Expressway S1 (Poland)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Expressway S1 shield}}

Expressway S1
Droga ekspresowa S1
290px
Route information
Part of E75
Length: 93.1 km (57.8 mi)
132.81 km (82.52 mi) planned
Major junctions
From: A1-PL.svg A1 near Katowice International Airport in Pyrzowice
  DK86-PL.svg 86 near Podwarpie

DK94-PL.svg 94 in Dąbrowa Górnicza
DK79-PL.svg 79 in Mysłowice
A4-PL.svg A4 near Mysłowice
DK86-PL.svg 86 near Tychy
S69-PL.svg S69 near Bielsko-Biała

DK1-PL.svg 1 near Bielsko-Biała

DK81-PL.svg 81 near Cieszyn
To: SilniceI48.svg R48, border with Czech Republic
Location
Major cities: Dąbrowa Górnicza, Sosnowiec, Mysłowice, Tychy, Bielsko-Biała, Cieszyn
Highway system
National roads in Poland
Express road S1 in Bielsko-Biała

Expressway S1 or express road S1 is an expressway under construction in Poland with a planned length of 130 km (81 mi), which is located in the Silesian and Lesser Poland voivodeships. Upon completion it will connect the A1 motorway with the A4 motorway and the border of the Czech Republic in Cieszyn-Boguszowice along with the Expressway R48 in the Czech Republic. The main part of the route is Eastern beltway of Upper Silesian Industrial Region.

Expressway route description

Pyrzowice-Tychy[1]

Number of exit (facility) Exits, facilities Mileage from beginning 1st carriageway state 2nd carriageway state History of construction/preparation Notes
1) PyrzowiceA1-PL.svg 0 km Done Done Opened in June 2012 Terminus
2) Pyrzowice-LotniskoDK78-PL.svg40x40px 1.9 km (1.18 mi) Was the terminus till June 2012 From here to Podwarpie one-carriageway
3) Mierzęcice 5.5 km (3.42 mi) Tendered Opened in November 2006
4) PodwarpieDK86-PL.svg(southbound)

DK1-PL.svg(northbound)

12.8 km (7.95 mi) 4-laned starting 1 km before interchange
5) Ząbkowice40x40px 20.2 km (12.55 mi) With environmental decision Planned, 4-laned road at the moment
6) No name (Dąbrowa-Górnicza-Laski) 22.6 km (14.04 mi) Done Completed 1978-1983
7) No name (Dąbrowa-Górnicza-Golonóg) 24.3 km (15.10 mi)
8) No nameDK94-PL.svg 25.2 km (15.66 mi)
9) No name(Dąbrowa-Górnicza-Porąbka) 28.9 km (17.96 mi)
(1) Petrol station 31.8 km (19.76 mi) Koniczyna
10) No name 33.2 km (20.63 mi) Completed 1978-1983 Entrance/exit northbound only
11) Brzęczkowice-IDK79-PL.svg 36.9 km (22.93 mi)
12) Brzęczkowice-IIA4-PL.svgE40-PL.svgE462-PL.svg(E462 starting from the interchange eastbound) 39.2 km (24.36 mi) Entrance to toll road
13) Brzezinka40x40px 41.2 km (25.60 mi) Droga wójewodska 934 goes parallel with S1
14) No name(Mysłowice-Kosztowy-I) 42.1 km (26.16 mi)
15) No name 40x40px(Imielin)

Other name: Kosztowy-IIS1-PL.svg(passing the stages to achieve the environmetal decision)

43.3 km (26.91 mi) Exit only southbound, entrance only northbound
16) No name(Lędziny) 46.2 km (28.71 mi)
(2) MOP Lędziny 48.8 km (30.32 mi) Petrol station, restaurant
17) Tychy DK86-PL.svg 54.8 km (34.05 mi) Terminus

Kosztowy-II-Bielsko-Biała

As of the end of may there were 5 road options. At that time option IV(D) was preferable. It had to go parallel to Brzeszcze – Oświęcim railway tracks. However, UNESCO protested against the choice, as, in their opinion, it would have crossed the quietness line around the former German concentration camp Auschwitz-Birkenau, and, as the result, UNESCO would have put the camp into the endangered list.

At the beginning of August the head of Miedźna commune has announced to media his option of the S1 (option VI), that would have gone on the borders of the Miedźna i Bojszowy communes, through the forest. In November 2009 it was accepted by all the local communes. However, GDDKiA rseignated from option VI because of environmental issues. The road would have passed through "Stawy w Brzeszczach" reserve for birds conservation, which was not acceptable.[2]

Option VI

Communes through which the road would have passed according to the option VI
    • Mysłowice (Kosztowy)
    • Lędziny
    • Bieruń
    • Oświęcim (Stare Stawy)
    • Brzeszcze
    • Dankowice
    • Stara Wieś
    • Bielsko-Biała (Suchy Potok) In 2013 the Economical, Technical and Environmental Institution has proposed 4 choices (A, B, C, and D), of which choices A and C were preferred. However, the mining company "Brzeszcze" was against choice C, and "SILESIA" mining enterprise against A. As a compromise, GDDKIA promised to work on the additional option "E". Preparatory works for DŚU were done by 7 January 2015. In March 2015 choice "E" was chosen as preferred. In June the same year Regional Directorate of the Environment Protection in Katowice has asked GDDKiA to give out the environmental decision for the section.

Option V

Communes through which the road would have passed according to the option V
    • Mysłowice (Kosztowy)
    • Lędziny
    • Bieruń
    • Międzyrzecze
    • Gilowice
    • Miedźna
    • Bestwinka
    • Kaniów
    • Dankowice
    • Stara Wieś
    • Bielsko-Biała (Suchy Potok)

The project will cost approximately 1.437 bln złotych.[3]

Interchanges
  • „Kosztowy II"(after construction the road to Tychy will br signed as S1A)
  • „Lędziny"
  • „Bieruń"DK44-PL.svg
  • „Oświęcim"(future connection to Oświęcim bypass)
  • „Wola”
  • „Brzeszcze"40x40px
  • „Stara Wieś"
  • „Suchy Potok" S69-PL.svg

4 options from 2013

  • Option A [39,7 km] would have run through the next communes:
    • Mysłowice
    • Lędziny
    • Imielin
    • Bieruń
    • Bojszowy
    • Miedźna
    • Bestwina
    • Wilamowice
    • Bielsko-Biała
  • Option B (40.4 km)would have run through the next communes:
    • Mysłowice
    • Lędziny
    • Imielin
    • Bieruń
    • Bojszowy
    • Oświęcim
    • Bestwina
    • Brzeszcze
    • Wilamowice
    • Bielsko-Biała
  • Option C (40.8 km)would have run through the next communes:
    • Mysłowice
    • Lędziny
    • Imielin
    • Bieruń
    • Bojszowy
    • Oświęcim
    • Bestwina
    • Brzeszcze
    • Wilamowice
    • Bielsko-Biała
  • Option D (42.1 km)would have run through the next communes:
    • Mysłowice
    • Lędziny
    • Imielin
    • Bieruń
    • Bojszowy
    • Oświęcim
    • Bestwina
    • Brzeszcze
    • Wilamowice
    • Bielsko-Biała[2][3]

Bielsko-Biała-Cieszyn

Number of exit(facility) Name Mialeage from beginning History of construction Notes
1) Suchy Potok(planned) 0 km Preparation of environmental decision To the Bielsko-Biała-Komorowice interchange parallel to S69-PL.svg, eastern terminus
2) Bielsko-Biała-Rosty 1.6 km (0.99 mi) The contract was signed in October 2008, works started in 2009.[4]
3) Bielsko-Biała-KomorowiceS69-PL.svgDK1-PL.svg 4.5 km (2.80 mi) Works from Bielsko-Biała-Rosty to this interchange were allowed on 5.05.2009[4]
4) No name 7.0 km (4.35 mi) Constructed 06.2003-10.2006[5]
5) No name 8.3 km (5.16 mi) Exit to the shopping center[6]
6) No name40x40px 9.6 km (5.97 mi)
7)(1) No name 13.9 km (8.64 mi) Exit to rest area(westbound)(restaurant, petrol station); interchange both ways[6]
8)(2) No name(Świętoszówka) 16.4 km (10.19 mi) Constructed 11.2004-11.2006[5] Exit to rest area(eastbound)(restaurant, petrol station); exit eastbound only[6]
9)(3) No name 20.7 km (12.86 mi) Exit to rest area(eastbound)(restaurant, petrol station); exit eastbound only, exit to Grodziec via a gravel road[6]
10) No name(Skoczów-I) 22.4 km (13.92 mi) Constructed 06.2003-11.2007[5] Construction was delayed because of the bankruptcy of the first contractor[6]
11) No name(Skoczów-II)DK81-PL.svg 23.3 km (14.48 mi)
12) Ogródzona 31.7 km (19.70 mi) Constructed 10.2002-10.2005[5] Rest area(restaurant, petrol station)[5][6]
13) No name(Krasna) 33.0 km (20.51 mi) Constructed 1991-1995, renovation 11.2006-10.2007[5]
(4) No name 35.3 km (21.93 mi) Rest area(restaurant, petrol station, motel)[6]
14) Cieszyn40x40px 36.3 km (22.56 mi)
15) No name 36.8 km (22.87 mi) Last interchange before border control, exit only westbound, entrance only eastbound.
Border control "Cieszyn" 37.4 km (23.24 mi) Entrance to Czech Republic
Flag of Poland 2.svg40x40px 38.3 km (23.80 mi)[6] Bridge over the Olza river[6]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Droga ekspresowa S1 (Polska)
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 Lua error in package.lua at line 80: module 'strict' not found.