Southern Ontario Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Southern Ontario Railway
120px
RailAmerica Southern Ontario Railway SOR RLK 2211 EMD GP35M at London ON 2011-05-28.jpg
Southern Ontario Railway #2211 in RailAmerica paint at London, ON in May 2011.
Reporting mark SOR
Locale Southern Ontario
Dates of operation 1998–Present
Predecessor Canadian National Railway
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Length 69 miles (111 km)
Headquarters Hamilton, Ontario
Website Official website
Southern Ontario Railway
Hagersville Subdivision
CN Brandtford
35.1 Simpson
~33.5 ECP Spur
~31.5 Blastech Spur
~31.0 Rembos Spur
27.3 Onondaga
Wesont Lumber Spur
18.7 Caledonia
Nestle Purina Spur
~13.0 CGC spur
9.0 Hagersville
old CN CASO Sub
4.7 Garnet
4.4 old CN Cayuga Sub
0.0 Nanticoke
Lake Erie Works Spur
3.17-mile (5.10 km) Hydro Spur

The Southern Ontario Railway (reporting mark SOR) is a shortline railroad in the province of Ontario, owned and operated by Genesee & Wyoming Canada Inc., the Canadian subsidiary of Genesee & Wyoming Inc.. It operates 69 miles (111 km) of track from Brantford to Nanticoke, Ontario.[1] The railroad began operations in 1998, and was acquired by RailAmerica two years later.[2] It has interchanges with the Canadian National Railway at Hamilton via trackage rights, Brantford and Paris, and interchanges with the Canadian Pacific Railway at Hamilton.[1]

On July 23, 2012, Genesee & Wyoming Inc. announced that it intended to purchase RailAmerica in a deal valued at $1.39 billion.[3][4] Approval of the purchase was granted by the U.S. Surface Transportation Board on December 19, 2012.[5]

The railroad's traffic comes mainly from steel, agricultural products, petroleum products, and chemicals. The SOR carries more than 44,000 carloads a year.[1]

Hagersville Subdivision

The SOR Hagersville Subdivision extends from Nanticoke (Mile 0.0) to Simpson (Mile 35.0). Rail movements on this subdivision are governed by the Occupancy Control System of the Canadian Rail Operating Rules (CROR) and supervised by a rail traffic controller in North Bay, Ontario. The maximum authorized speed on this line is 30 miles per hour (48 km/h). Two or more trains operate daily on the Subdivision. The Hydro Spur (Mile 0.0) extends south off of the Hagersville Subdivision and descends southward to Lake Erie at a 1% grade. An Imperial Oil refinery is located just south and east of Mile 0.0 and an Ontario Hydro facility is located at the southern extremity of the spur (Mile 3.17). Train movements on the spur are governed by CROR Rule 105 and have a maximum authorized speed of 10 mph.[6]

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Surface Transportation Board, Decision, Case No. 42772, December 19, 2012
  6. Lua error in package.lua at line 80: module 'strict' not found.

External links

Media related to Lua error in package.lua at line 80: module 'strict' not found. at Wikimedia Commons


<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>