months and 14 days when he earned his wings."
  9. 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Shapiro, Michael Welles, "Naval Shipyard Tackles Toilet Clogs On The Bush While Ship Is In For Repairs", Newport News Daily Press, 29 September 2012
  15. Maritime Quest, USS George H. W. Bush CVN-77
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. 26.0 26.1 [1] Archived 21 February 2015 at the Wayback Machine
  27. McMichael, William H., "Carrier Bush set for first overseas deployment", Military Times, 10 May 2011.
  28. Ziezulewicz, Geoff, "Navy's newest carrier reaches Naples during first deployment", Stars and Stripes, 11 June 2011.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found. and Lua error in package.lua at line 80: module 'strict' not found.
  32. Lua error in package.lua at line 80: module 'strict' not found. and Lua error in package.lua at line 80: module 'strict' not found.
  33. 33.0 33.1 Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.[dead link]
  36. Lua error in package.lua at line 80: module 'strict' not found.
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. Lua error in package.lua at line 80: module 'strict' not found.
  40. Lua error in package.lua at line 80: module 'strict' not found.
  41. Lua error in package.lua at line 80: module 'strict' not found.
  42. Lua error in package.lua at line 80: module 'strict' not found.
  43. An American Flattop Is Just 500 Miles From Crimea — War is Boring — Medium
  44. Lua error in package.lua at line 80: module 'strict' not found.
  45. Lua error in package.lua at line 80: module 'strict' not found.
  46. Lua error in package.lua at line 80: module 'strict' not found.
  47. [2] US, Arab allies launch first wave of strikes in Syria. Retrieved on 23 September 2014.

Further reading

  • Lua error in package.lua at line 80: module 'strict' not found.

External links