USS Nautilus (SSN-571)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

300px
The retired Nautilus heads home on 8 May 2002, after preservation by the Electric Boat Division.
History
United States
Name: USS Nautilus
Operator:  United States Navy
Awarded: 2 August 1951
Builder: General Dynamics
Laid down: 14 June 1952
Launched: 21 January 1954
Sponsored by: Mamie Eisenhower
Completed: 22 April 1955
Commissioned: 30 September 1954
Decommissioned: 3 March 1980
Struck: 3 March 1980
Status: Museum ship
General characteristics
Type: Nuclear submarine
Displacement: 3,533 tons surface, 4,092 tons submerged[1]
Length: 320 ft (98 m)
Beam: 28 ft (8.5 m)
Draft: 26 ft (7.9 m)
Installed power: 13,400 hp (10.0 MW)[2]
Propulsion: STR nuclear reactor (later redesignated S2W), geared steam turbines, two shafts
Speed: 23 knots (43 km/h; 26 mph)[3]
Complement: 13 officers, 92 enlisted
Armament: 6 torpedo tubes
Nautilus (Nuclear Submarine)
USS Nautilus SSN571.JPG
USS Nautilus docked at the Submarine Force Library and Museum
Location Groton, CT
Built 1954
Architect General Dynamics Corporation
Architectural style Other
NRHP Reference # 79002653
Significant dates
Added to NRHP 16 May 1979[4]
Designated NHL 20 May 1982[5]

USS Nautilus (SSN-571) was the world's first operational nuclear-powered submarine. The vessel was the first submarine to complete a submerged transit of the North Pole on 3 August 1958. Sharing names with Captain Nemo's fictional submarine in Jules Verne's Twenty Thousand Leagues Under the Sea, and named after another USS Nautilus (SS-168) that served with distinction in World War II, Nautilus was authorized in 1951 and launched in 1954. Because her nuclear propulsion allowed her to remain submerged far longer than diesel-electric submarines, she broke many records in her first years of operation, and traveled to locations previously beyond the limits of submarines. In operation, she revealed a number of limitations in her design and construction. This information was used to improve subsequent submarines.

Nautilus was decommissioned in 1980 and designated a National Historic Landmark in 1982. The submarine has been preserved as a submarine museum in Groton, Connecticut, where the vessel receives some 250,000 visitors a year.

Planning and construction

Admiral Hyman G. Rickover aboard the Nautilus
File:Nautiluscore.jpg
Launching Nautilus

In July 1951 the United States Congress authorized the construction of a nuclear-powered submarine for the U.S. Navy, which was planned and personally supervised by Admiral Hyman G. Rickover, known as the "Father of the Nuclear Navy."[6] On 12 December 1951 the US Department of the Navy announced that the submarine would be called Nautilus, the fourth U.S. Navy vessel officially so named. The boat carried the hull number SSN-571.[1]

Nautilus's reactor core prototype at the S1W facility in Idaho

Nautilus's keel was laid at General Dynamics' Electric Boat Division in Groton, Connecticut by Harry S. Truman on 14 June 1952.[7] She was christened on 21 January 1954 and launched into the Thames River, sponsored by Mamie Eisenhower. Nautilus was commissioned on 30 September 1954, under the command of Commander Eugene P. Wilkinson, USN.[1]

Nautilus was powered by the Submarine Thermal Reactor (STR), later redesignated the S2W reactor, a pressurized water reactor produced for the US Navy by Westinghouse Electric Corporation. Bettis Atomic Power Laboratory, operated by Westinghouse, developed the basic reactor plant design used in Nautilus after being given the assignment on 31 December 1947 to design a nuclear power plant for a submarine.[8] Nuclear power had the crucial advantage in submarine propulsion because it is a zero-emission process that consumes no air. This design is the basis for nearly all of the US nuclear-powered submarine and surface combat ships, and was adapted by other countries for naval nuclear propulsion. The first actual prototype (for Nautilus) was constructed and tested by the Argonne National Laboratory in 1953 at the S1W facility, part of the National Reactor Testing Station in Idaho.[9][10]

Nautilus' ship's patch was designed by The Walt Disney Company, and her wardroom currently displays a set of tableware made of zirconium, as the reactor core was partly made of zirconium.

"Underway on nuclear power"

Following her commissioning, Nautilus remained dockside for further construction and testing. At 11 a.m. on 17 January 1955 she put to sea for the first time and signaled her historic message: "Underway on nuclear power."[11] On 10 May, she headed south for shakedown. Submerged throughout, she traveled 1,100 nautical miles (2,000 km; 1,300 mi) from New London to San Juan, Puerto Rico and covered 1,200 nautical miles (2,200 km; 1,400 mi) in less than ninety hours. At the time, this was the longest submerged cruise by a submarine and at the highest sustained speed (for at least one hour) ever recorded.

USS Nautilus during her initial sea trials, 20 January 1955

From 1955 to 1957, Nautilus continued to be used to investigate the effects of increased submerged speeds and endurance. The improvements rendered the progress made in anti-submarine warfare during World War II virtually obsolete. Radar and anti-submarine aircraft, which had proved crucial in defeating submarines during the war, proved ineffective against a vessel able to quickly move out of an area, change depth quickly and stay submerged for very long periods.[12]

On 4 February 1957, Nautilus logged her 60,000th nautical mile (110,000 km; 69,000 mi), matching the endurance of her namesake, the fictional Nautilus described in Jules Verne's novel Twenty Thousand Leagues Under The Sea.[13] In May, she departed for the Pacific Coast to participate in coastal exercises and the fleet exercise, operation "Home Run," which acquainted units of the Pacific Fleet with the capabilities of nuclear submarines.

Nautilus passes under the George Washington Bridge during a visit to New York Harbor in 1956

Nautilus returned to New London, Connecticut, on 21 July and departed again on 19 August for her first voyage of 1,200 nautical miles (2,200 km; 1,400 mi) under polar pack ice. Thereafter, she headed for the Eastern Atlantic to participate in NATO exercises and conduct a tour of various British and French ports where she was inspected by defense personnel of those countries. She arrived back at New London on 28 October, underwent upkeep, and then conducted coastal operations until the spring.

Operation Sunshine – under the North Pole

In response to the nuclear ICBM threat posed by Sputnik, President Eisenhower ordered the U.S. Navy to attempt a submarine transit of the North Pole to gain credibility for the soon-to-come SLBM weapons system.[14] On 25 April 1958, Nautilus was underway again for the West Coast, now commanded by Commander William R. Anderson, USN. Stopping at San Diego, San Francisco, and Seattle, she began her history-making polar transit, operation "Sunshine", as she departed the latter port on 9 June. On 19 June she entered the Chukchi Sea, but was turned back by deep drift ice in those shallow waters. On 28 June she arrived at Pearl Harbor to await better ice conditions. By 23 July her wait was over, and she set a course northward. She submerged in the Barrow Sea Valley on 1 August and on 3 August, at 2315 (EDT) she became the first watercraft to reach the geographic North Pole.[15] The ability to navigate at extreme latitudes and without surfacing was enabled by the technology of the North American Aviation N6A-1 Inertial Navigation System, a naval modification of the N6A used in the Navaho cruise missile; it had been installed on Nautilus and Skate after initial sea trials on the USS Compass Island in 1957.[16] From the North Pole, she continued on and after 96 hours and 1,590 nautical miles (2,940 km; 1,830 mi) under the ice, surfaced northeast of Greenland, having completed the first successful submerged voyage around the North Pole. The technical details of this mission were planned by scientists from the Naval Electronics Laboratory including Dr. Waldo Lyon who accompanied Nautilus as chief scientist and ice pilot.

Navigator's report: Nautilus, 90°N, 19:15U, 3 August 1958, zero to North Pole.

Navigation beneath the arctic ice sheet was difficult. Above 85°N both magnetic compasses and normal gyrocompasses become inaccurate. A special gyrocompass built by Sperry Rand was installed shortly before the journey. There was a risk that the submarine would become disoriented beneath the ice and that the crew would have to play "longitude roulette". Commander Anderson had considered using torpedoes to blow a hole in the ice if the submarine needed to surface.[citation needed]

The most difficult part of the journey was in the Bering Strait. The ice extended as much as 60 feet (18 m) below sea level. During the initial attempt to go through the Bering Strait, there was insufficient room between the ice and the sea bottom. During the second, successful attempt to pass through the Bering passage, the submarine passed through a known channel close to Alaska (this was not the first choice, as the submarine wanted to avoid detection).

The trip beneath the ice cap was an important boost to America as the Soviets had recently launched Sputnik, but had no nuclear submarine of their own. During the address announcing the journey, the president mentioned that one day nuclear cargo submarines might use that route for trade.[17]

As Nautilus proceeded south from Greenland, a helicopter airlifted Commander Anderson to connect with transport to Washington, D.C. At a White House ceremony on 8 August, President Eisenhower presented him with the Legion of Merit and announced that the crew had earned a Presidential Unit Citation.[18]

At her next port of call, the Isle of Portland, England, she received the Unit Citation, the first ever issued in peace time, from American Ambassador JH Whitney, and then crossed the Atlantic reaching New London, Connecticut, U.S.A. on 29 October. For the remainder of the year Nautilus operated from her home port of New London.

Operational history

Following fleet exercises in early 1959, Nautilus entered the Portsmouth Naval Shipyard in Kittery, Maine, for her first complete overhaul (28 May 1959 – 15 August 1960). Overhaul was followed by refresher training and on 24 October she departed New London for her first deployment with the Sixth Fleet in the Mediterranean Sea, returning to her home-port 16 December.

Nautilus spent most of her career assigned to SubRon Ten (Submarine Squadron Ten) at State Pier in New London, Connecticut. The squadron commander was stationed aboard the USS Fulton (AS-11), a submarine tender also stationed at State Pier. Nautilus and other submarines in the squadron made their home tied up alongside the tender, where they received preventive maintenance and, if necessary, repairs, from the well-equipped Fulton and her crew of machinists, millwrights, and other craftsmen.

Nautilus operated in the Atlantic, conducting evaluation tests for ASW improvements, participating in NATO exercises and, during October 1962, in the naval quarantine of Cuba, until she headed east again for a two-month Mediterranean tour in August 1963. On her return she joined in fleet exercises until entering the Portsmouth Naval Shipyard for her second overhaul 17 January 1964.

On 2 May 1966, Nautilus returned to her homeport to resume operations with the Atlantic Fleet, and at some point around that month, logged her 300,000th nautical mile (560,000 km; 350,000 mi) underway. For the next year and a quarter she conducted special operations for ComSubLant and then in August 1967, returned to Portsmouth, for another year's stay. During an exercise in 1966 she collided with the aircraft carrier USS Essex on 10 November, while diving shallow. Following repairs in Portsmouth she conducted exercises off the southeastern seaboard. She returned to New London in December 1968 and operated as a unit of Submarine Squadron 10 for most of the remainder of her career.

In the spring[when?] of 1979, Nautilus set out from Groton, Connecticut on her final voyage under the command of Richard A. Riddell. She reached Mare Island Naval Shipyard of Vallejo, California on 26 May 1979, her last day underway. She was decommissioned and stricken from the Naval Vessel Register on 3 March 1980.

Noise

Toward the end of its service, the hull and superstructure of Nautilus vibrated sufficiently that sonar became ineffective at more than 4 knots (7.4 km/h; 4.6 mph) speed.[19] As noise generation is extremely undesirable in submarines, this made the vessel vulnerable to detection. Lessons learned from this problem were applied to later nuclear submarines.[20]

Awards and commendations

103px
Presidential Unit Citation
with Operation Sunshine clasp
National Defense
Service Medal

Presidential Unit Citation

<templatestyles src="Template:Blockquote/styles.css" />

For outstanding achievement in completing the first voyage in history across the top of the world, by cruising under the Arctic ice cap from the Bering Strait to the Greenland Sea.

During the period 22 July 1958 to 5 August 1958, USS Nautilus, the world's first atomic powered ship, added to her list of historic achievements by crossing the Arctic Ocean from the Bering Sea to the Greenland Sea, passing submerged beneath the geographic North Pole. This voyage opens the possibility of a new commercial seaway, a Northwest Passage, between the major oceans of the world. Nuclear-powered cargo submarines may, in the future, use this route to the advantage of world trade.

The skill, professional competency and courage of the officers and crew of Nautilus were in keeping with the highest traditions of the Armed Forces of the United States and the pioneering spirit which has always characterized our country.[21]

To commemorate the first submerged voyage under the North Pole, all Nautilus crewmembers who made the voyage may wear a Presidential Unit Citation ribbon with a special clasp in the form of a gold block letter N (image above).[22]

Museum

Nautilus was designated a National Historic Landmark by the United States Secretary of the Interior on 20 May 1982.[5][23]

She was named as the official state ship of Connecticut in 1983.[24] Following an extensive conversion at Mare Island Naval Shipyard, Nautilus was towed back to Groton, Connecticut arriving on 6 July 1985. On 11 April 1986, Nautilus opened to the public as part of the Submarine Force Library and Museum.[15]

Nautilus now serves as a museum of submarine history operated by the Naval History & Heritage Command. The ship underwent a five-month preservation in 2002 at the Electric Boat division of General Dynamics, at a cost of approximately $4.7 million ($6.18 million in present-day terms[25]). Nautilus attracts some 250,000 visitors annually to her present berth near Naval Submarine Base New London.

Nautilus celebrated the 50th anniversary of her commissioning on 30 September 2004 with a ceremony that included a speech from Vice Admiral Eugene P Wilkinson, the first Commanding Officer of Nautilus, and a designation of the ship as an American Nuclear Society National Nuclear Landmark.

Visitors may tour the forward two compartments, with guidance from an automated system. Despite similar alterations to exhibit the engineering spaces, tours aft of the control room are not permitted due to safety and security concerns.

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Argonne National Laboratory News Release, 21 January 1996, retrieved 31 December 2014
  10. Reactors designed by Argonne National Laboratory, retrieved 31 December 2014
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. “Atomic Sub Crosses North Pole,” Richmond Times-Dispatch, Richmond, VA (9 August 1952).
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found. and
    Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.[dead link]
  25. 1634 to 1699: Lua error in package.lua at line 80: module 'strict' not found. 1700-1799: Lua error in package.lua at line 80: module 'strict' not found. 1800–present: Lua error in package.lua at line 80: module 'strict' not found.

External links

Lua error in package.lua at line 80: module 'strict' not found.