Aswan Low Dam

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Aswan Low Dam
File:Aswan low dam2.JPG
Aswan Low Dam
Official name Aswan Low Dam
Location Egypt
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Construction began 1899
Opening date 1902
Owner(s) Egypt
Operator(s) Egypt
Dam and spillways
Type of dam Gravity, masonry buttress
Impounds River Nile
Height 36 m (118 ft)
Length 1,950 m (6,400 ft)
Spillway type Floodgates
Reservoir
Creates tailwater of Lake Nasser
Total capacity 5,300×10^6 m3 (4,300,000 acre·ft)
Power station
Commission date Aswan I:1960
Aswan II:1980-85
Turbines Aswan I: 7 x 40 MW (54,000 hp) Kaplan-type
Aswan II: 4 x 67.5 MW (90,500 hp) Kaplan-type
Installed capacity 592 MW (794,000 hp) (Aswan I,II)

The Aswan Low Dam or Old Aswan Dam is a gravity masonry buttress dam on the Nile River in Aswan, Egypt. The dam was built at the former first cataract of the Nile, and is located about 1000 km up-river and 690 km (direct distance) south-southeast of Cairo. When initially constructed between 1899 and 1902, nothing of its scale had ever been attempted; on completion, it was the largest masonry dam in the world. The dam was designed to provide storage of annual floodwater and augment dry season flows to support greater irrigation development[1] and population growth in the lower Nile. The dam, originally limited in height by conservation concerns, worked as designed, but provided inadequate storage capacity for planned development and was raised twice, between 1907–1912 and again 1929–1933. These heightenings still did not meet irrigation demands and in 1946 it was nearly over-topped in an effort to maximize pool elevation. This led to the investigation and construction of the Aswan High Dam 6 kilometres (3.7 mi) upstream.[2]

Background

The earliest recorded attempt to build a dam near Aswan was in the 11th century, when the Arab polymath and engineer Ibn al-Haytham (known as Alhazen in the West) was summoned to Egypt by the Fatimid Caliph, Al-Hakim bi-Amr Allah, to regulate the flooding of the Nile, a task requiring an early attempt at an Aswan Dam.[3] After his field work convinced him of the impracticality of this scheme,[4] and fearing the Caliph's anger, he feigned madness. He was kept under house arrest from 1011 until al-Hakim's death in 1021, during which time he wrote his influential Book of Optics.

Construction

Following their 1882 invasion and occupation of Egypt, the British began construction of the first dam across the Nile in 1898. Construction lasted until 1902, and it was opened on 10 December 1902, by HRH the Duke of Connaught and Strathearn. The project was designed by Sir William Willcocks and involved several eminent engineers of the time, including Sir Benjamin Baker and Sir John Aird, whose firm, John Aird & Co., was the main contractor.[5][6] Capital and financing were furnished by Ernest Cassel.[7]

The Old Aswan Dam was designed as a gravity-buttress dam; the buttress sections accommodate numerous gates, which were opened yearly to pass the flood and its nutrient-rich sediments, but without retaining any yearly storage. The dam was constructed of rubble masonry and faced with red ashlar granite. When constructed, the Old Aswan Dam was the largest masonry dam in the world.[8] The design also included a navigation lock of similar construction on the western bank, which allowed shipping to pass upstream as far as the second cataract, whereas a portage overland was previously required. At the time of its construction, nothing of such scale had ever been attempted.[9]

Heightening

Despite initial limitations imposed on its height, due to concern for the Philae Temple, the initial construction was soon found to be inadequate for development needs, and the height of the dam was raised in two phases, 5 metres (16 ft) between 1907–1912 and 9 metres (30 ft) between 1929–1933, and generation of electricity was added. The first phase was supervised by Sir Benjamin Baker, though much of the detailed work was undertaken by Murdoch MacDonald.[10]

With its final raising (designed and supervised by MacDonald's firm, Sir M MacDonald & Partners),[10] the dam is 1,950 metres (6,400 ft) in length, with a crest level 36 metres (118 ft) above the original riverbed;[8] the dam provides the main route for traffic between the city and the airport. With the construction of the High Dam upstream, the Old Dam's ability to pass the flood's sediments was lost, as was the serviceability provided by the locks. The previous Old Dam reservoir level was also lowered and now provides control of tailwater for the High Dam.

Power plants

The Aswan Low Dam supports two hydroelectric power plants, Aswan I (1960) and Aswan II (1985–1986). Aswan I contains 7 X 40 megawatts (54,000 hp) generators with Kaplan turbines for a combined capacity of 280 megawatts (380,000 hp) and is located west of the dam. Aswan II contains 4 x 67.5 megawatts (90,500 hp) generators for an installed capacity of 270 megawatts (360,000 hp) and is located at the toe of the dam.[11]

Further reading

References

  1. Power from the Assuan Dam to Be Used to Increase Still Further the Cotton Crop in Egypt, The New York Times, July 27, 1913, (pdf file)
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Egypt bond
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Finance, Jewish Encyclopedia c.1906
  8. 8.0 8.1 V. Novokshshenov, Laboratory studies of the stone masonry in the Old Aswan Dam, Materials and Structures 1993, Vol. 26, p. 103-110
  9. Frederic Courtland Penfield, Harnessing the Nile, Century Magazine, Vol. 57, No. 4 (February 1899)
  10. 10.0 10.1 Grace's Guide (1952) Murdoch MacDonald obituary. Accessed: 4 January 2014.
  11. Lua error in package.lua at line 80: module 'strict' not found.