Hanul Nuclear Power Plant
From Infogalactic: the planetary knowledge core
(Redirected from Ulchin Nuclear Power Plant)
Hanul Nuclear Power Plant | |
---|---|
Location of Hanul Nuclear Power Plant in South Korea
|
|
Country | South Korea |
Location | Gyeongsangbuk-do |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Commission date | 1988 |
Operator(s) | Korea Hydro & Nuclear Power |
Nuclear power station | |
Reactor type | PWR |
Cooling source | Sea of Japan (East sea of Korea) |
Cooling towers | no |
Power generation | |
Units operational | 1 × 942 MW 1 × 945 MW 1 × 994 MW 1 × 998 MW 2 × 1001 MW |
Units under const. | 2 × 1350 MW |
Nameplate capacity | 5,881 MW Planned: 8,581 MW |
Annual generation | 48,160 |
The Hanul Nuclear Power Plant (originally the Uljin NPP Korean: 울진원자력발전소) is a large nuclear power station in the Gyeongsangbuk-do province of South Korea. The facility has six pressurized water reactors (PWRs) with a total installed capacity of 5,881 MW. The first went online in 1988.[1] [2] The plant's name was changed from Uljin to Hanul in 2013.[3]
On 4 May 2012, ground was broken for two new reactors, Shin ("new") Uljin-1 and -2 using APR-1400 reactors.[4][5] The APR-1400 is a Generation III PWR design with a gross capacity of 1400 MW. It is the first to use Korean-made components for all critical systems. The reactors are expected to cost about 7 trillion won (US$6 billion), and to be completed by 2018.[4]
Unit | Type | Net Capacity | Construction start | Operation start | Notes |
---|---|---|---|---|---|
Phase I | |||||
Uljin-1 | France CPI | 945 | 26 Jan 1983 | 10 Sept 1988 | [6] |
Uljin-2 | France CPI | 942 | 5 July 1983 | 30 Sept 1989 | [7] |
Uljin-3 | OPR-1000 | 994 | 21 July 1993 | 11 Aug 1998 | [8] |
Uljin-4 | OPR-1000 | 998 | 1 Nov 1993 | 31 Dec 1999 | [9] |
Uljin-5 | OPR-1000 | 997 | 1 Oct 1999 | 29 July 2004 | [10] |
Uljin-6 | OPR-1000 | 997 | 29 Sept 2000 | 22 Apr 2005 | [11] |
Phase II | |||||
Shin Uljin-1 | APR-1400 | 1350 | 21 July 2012 | 2017 | [12] |
Shin Uljin-2 | APR-1400 | 1350 | 19 June 2013 | 2018 | [13] |
Shin Uljin-3 | APR-1400 | 1350 | 2018 (planned) | Dec 2022 (planned) | [14] |
Shin Uljin-4 | APR-1400 | 1350 | 2019 (planned) | Dec 2023 (planned) | [15] |
See also
- List of nuclear power stations
- List of power stations in South Korea
- Yeonggwang Nuclear Power Station
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.