Sabah State Administrative Centre
From Infogalactic: the planetary knowledge core
Sabah State Administrative Centre | |
---|---|
General information | |
Status | Internal design work under Construction |
Type | Office |
Location | Kota Kinabalu, Malaysia |
Completed | Structural work completed in mid 2014 |
Cost | Total estimated cost RM 600 millions
Basic structure RM 470 millions Internal design RM 130 millions |
Owner | Sabah State Government |
Technical details | |
Size | 60,000m2 [1] |
Floor count | 33 |
Design and construction | |
Developer | Main Contractor Bina Puri [2] |
The Sabah State Administrative Centre
The structures construction commenced in August 2011 and was scheduled to complete in 30 months. It is an under-construction[3] government office complex located in Kota Kinabalu in the state of Sabah, Malaysia.[4] The complex will consist of a single 33-storey office tower and two 9-storey office buildings and will house the state's chief minister's office and other state government cabinet members.[4]
When completed, due to its high ceilings design, the 33-storey office tower is expected to be the tallest building in Borneo once topped out overtaking Wisma Sanyan in Sibu, Sarawak
References
- ↑ http://ww1.utusan.com.my/utusan/info.asp?y=2011&dt=0725&pub=Utusan_Malaysia&sec=Korporat&pg=ko_03.htm
- ↑ http://ww1.utusan.com.my/utusan/info.asp?y=2011&dt=0725&pub=Utusan_Malaysia&sec=Korporat&pg=ko_03.htm
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
<templatestyles src="Asbox/styles.css"></templatestyles>