Wittpenn Bridge

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Wittpenn Bridge
300px
Wittpenn Bridge, looking east in a 2004 photo
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Carries 4 Lanes of Route 7
Crosses Hackensack River
Locale Jersey City and Kearny, New Jersey
Official name Wittpenn Bridge
Other name(s) Route 7 Bridge
Maintained by New Jersey Department of Transportation
ID number 0909150[1]
Characteristics
Design Lift bridge
Total length 2,169 feet (661 m)
Width 40 feet (12 m)
Longest span 83 feet (25 m)
Clearance below 35 feet (11 m) (lowered)
100 feet (30 m) (raised)
History
Opened November 5, 1930
Statistics
Daily traffic 50,000
Wittpenn Bridge is located in New York City
Wittpenn Bridge
Wittpenn Bridge

The Wittpenn Bridge is a vertical lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge comprises four 10-foot (3.0 m)-wide lanes, extending 2,169 feet (661 m) and standing 35 feet (11 m) above mean high water with an 209-foot (64 m) main lift span. Bridge construction commenced 1927, and was opened to vehicular traffic November 5, 1930. The bridge has an annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.[2]

When raised, the bridge provides 100 feet (30 m) of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.[2]

The New Jersey Department of Transportation (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011 and the overall project is expected to take six years to complete. The new bridge will be situated just north of the existing bridge.[3]

The reconstruction of the bridge is being partially funded by the Port Authority of New York and New Jersey and will be fully operational in 2021.[4]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
  3. Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.
  4. Lua error in package.lua at line 80: module 'strict' not found.

External links