Culoz–Modane railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Culoz–Modane railway
File:Orelle BB.26075 + 26163 + rame allemande (fd).JPG
Overview
System SNCF
Status Operational
Locale France (Rhône-Alpes)
Termini Gare de Culoz
Gare de Modane
Operation
Opened 1856-1871
Owner RFF
Operator(s) SNCF
Technical
Line length 135 km (84 mi)
No. of tracks Double track[2]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 1500 V DC[1]
Route map

The Culoz–Modane railway (sometimes called Ligne de la Maurienne) is a 135 kilometres (84 miles) long railway running from Culoz, near Chambéry, through Saint-Jean-de-Maurienne to Modane in France. Together with the Italian Turin–Modane railway it is often called "Fréjus Railway" or "Mont Cenis Railway".

Despite running under the Fréjus Pass, it is sometimes called the Mont Cenis Railway because, from antiquity until the Fréjus Rail Tunnel was opened in 1871, most people used the Mont Cenis Pass to get between France and Italy. From 1868 to 1871 the temporary Mont Cenis Pass Railway ran over the Mont Cenis pass to link the French and Italian railways.

The Culoz–Modane railway is operated by the SNCF, and the line from Modane to Turin that connects with it is operated by FS.

History

The Victor Emmanuel Railway, which included both the Culoz–Modane railway across Savoy and the Turin–Modane railway across Piedmont, was largely built in the 1850s by the Kingdom of Sardinia and named after its king, Victor Emmanuel II.[3] The section between Culoz and Saint-Jean-de-Maurienne was opened between 1856 and 1858.

Until 1860 Sardinia included both Savoy and Piedmont. Then however, ownership of Savoy and the County of Nice passed to France. In 1862 the Culoz–Modane railway became part of the Paris-Lyon-Marseille Railway[3] and the line was extended to Saint-Michel-de-Maurienne.[4] The remaining section between Saint-Michel and Modane and the tunnel towards Italy were opened on 16 October 1871.[5]

On 12 December 1917, a troop train derailed at speed at Saint-Michel-de-Maurienne killing several hundred soldiers; see Saint-Michel-de-Maurienne derailment.

Description

File:Fret SNCF en Maurienne, automne 2015.JPG
Freight train on the line crossing the Arc

The 20 kilometres long section between St. Michel to Modane on the north side of the Mont Cenis Tunnel has a maximum inclination (gradient) of 3%, an average inclination of 2.1% and a smallest curvature radius of 350 metres. The erection of support structures in difficult areas with danger from landslides, and of tunnels with a total length of 4624 metres was necessary. The 41 kilometres long section between Bardonecchia and the south terminus of the Mont Cenis Tunnel has a maximum inclination of 3 per cent, an average inclination of 2.05% and a smallest curvature of radius of 450 metres. On this section 18 bridges and 26 tunnels with a total length of 8115 metres were built.

In 1925 the railway between Modane and Chambéry was electrified with 1.5 kV DC, using a third rail. This was the highest voltage ever used on a third rail system in Europe. In 1976 the third rail was replaced by an overhead wire.

See also

Further reading

  • Sylvain Meillason, Mont Cenis/Fréjus route: ready for relaunch, Today's Railways Europe, June 2009, Gives history, map and current plans.

References

  1. RFF - Map of electrified railway lines PDF
  2. RFF - Network map PDF
  3. 3.0 3.1 P. J. G. Ransom (1999), The Mont Cenis Fell Railway, Truro: Twelveheads Press, pp 13, 14, 62
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Ransom p 62

External links