Rail transport in Libya

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

There have been no operational railways in Libya since 1965, but various lines existed in the past. An extensive system is now being developed and under construction.[1]

History

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Map of the colonial railway in Libya before the 1960s
File:The first Locomotive arrived in Tripoli Harbor.jpg
Arrival of the first locomotive in the harbour of Tripoli, around 1912
Littorina passing Tripoli Central Railway Station in the 1930s

The Kingdom of Italy built in Libya nearly 400 km of railways with 950 mm gauge. The last line the Italians started to create was the Tripoli-Benghazi in summer 1941, but their defeat in World War II stopped it at the beginning.[2]

A 950 mm (3 ft 1 38 in) gauge network centred on Tripoli was opened from 17 March 1912 as part of the Italian occupation campaign. This extended from Tripoli 120 km west to Zuwara, 100 km south to Gharyan and 10 km east to Tajura.

A 750 mm (2 ft 5 12 in) (later 950 mm) gauge railway was built east from Benghazi; the main route was 110 km long to Marj and was opened in stages between 1911 and 1927. Benghazi also had a 56 km branch to Suluq opened in 1926.

Military extensions of some 40 km were made from Marj towards Derna in World War II. This was the final line to close, at the end of 1965.

The standard gauge Western Desert Extension was built from a junction 10 km east of Matruh Egypt to Tobruk during WW2 to assist in the Allied defence of the area. In 1942 this 350 km route was completed as part of Allied advance across North Africa. The 125 km Libyan section west of Sollum was removed after closure from 20 December 1946, though the Egyptian Railways Sollum branch still sees occasional freight.

Plans

Lua error in package.lua at line 80: module 'strict' not found. Beginning in 1998,[3] the Libyan government has been planning for an 3170 km 1,435 mm (4 ft 8 12 in) (standard gauge) network.[1] A line parallel to the coast will eventually form part of a North African link between Tunisia and Egypt.[3] The section from the border with Tunisia at Ras Ajdir, then via Tripoli to Sirte was under construction and was planned to open in 2009. China Railway Construction Corporation has contracts to start work in June 2008 on a 352 km route between Sirte and Khoms, to be finished by 2013.[4] The east-west line will be double track.

A second line will run 800 km from iron ore deposits at Wadi Shati near Sabha to the steel works and port at Misrata from 2012.[4]

A third line will run 554 km from Sirte to Benghazi in the East. In October 2007, RZD submitted a feasibility study for the project, and in 2008 signed a contract to begin construction, which was planned to take 4 years to complete.[5] Work began on 30 August 2008.[6] In August 2010, RZD awarded Ansaldo STS and SELEX Communications a contract to install signalling, telecoms, power, security and ticketing systems which is expected to take three years. Ansaldo STS and SELEX Communications are also working on signalling on new lines between Sirte and the Tunisian border, and the route to Sabha.[7]

A trans-Saharan line is also planned, running south to Niger.[3][8]

Construction has ceased during the Libyan Civil War.[9]

As of March 2012, the plans have been delayed until further notice[10]

In February 2013, the pre-revolution railway project has been approved for resumption by the government.[11][12]

Rolling stock

On 10 June 2007 a contract was signed with American General Electric Co. for supply of locomotives and training of Libyan nationals in operational and maintenance work. The contract includes the import of spare parts and technical assistance. The first shipment will arrive Libya by mid-2009.[needs update] Libya has bought one IC4 diesel multiple unit from AnsaldoBreda for evaluation. It is parked at Lua error in package.lua at line 80: module 'strict' not found. until a network is operable.

Timeline

1998

2008

2009

2010

  • March - First 14 km of 554 km long Russian Railways Sirte - Benghazi track in place. The total track laying is expected to take four years.[17]

2011

  • March - China Railway Group suspended work on the 3 projects valued in total at $4.24 billion with $3.55 billion of the project yet to be finished due to the rising violence levels in the Libyan Civil War.[18]

2013

  • February - Talks started between RZD and Libyan authorities to resume construction[19]

See also

References

Notes

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Italian colonial railways in Libya (in Italian)
  3. 3.0 3.1 3.2 "Libya: Railways" Europa World Year Book 2004 Europa Publications, London, volume 2, page 2667, ISBN 1-85743-255-X
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Gardner, Frank (9 December 2001) "Libya unveils railway project" BBC News, accessed 12 March 2011
  9. Staff (5 March 2011) "Work halts on railway network in Libya built with Scunthorpe steel" Scunthorpe Telegraph archived here by WebCitation
  10. Rail network shunted off agenda
  11. Libya awaiting Chinese team for railway talks
  12. Railway will be resumed
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. English_Xinhua
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. First 14 km of Libyan rail network in place
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. http://www.libyaherald.com/2013/02/05/russians-in-tripoli-talks-about-resuming-sirte-benghazi-railway-project/

Further reading

  • Lua error in package.lua at line 80: module 'strict' not found.

External links