Second Severn Crossing

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Second Severn Crossing
Severn Beach MMB 08C Second Severn Crossing.jpg
The Second Severn Crossing, viewed from Severn Beach
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Carries 6 lane M4 motorway
Crosses River Severn
Locale South West England/South East Wales
Characteristics
Design Central span: Cable-stayed bridge
Approach viaducts: Segmental bridge
Total length 5,128 metres (16,824 ft)
Width 34.6 metres (113.5 ft)
Height 137 metres (449 ft)
Longest span 456 metres (1,496 ft)
Clearance below 37 metres (121 ft)
History
Opened 5 June 1996; 27 years ago (5 June 1996)
Statistics
Toll Car: £6.60
Van: £13.20
HGV: £19.80
Motorcycle: Free
Disabled badge holder: Free
File:Severn Estuary Crossings.svg
Map showing the Second Severn Crossing in relation to other crossings and the estuary itself

The Second Severn Crossing (Welsh: Ail Groesfan Hafren) is the M4 motorway bridge over the River Severn between England and Wales, inaugurated on 5 June 1996 by HRH The Prince of Wales to augment the traffic capacity of the original Severn Bridge built in 1966. The bridge marks the lower limit of the River Severn and the start of the Severn Estuary.

Its location is farther to the south than the old bridge and, being more in line with the landward sides of the M4 motorway, is a shorter journey when travelling between England and South Wales. The junctions at each end are designed for most traffic to use this crossing – to use the old Severn Bridge crossing one has to leave the M4 and join the M48 motorway either at Aust or near Magor. The new crossing carries more traffic than the Severn Bridge, which is still in use. It is wider than the Severn Bridge, having three lanes and narrow hard shoulder each way, compared with the two lanes, cycle path and footpath of the original crossing. The path taken by the bridge is close to that of the Severn Tunnel which has carried the railway line beneath the river bed since 1886.

Much of the estuary is mudflats at low tide, but at high tide can be covered by up to 14 metres of water. This presented the engineers with a unique set of constraints with packets of work being scheduled at low tide and being completed with the short windows allowed by the tides.

The concession given to the consortium which financed, built and operate the bridge required them to take over the outstanding debt on the original Severn Bridge and to operate the two bridges as a single entity. Tolls are set annually by the government based on the change in the previous year's Retail Price Index. On the expiry of the concession the consortium is required to hand the bridge over into public ownership. It was reported in 2012, that the process of repayment was likely to continue until the early 2020s due to the introduction of a revised settlement to the operator in return for accepting payment by debit and credit cards. As part of the announcement, it was stated that even after repayment was complete the toll charge would likely remain at the same levels.[1]

Background

The Severn Estuary presented a barrier between the Bristol area and South Wales. The estuary has a maximum tidal range of 14.5 metres, the second highest in the world and during a rising or falling tide, strong currents of up to 8 knots (4 m/s). Much of the estuary is mud flats that are exposed at low tide that have been designated a Special Protection Area. The central part of the estuary is a navigable channel which, at the site of the bridge, is known as "The Shoots". The bridge is upstream from Avonmouth and the Port of Bristol, but downstream from the Port of Sharpness. The Gloucester Harbour Trustees have responsibility for controlling navigation in the estuary's tidal waters upstream from the bridge.[2]

Until 1966, road travellers had the option of either using the Aust Ferry which had operated since medieval times (and as a car ferry since 1926) or by making the 57 miles (92 km) detour via Gloucester.[3] In 1966 the first Severn road bridge, a four-lane suspension bridge was opened carrying the M4 motorway from England into South Wales. By 1984 traffic across the first Severn Bridge had tripled and it was projected that by the mid-1990s the old bridge would be running at capacity. A study was commissioned into the building of a second crossing – either a tunnel or a bridge. The consultants reported back in 1986 recommending that a new bridge be built downstream from the existing bridge.[4][5]

In 1988 it was announced that tenders would be invited from private consortia to fund, build and operate the bridge for as specified period. The consortium would also take over the management and the £100 million debt of the old bridge.[6] Tenders were invited in 1989 and in 1990 the concession to build the bridge was awarded to Severn River Crossing plc.[7] Construction work started on 26 April 1992 and the bridge was opened by the Prince of Wales on 5 June 1996.[4]

Design

The Shoots Bridge; the shipping channel lies between the two towers

The architect and aesthetic consultant for the bridge was Ronald Weeks of Percy Thomas Partnership.[8] The bridge which has portals close to Sudbrook, Monmouthshire on the Welsh side and Severn Beach in South Gloucestershire on the English side has three principal sections – a 25 span viaduct on the English side of length 2,103 m (6,900 ft; 1.307 mi), a 24 span viaduct of length 2,077 m (6,814 ft; 1.291 mi) on the Welsh side and the bridge itself, a 948 m (3,110 ft; 0.589 mi) structure with a 37 m (121 ft) navigational clearance, giving a total of 5,128 m (16,824 ft; 3.186 mi).[9][10] The central section, called the Shoots Bridge, is of cable-stayed design and the central span (between the bridge pylons) is 456 metres (1,496 ft) in length. The approach viaducts are of a segmental bridge design. The crossing forms a very slight "S" curve – the roadway having an approximate east-west alignment at each of the portals, while the central bridge follows an alignment which is approximately WNW to ESE.

The Severn Railway Tunnel passes under the estuary bed on a line which is generally about 500 m upstream of the bridge, but which passes under the line of the bridge close to the English shore.[11][12]

The deck, which carries three lanes of traffic in each direction is 34.6 metres (114 ft) wide. The sides of the bridge are fitted with 3 metres (9.8 ft) baffle plates to reduce lateral wind loads coming from the Severn Estuary onto the traffic and this has reduced the number of times that speed restrictions have been needed. The overall design of the new crossing makes it more resistant to high winds than the old Severn Bridge.[9]

Construction

Construction of the Second Severn Crossing

The crossing was built by a business consortium under a public-private partnership. A company called Severn River Crossing plc, led by John Laing plc and GTM-Entrepose, was formed to build the new crossing.[13] This company also took over the responsibility of managing and maintaining the old Severn Bridge crossing, as well as managing and maintaining the new crossing. The cost of constructing the new crossing was expected to be paid for by tolls collected from motorists using the two crossings. Work on the new crossing began in 1992. Completion was in 1996.

Sub-assemblies for the bridge were constructed onshore and then shifted by a large tracked vehicle (similar to that used to move the Apollo and Space Shuttle at Cape Kennedy) onto a barge (the SAR3), prior to being floated out on the high tide to the appropriate site. The 37 bridge pier foundations on the approach viaducts are 98.11 metres (321.9 ft) apart, and consist of open concrete caissons weighing up to 2,000 tonnes, which were founded on the rock of the estuary bed. The decking consists of 3.6 metres (11.8 ft) post stressed match cast sections, weighing 200 tonnes each.[9]

The cable stayed section of the crossing is over 1,044.7 metres (3,427.5 ft) long, consisting of a 34.6 metres (113.5 ft) wide deck made from steel plate girders with a composite reinforced concrete slab. These were prefabricated on shore and put in place using balanced cantilever methods. There are two high twin leg, reinforced and pre-stressed concrete pylons carrying 240 cables which support the bridge deck rising to a height of 149 metres (489 ft) above the river bed or 101 metres (331 ft) above the bridge deck. Cable vibrations were experienced during construction and secondary cables were added to eliminate this. To avoid detracting from the aesthetics of the primary cables, the secondary cables are very slender and are not very noticeable.[9]

During the summer of 1994 the bridge deck launching gantry fell onto the Gwent viaduct, causing the 200 tonne bridge deck unit to fall onto the deck below. Although this delayed the project by ten weeks, the builders were nevertheless able to complete the bridge on schedule two years later.[14]

Environmental impact

A dunlin feeding, one of the many waders that winter on the Severn estuary

Prior to the bridge's construction, environmentalists raised numerous concerns and criticisms, chiefly about the immediate damage from construction work and the effects of long-term pollution from a projected increase in car traffic.[citation needed]

The crossing passes over mudflats in the Severn Estuary with part of the eastern approach viaduct sited on the English Stones, a rocky outcrop uncovered at low tide. The estuary wetlands are home to migrating birds such as the ringed plover, redshank and whimbrel, while the Eurasian curlew, dunlin and grey plover winter in the area. The birds feed on ragworm, lugworm and other invertebrates. Saltmarsh is found along the fringes of the coast. Beds of eelgrass occur on the more sheltered mud and sand-banks.[15] In 1976, in recognition of the importance of the estuary as a wetland used by migrating birds, an area of 247 square kilometres was designated a Ramsar site.[16] In 1988 the Severn Estuary was designated a Special Protection Area. The same year an area of 99 square kilometres was notified as a SSSI designated as such the following year;[15] in 1995, it was extended to cover the whole of the Ramsar site.[17]

The construction process resulted in a temporary increase in turbidity of the Severn’s waters. Although eelgrass is reasonably tolerant to short-term high turbidity and consequent loss of light, the bed of eelgrass in the Severn was observed to greatly decline during the period of construction.[18] The construction of the approach roads and toll plaza resulted in the permanent loss of some wet pasture land.[19]

Field surveys carried out in 2003 and 2004 reported that the bridge had little effect on the flight paths of the various birds – it was noted that when curlews, dunlins and lapwings approached the bridge, they would change course to gain height and fly over the bridge, but that oystercatchers and turnstones would fly under the bridge. The surveys also showed that the bridge had minimal impact on the roosting habits of most birds, though a flock of mallards were seen to be roosting directly under the bridge with many positioning themselves on the dry concrete base on one of the pillars. Likewise, it was noted that the bridge had little impact on the birds' feeding habits – turnstones and lapwings were recorded as feeding on mudflats directly under the bridge while the absence of other waders was attributed to the rocky nature of the foreshore.[15]

Finances

The consortium consisting of two civil engineering firms and two banks that funded and built the bridge has a 30-year concession to redeem its outlay from tolls collected from users of the bridge. At the end of the concession period, the bridge will pass into public ownership.[14]

Tolls

Toll collection area on the westbound carriageway

Tolls are collected from west-bound traffic only, near Rogiet, some 2.1 miles (3.4 km) from the Welsh portal of the bridge.[7] Tolls can be paid by cash, major credit or debit cards, or by use of the Severn TAG system, which is a wireless electronic toll collection system that does not require vehicles to stop.[20] Cash, credit, or debit cards can be used at the manned booths, only credit and debit cards can be used at the automated coin gates.

Tolls charges are based on a three tier pricing system:[21]

Toll category Description 2016 charge
Category 1
Cars and minibuses with up to 9 seats
£6.60
Category 2
Small buses with up to 17 seats
Vans up to 3.5 tonnes
£13.20
Category 3
Buses with more than 17 seats
Goods vehicles weighing 3.5 tonnes or more
£19.80

Motorcycles and UK disabled badge holders travelling in a vehicle are exempted from paying a toll, although these vehicles must stop at the toll booth to confirm their eligibility.

The toll prices are updated every year on 1 January in accordance with the Severn Bridges Act of 1992.[22][23][24] In late 2008, UK VAT was reduced from 17.5% to 15%, but the bridge toll remained unchanged. For reasons of convenience the tolls are kept at round multiples of 10p (the bridge toll is largely paid in cash as card payments were not accepted until mid-2012), but the 13p VAT reduction was not passed on immediately. In 2009, the planned toll for cars would have been £5.50, as the announcements listed,[22][24] but the actual toll charged was £5.40.

Historical toll charges

Looking west towards the Bristol Channel – the Second Severn Crossing is at the top and the original Severn Bridge is at the bottom.
Date Category 1 Category 2 Category 3
5 June 1996 £3.80 £7.70 £11.50
1 January 1997 £3.90 £7.80 £11.70
1 January 1998 £4.00 £8.10 £12.10
1 January 1999 £4.20 £8.40 £12.50
1 January 2000 £4.20 £8.50 £12.70
1 January 2001 £4.40 £8.70 £13.10
1 January 2002 £4.40 £8.90 £13.30
1 January 2003 £4.50 £9.00 £13.50
1 January 2004 £4.60 £9.30 £13.90
1 January 2005 £4.80 £9.60 £14.30
1 January 2006 £4.90 £9.80 £14.70
1 January 2007 £5.10 £10.20 £15.30
1 January 2008 £5.30 £10.60 £15.90
1 January 2009 £5.40 £10.90 £16.30
1 January 2010[22] £5.50 £10.90 £16.40
1 January 2011[25] £5.70 £11.50 £17.20
1 January 2012[21] £6.00 £12.10 £18.10
1 January 2013[26] £6.20 £12.40 £18.60
1 January 2014[27] £6.40 £12.80 £19.20
1 January 2015[28] £6.50 £13.10 £19.60
1 January 2016[29] £6.60 £13.20 £19.80

Funding and ownership

The bridge was built at a cost of £380 million and is owned by the company Severn River Crossing Plc. As of November 2010, Severn River Crossing Plc was owned

  • 35% John Laing, British developer infrastructure operator
  • 35% Vinci, French concessions and construction company
  • 15% Bank of America, American multinational banking and financial services corporation
  • 15% Barclays Capital, British multinational investment bank[30]

The company's 2011 annual report showed the same companies still owned, through subsidiary companies, all the issued ordinary share capital of the Plc.[31]

Ownership of the crossing and the original Severn Bridge will return to the UK government when the project's required revenue, as defined in the Concession Agreement with the Secretary of State for Transport, has been collected.[31] In 2010, the concession was expected to end in 2017.[32] In 2012, changes were made to the agreement to reflect the effect of changes in VAT and Corporation Tax and the costs of installing credit card handling systems. The net effect was to increase the required revenue from £995.83 million to £1,028.91 million in 1989 prices[30][33] and extending the contract to 2018. It was later announced that these changes and future unspecified repairs were likely to mean that repayment would continue until the early 2020s and that its users should not expect tolls to reduce even after repayment has been completed.[1]

Closures

On 6 February 2009, the bridge was closed by weather for the first time since its opening after three vehicles were struck by falling ice, damaging windscreens.[34] Bad weather, and again falling ice, repeated this in December 2009.[35] Temporary speed limits are put in place due to heavy wind or fog, with drivers informed of this by the electronic signs. Because of the more advanced aerodynamic design of the later bridge, the Second Crossing is far less prone to such restrictions caused by crosswinds than the first Severn Bridge.

View of the Second Severn Crossing from Severn Beach on the English side.

See also

References

  1. 1.0 1.1 http://www.bbc.co.uk/news/uk-wales-19967175
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Journeys between Newport and Bath are reduced from 161 km to 69 km -ViaMichelin.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. Sophie Weeks
  9. 9.0 9.1 9.2 9.3 Lua error in package.lua at line 80: module 'strict' not found.
    Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. 14.0 14.1 Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 15.2 Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. 21.0 21.1 Lua error in package.lua at line 80: module 'strict' not found.
  22. 22.0 22.1 22.2 Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. 24.0 24.1 Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. 30.0 30.1 Lua error in package.lua at line 80: module 'strict' not found.
  31. 31.0 31.1 Lua error in package.lua at line 80: module 'strict' not found.
  32. Lua error in package.lua at line 80: module 'strict' not found.
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.

External links