U.S. Route 7 in Connecticut

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

x70px

U.S. Route 7
290x172px
Route information
Maintained by ConnDOT
Length: 78.29 mi[1] (126.00 km)
Major junctions
South end: I-95 / Conn. Turnpike in Norwalk
  US 1 in Norwalk
Route 15 / Merritt Parkway in Norwalk
I-84 / US 6 in Danbury
US 202 from Danbury to New Milford
US 44 in Canaan
North end: US 7 at the Massachusetts state line in Canaan
Location
Counties: Fairfield, Litchfield
Highway system
  • Routes in Connecticut
x20px US 6 Route 8

U.S. Route 7 (US 7) is a north-south U.S. Highway which runs 78 miles (126 km) in the state of Connecticut. The route begins at Interstate 95 in Norwalk and proceeds north to the Massachusetts border in North Canaan. US 7 was aligned to its current route around 1930, and since then three sections totaling around 12 miles (19 km) have been upgraded to freeway standards.

Route description

US 7 in Connecticut is also known as Route 7, the Ethan Allen Highway, and Super 7. It is mostly a surface road but has three short expressway sections in the Norwalk and Danbury areas. US 7 begins in Norwalk with a 4-mile (6.4 km) expressway that runs nearly to the Wilton town line. There are three exits on this short section, signed as "The Forty Third Infantry Division Memorial Highway". Exit 1, just past the southern terminus at Interstate 95, leads to the Central Norwalk Business District and US 1. Exit 2 leads to Route 123 which extends from US 1 in Norwalk through the town of New Canaan to the New York State line. After Exit 2, the expressway reduces to four lanes from six. Exit 3 leads to the Merritt Parkway (Route 15) southbound. This interchange was half built and only allows southbound access from the expressway; northbound access is gained via Route 123 at Exit 2. The expressway section ends at Grist Mill Road in Norwalk, about one-half mile past Exit 3.

Near Danbury, another expressway section was built beginning 1-mile (1.6 km) south of Interstate 84 near the Danbury Airport. This section is also signed as "The Forty Third Infantry Division Memorial Highway". Through Danbury proper, Route 7 overlaps with I-84 for about 4 miles (6 km). Through this section of expressway, Routes I-84, US 7, US 6 and US 202 are concurrent. Routes 7 and 202 then leave I-84 at exit 7 and travel on their own expressway for approximately 7 miles (11 km) to just south of the New Milford line. On this section there are two exits. At Exit 11, US 202 exits the expressway and at Exit 12, Route 202 crosses back over Route 7. On southbound Route 7, the exit for Interstate 84 Eastbound is signed as exit 10. There is no exit number for I-84 West because of the concurrency. The Route 7 expressway then bypasses Brookfield to the west and terminates at an intersection with Route 202 at the Fairfield/Litchfield county line.

Route 7 is cosigned with US 202 until central New Milford, where Route 202 turns east with Route 67 while Route 7 continues north. Recent construction has also made large parts of Route 7 between the terminus of the expressway and New Milford a four-lane divided highway with at-grade intersections. North of New Milford center, Route 7 remains a two-lane road through the rest of Connecticut. Route 7 has a short 0.35-mile concurrency with US 44 in North Canaan before continuing north for another 1.5 miles to the Massachusetts state line.

History

The precursor to US 7 was New England route NE-4. When US 7 was commissioned, it followed the whole route of NE-4. It entered Connecticut from the north in North Canaan (as today) and then followed Route 41 southwest to Sharon and into New York State. This alignment had US 7 follow NY 22 to a southern terminus in New York City rather than in Norwalk. This southern terminus was shifted to Norwalk around 1930, and was rerouted onto other existing state highways of the time to get from Canaan to Norwalk. From Canaan to New Milford, the road was known as State Highway 134, and from there to Danbury was State Highway 128. From Danbury to Ridgefield, the road was part of another New England route, NE-3, which was paved in 1924. From Ridgefield to Norwalk was State Highway 126.[2]

The entire section between I-95 in Norwalk and I-84 in Danbury was originally planned to be bypassed by a freeway. Construction on the initial freeway segments in Norwalk began in 1969, but lawsuits brought on by residents within the highway's path and environmental groups halted construction north of Route 123 in 1972. With an approved environmental impact statement, construction resumed in 1986 between Route 123 and Grist Mill Road in Norwalk and from I-84 to Sleepy Hollow Road in Danbury. The Danbury section opened in 1987, while the extension of the Route 7 freeway to Grist Mill Road opened in 1992. Lack of funding and continued opposition to the freeway has prevented construction of the remainder of the proposed highway between Grist Mill Road and Danbury. Instead, from 2003 to 2008 the existing Route 7 was widened from 2 to 4 lanes from Grist Mill Road to Wolfpit Road in Wilton, and from the Route 35 intersection in Ridgefield to the freeway terminus at Sleepy Hollow Road in Danbury.

Construction on the section between I-84 and Exit 12 began in 1974 and was completed in 1976. The Brookfield bypass segment between Exit 12 and the current expressway terminus opened in November 2009, after two years of construction. The former US 7 route through Brookfield is now signed solely as US 202.

Junction list

County Location mi[1] km Exit Destinations Notes
Fairfield Norwalk 0.00 0.00 I-95 / Conn. Turnpike – Bridgeport, N.Y. City Southern terminus; Exit 15 on I-95 / Conn. Turnpike
1.18 1.90 1 US 1 (Belden Avenue) – Norwalk
1.84 2.96 2 Route 123 (New Canaan Avenue)
2.93 4.72 3 Route 15 / Merritt Parkway south – N.Y. City Exit 39A&B on Route 15 / Merritt Parkway
4.10 6.60 Main Ave. To Route 15 / Merritt Parkway north
Wilton 6.03 9.70 Route 33 south (Westport Road) Southern end of concurrency with Route 33
6.29 10.12 Route 106 south (Wolfpit Road) Southern end of concurrency with Route 106
6.47 10.41 Route 106 north (Sharp Hill Road) Northern end of concurrency with Route 106
7.30 11.75 Route 33 north – Wilton Center, New Canaan, Ridgefield Northern end of concurrency with Route 33
11.65 18.75 Route 107 / Route 57 – Redding, Weston, Westport Village of Georgetown
Ridgefield 12.56 20.21 Route 102 west – Ridgefield, Weir Farm Village of Branchville
16.88 27.17 Route 35 south – Ridgefield, Aldrich Museum
Danbury 20.43 32.88 7  – Danbury Airport
21.10 33.96 8 Park Avenue No southbound entrance
21.56 34.70 9 I-84 west – Newburgh Left exit northbound; Exit 3 on I-84; Southern end of concurrency with I-84
4 (I-84) US 6 / US 202 west (Lake Avenue) Southern end of concurrency with US 6 and US 202
5 (I-84) Route 37 / Route 39 / Route 53 – Downtown Danbury, Bethel Route 37 only signed northbound
6 (I-84) Route 37 – New Fairfield Southbound exit and northbound entrance
25.21 40.57 10 I-84 / US 6 east – Waterbury Left exit southbound; Exit 7 on I-84; northern end of concurrency with I-84 and US 6
Brookfield 26.54 42.71 11 US 202 east / to Federal Rd. Northern end of concurrency with US 202
29.88 48.09 12 US 202 – Brookfield
31.82 51.21 US 202 west – Brookfield Center Southern end of concurrency with US 202
Litchfield New Milford 37.24 59.93 US 202 / Route 67 east – Roxbury, Litchfield, Washington Northern end of concurrency with US 202
39.93 64.26 Route 37 south – New Fairfield, Sherman, Connecticut Wine Trail
44.36 71.39 Route 55 west (Webatuck Road)
Kent 50.88 81.88 Route 341 – South Kent, Warren, Macedonia Brook State Park
Cornwall 58.74 94.53 Route 45 south – Litchfield, Warren
59.91 96.42 Route 4 east – Cornwall, Goshen, Ski Area, Torrington Southern end of concurrency with Route 4
60.12 96.75 Route 4 west – Sharon, Audubon Center, Millerton NY Northern end of concurrency with Route 4
64.27 103.43 Route 128 – West Cornwall, Covered Bridge
Lime Rock 68.83 110.77 Route 112 west – Lime Rock, Salisbury
Canaan 70.62 113.65 Route 126 – Falls Village, Goshen
71.90 115.71 Route 63 south – Cornwall, Goshen
North Canaan 76.46 123.05 US 44 east – Winsted Southern end of concurrency with US 44
76.80 123.60 US 44 west – Salisbury Northern end of concurrency with US 44
78.29 126.00 US 7 north – Sheffield Continuation into Massachusetts
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. 1.0 1.1 Connecticut Department of Transportation, Highway Log PDF (1.80 MiB) as of December 31, 2010
  2. Lua error in package.lua at line 80: module 'strict' not found.

External links

Script error: No such module "Attached KML".


U.S. Route 7
Previous state:
Terminus
Connecticut Next state:
Massachusetts