USS John F. Kennedy (CVN-79)
Illustration of USS John F. Kennedy (CVN-79) (110623-N-ZZ999-203).jpg
Artist impression of John F. Kennedy
History
United States
Name: John F. Kennedy
Namesake: John F. Kennedy
Builder: Huntington Ingalls Industries
Cost: $11.341 billion [1]
Laid down: 22 August 2015
Launched: 2019, planned
Sponsored by: Caroline Kennedy
Identification: CVN-79
Status: Under construction
General characteristics
Class & type: Gerald R. Ford-class aircraft carrier
Type: Nuclear Aircraft Carrier
Displacement: About 100,000 long tons (110,000 short tons; 100,000 tonnes) (full load)[2]
Length: 1,106 ft (337 m)
Beam: 134 ft (41 m)
Draft: 39 ft (12 m)
Installed power: Two A1B nuclear reactors
Propulsion: Four shafts
Speed: In excess of 30 knots (56 km/h; 35 mph)
Range: Unlimited distance; 20–25 years
Complement: 4,660
Armament:
Aircraft carried: More than 80, can hold up to 90 combat aircraft
Aviation facilities: 1,092 ft × 256 ft (333 m × 78 m) flight deck

USS John F. Kennedy (CVN-79) is the second Gerald R. Ford-class aircraft carrier being built for the United States Navy. The ship is under construction and planned to be commissioned in 2020.

Naming

On 7 December 2007, the 66th anniversary of the Attack on Pearl Harbor, Congressman Harry Mitchell (D-AZ) proposed naming this ship USS Arizona. In 2009, Congressman John Shadegg (R-AZ) proposed naming either CVN-79 or the subsequent CVN-80 Barry M. Goldwater, after Barry Goldwater, the late senator from Arizona.[3] On 29 May 2011, the Department of Defense announced that the ship would be named for John F. Kennedy (1917–1963), the 35th President of the United States, who served in the navy during World War II[4] She will be the third navy ship named after members of the Kennedy family, and the second aircraft carrier named John F. Kennedy, succeeding USS John F. Kennedy (CV-67), which served from 1968 to 2007.

Construction

John F. Kennedy being constructed in September 2018

On 15 January 2009, Huntington Ingalls Industries (HII) Northrop Grumman Shipbuilding was awarded a $374 million contract for design work and construction preparation for John F. Kennedy.[5] On 30 September 2010, Northrop Grumman announced that preparations were under way to begin construction.[6] On 25 February 2011, the Navy conducted the First Cut of Steel ceremony at Northrop Grumman in Newport News, signalling the formal start of construction for John F. Kennedy.[7][8]

John F. Kennedy was originally planned to be completed in 2018. This was extended to 2020 after Secretary of Defense Robert Gates announced in 2009 that the program would shift to a five-year building program so as to place it on a "more fiscally sustainable path". By late 2012, delays had occurred in construction, and the Navy Department was investigating extending the construction time of both Enterprise and John F. Kennedy by an additional two years which could delay the carrier's entry into service until 2022.[1] In September 2013, the Government Accountability Office recommended delaying the detail design and construction contract for John F. Kennedy until programmatic shortfalls are sorted out. The Navy and Defense Department have rejected the recommendation. The Navy faces technical, design, and construction challenges to completing Gerald R. Ford, including producing systems prior to demonstrating their maturity to meet required installation dates. Gerald R. Ford had costs increase by 22% to $12.8 billion, and additional increases could follow due to uncertainties facing critical technology systems and shipbuilder under performance. Risk is introduced in the Navy's plan to conduct integration testing of key systems at the same time as initial operational test and evaluation. One action the GAO says could be taken to ensure Ford-class carrier acquisitions are supported is conducting a cost-benefit analysis of required capabilities and associated costs.[9]

The ship's keel was laid in Newport News, Virginia on 22 August 2015.[10] As part of the traditional keel laying ceremony, the initials of ship sponsor Caroline Kennedy, daughter of President Kennedy and the sponsor of the previous John F. Kennedy, were welded into the ship's hull.[10] As of late June 2017 the ship was 50% structurally complete.[11] On 28 February 2018, Huntington Ingalls Industries announced that its Newport News Shipbuilding division had built 70% of the structures necessary to complete John F. Kennedy.[12] On 30 April 2018, Huntington Ingalls Industries announced that she was "75 percent structurally erected and more than 40 percent complete." As of the release date, 341 of the 447 super-lift sections were currently in place. The ship is scheduled to be christened in the latter half of 2019, commissioned in 2020,[1][13] On 3 May 2018 Huntington Ingalls President & CEO Mike Petters reported that John F. Kennedy was tracking to be launched three months ahead of schedule in the fourth quarter of 2019.[14] On 30 May 2019 the 588 ton bridge and island was installed completing the ship and placing the final piece of the puzzle on deck. Under the island Captain Todd Marzano placed his wings and the first Kennedy half dollar which was donated by Caroline Kennedy was put in place. Next to these Rear Admiral Brian Antonio, Rear Admiral Roy Kelly, and Jennifer Boykin placed coins each embossed with quotes from President Kennedy and parts of the ships motto. Caroline could not make it so she had Lee Murphy gave the order via radio for the crane operator to lift the island and set it down on the deck crushing the ceremonial items and entombing them in the ships superstructure completing the ship. [15]

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Frost, Peter, "U.S. Navy's Next Aircraft Carrier Will Be Named After The Late John F. Kennedy", Newport News Daily Press, 30 May 2011.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Frost, Peter, "Shipyard Cuts First Steel For Next Carrier; Funding Remains In Flux", Newport News Daily Press, 26 February 2011.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.

External links