Warsaw Metro

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Warsaw Metro
Warsaw Metro logo.svg
Warsaw Metro Plac Wilsona 2.jpg
81 Series train at Plac Wilsona
Overview
Native name Metro Warszawskie
Owner City of Warsaw
Locale Warsaw, Poland
Transit type Rapid transit
Number of lines 2
Number of stations 27
Daily ridership 568,000 (2012;
avg. weekday)[1]
Annual ridership 147.2 million (2013)[2]
Website Metro Warszawskie
Operation
Began operation 1995
Operator(s) Metro Warszawskie
Technical
System length 29.0 km (18.0 mi)[2]
Track gauge 1,435 mm (4 ft 8 12 in)
(standard gauge)
Map

Warszawa metro plan1.svg

The Warsaw Metro (Polish: Metro Warszawskie) is a rapid transit system serving the city of Warsaw, the capital of Poland. It currently consists of two lines, the north–south Line 1 that links central Warsaw with its densely populated northern and southern suburbs, and the initial segment of the east-west Line 2 that opened on March 8, 2015.[3][4]

The first section was opened in 1995 and gradually extended until it reached its full length in October 2008. There are additional plans to construct two more stations on this north-south line omitted during initial construction due to costs. The contract for the construction of the initial central section of the second line,[5] running east–west, was signed on October 28, 2009 and construction began on August 16, 2010.[6] This section is 6.3-kilometre (3.9 mi) long (including a tunnel under the Vistula river) with seven stations,[2] one of which (Świętokrzyska) includes a transfer between the two lines.

In 2009, the Warsaw Metro won two "Metro Award" prizes in the categories of "Special Merit Award for Commitment to the Environment" and "Best Maintenance Programme". These were followed by the Most Improved Metro award in 2011.[7] The system consistently receives very high ratings among its passengers; a survey conducted in September 2014 indicated that 98% of the respondents rated it good or very good.[8]

History

File:Warsaw Metro 1938 Phase1.png
First phase of the planned metro network started in 1938, never completed with the onset of World War II and consequent Planned destruction of Warsaw

Plans to build an underground rail system in Warsaw date as far back as 1918, when the idea was first floated when Warsaw regained its status as Poland's capital city. An underground railway system was expected to solve the transport difficulties of the densely built city centre. Proper preliminary planning and boring work were initiated by the Warsaw Tramway Authority in 1925, with construction expected to start in the late 1920s. The Great Depression buried those plans as Poland and the world was gripped by economic hardship. In 1934, with the election of a new mayor of Warsaw, Stefan Starzyński, work was to resume on the metro. The mayor dusted off the plans from the mid-1920s, and with some minor adjustments, construction of the metro was planned to start by the late 1930s, with a projected finishing date of the first of two projected lines scheduled for the mid-1940s. By then, the subway network was to consist of two lines. Line 1 (North-South line, 4.6 mi (7.4 km) long) was to follow a route similar to the present-day line and was to link the southernmost borough of Mokotów with the city centre and the northern borough of Żoliborz. This line was to be connected with the newly constructed Warszawa Główna railway station and the railway tunnel crossing the city from west to the east. The line 2 (East-West, 3.95 mi (6.36 km) long) was to start beneath the westernmost borough of Wola, proceed along the Chłodna street to the pivotal station beneath the Saxon Square and then further eastwards to the Vistula river escarpment. There, the line was to go overground, cross the river through a newly built bridge and proceed to the easternmost railway station of Warszawa Wschodnia. Altogether, in 35 years, 7 lines were to be built. The works finally started in 1938, but World War II brought an end to the ambitious undertaking. The short trace tunnels made in 1938 serve as a wine cellar today.

Line M1
Młociny
Tram interchange
Wawrzyszew
Stare Bielany
Słodowiec
Tram interchange
Marymont
Tram interchange
Plac Wilsona
Tram interchange
Dworzec Gdański
Polish State Railways Tram interchange
Muranów
(planned)
Ratusz Arsenał
Tram interchange
Świętokrzyska
Line M2 Tram interchange
Centrum
Plac Konstytucji
(planned)
Politechnika
Tram interchange
Pole Mokotowskie
Tram interchange
Racławicka
Wierzbno
Wilanowska
Tram interchange
Służew
Ursynów
Stokłosy
Imielin
Natolin
Kabaty
Kabaty STP depot
Line M2
Rondo Daszyńskiego
Tram interchange
Rondo ONZ
Tram interchange
Świętokrzyska
Line M1 Tram interchange
Nowy Świat — Uniwersytet
Centrum Nauki Kopernik
Stadion Narodowy
Szybka Kolej Miejska Tram interchange
Dworzec Wileński
Polish State Railways Tram interchange
Szwecka
Targówek
Trocka

The city suffered heavily during World War II. Although the majority of pre-war projects perished during the war, most of the engineers behind their creation survived and returned to their city to take part in its rebirth. However, the new Communist authorities of Poland envisioned a city completely different from what it had been before the war. As the "ideal" communist city, Warsaw was to be decentralized and the need to commute to the city centre reduced. Thus, the Office for the Reconstruction of Warsaw (BOS) commissioned a number of engineers to prepare a project of a fast urban railway (SKM) crossing the city in a deep cutting. Although to a large extent it was to follow the line 1 of the pre-war plans, only the central stations were to be located underground. However, by the end of the decade the project was cancelled. Instead, in 1948 communist planners developed a different concept with the new SKM morphing into a rapid transit line at a depth of up to 15 metres (49 feet)). The suggested North-South direction, with three parallel branches of the same line in the city centre, corresponded to the planned development of the city along the Vistula. The works, however, never started and this project was also abandoned.

In the 1950s, as the Cold War raged on, Soviet strategic plans required that a secure transport link across the river Vistula be built. One of the ways to achieve this was to create a deep metro system in Warsaw (up to 150 feet (46 m) beneath the ground), which would be interlinked with the rail network and could serve as an underground conduit for transporting troops. Plans assumed that the first line (about 11 kilometres (6.8 miles) long) would lie along a North-South axis, with a branch of the same line crossing the Vistula river in the city centre. The construction works started almost simultaneously at 17 different points on both sides of the river. By 1953 only 771 metres (843 yd) of tunnels had been built; after the death of Joseph Stalin and the start of a period of détente, all work was halted under the pretext of technical difficulties. In the following years, only one junction tunnel and one shield-driven tunnel were continued. These works were undertaken experimentally, in order to discover the best driving methods suitable for the ground conditions beneath Warsaw (pliocene clay formations layer spread beneath quaternary soils). Finally, in 1957, all work was halted.

Since 1955, planners returned to the old idea of a shallow metro network. However, the planning phase proceeded at a very slow pace and the economic situation prevented all successive governments from actually starting serious work. Finally, in 1984, the program was approved by the government and the first tunnels built. Lack of funds, technical difficulties, shortage of materials and outdated tunnelling methods meant that the work progressed very slowly, at a speed no greater than 2 metres (6.6 ft) a day.

The Metro was opened in 1995 with a total of 11 stations. The inaugural line, Line 1, has 21 stations along a route distance of 22.7 kilometres (14.1 mi).

Timeline

Segment Length (km)[citation needed] Date opened
KabatyPolitechnika 11.1 April 7, 1995
PolitechnikaCentrum 1.4 May 26, 1998
CentrumRatusz Arsenał 1.7 May 11, 2001
Ratusz ArsenałDworzec Gdański 1.5 December 20, 2003
Dworzec GdańskiPlac Wilsona 1.5 April 8, 2005
Plac WilsonaMarymont 0.9 December 29, 2006
MarymontSłodowiec 1.0 April 23, 2008
SłodowiecMłociny 2.6 October 25, 2008[9]
Rondo DaszyńskiegoDworzec Wileński 6.3[2] March 8, 2015[3]
Total: 27 Stations 29.0 km[2]

Lines

# Opened Length Stations
M1 1995-2008 22.7 km (14.1 mi)[2] 21[2]
M2 2015 6.3 km (3.9 mi), 32 km (20 mi) planned in total[2] 7, 27 planned in total[2]
M3 In planning 8
Total: 29 km (18 mi) 58

Rolling stock

File:Warsaw-Metro-Passengers-en.svg
Annual ridership and number of stations of the Warsaw Metro
London Underground lines
Line Current stock Image Introduced Driving No of
Cars
Length Seats Capacity
M1 Metrowagonmash
(81-717.3/714.3)
81-717.3, Politechnika, 2013-10-30.jpg 1990 OPO 6 115.4m 260 1200
M1 Metrowagonmash
(81-572/573)
150px 1994-1997 OPO 6 115.4m 260 1200
M1 Metrowagonmash
(81-572.2/573.2)
150px 2009 OPO 6 115.4m 260 1200
M1 Alstom
(Alstom Metropolis)
150px 2000–2005 OPO 6 117.1m 264 1454
M1 Siemens Mobility
(Siemens Inspiro)
150px 2013 OPO 6 117.7 232 1500
M2
OPO: One Person Operation.

Initially, all of the trains were Russian built. They first arrived in Warsaw in 1990 as a "gift" from the USSR, five years prior to the Metro's opening, from Metrovagonmash plant in Mytishchi (near Moscow) (model 81-717.3/714.3 - 10 carriages). Subsequent trains arrived from Saint Petersburg's Yegorov Plant in 1994 (81-572/573 - 32 carriages) and additional 18 81-572.1/573.1 carriages in 1997.[10]

In 1998, 108 new carriages were ordered from Alstom. These were all delivered by 2005[11] (24 were produced in Barcelona and the rest in Chorzów).[12] In 2006 additional carriages were ordered from Russia, with deliveries taking place during 2007, to lengthen the existing trains using older Russian carriages.

Currently out of the 40 trains running, 15 consist of the older Russian cars, 7 of the newer Russian cars and 18 of the Alstom-produced cars. The Russian and Alstom carriages are incompatible and cannot be combined in the same train. However, the older and newer Russian cars are interchangeable, with the exception that the cabs on each train must be of the same model at both ends.

In February 2011, an order was signed with Siemens for 35 complete trains from their new Inspiro line. A large number of these were to be manufactured in Poland by Newag. The first 5 of these trains were put into service in 2013. However, in November 2013 a fire broke out on one of them and for safety reasons all five were withdrawn from service until the cause of the fire was determined. Once the investigation was completed the five new Inspiro trains were put back into service in March 2014.

Depots

A single depot is located south of the Kabaty station. There is a single-track connection between the depot and Warszawa-Okęcie station on the PKP rail network. This link is not electrified, and used only for an occasional rolling-stock transfer.

Plans

A map of the Warsaw Metro, showing the north–south Line 1, as well as the planned east–west lines
File:Metro w Warszawie Plac Konstytucji i Muranow.svg
Two new stations planned from the beginning as completion of the line 1

The first line was a compromise between earlier route proposals further east and west (one of which belonged to the planned Line 4) and as such does not go to some important areas of the city. For example, it does not pass directly under the old town, Warsaw's main tourist attraction, which has few public transport links, passing it about 600 m to the west. It also does not directly connect to the central railway station, with the nearest stop being over 400 meters to the east (the second line also avoids it, with the closest station about 400 m to the north). Until the opening of the second line in March 2015, the Metro system was confined to the western bank of the Vistula river, thus doing nothing to ease traffic problems on Warsaw's bridges, a major bottleneck between the city centre and the eastern Praga district. Plans for the third line to Okęcie airport have been abandoned for the foreseeable future.

Transport planners have suggested that the WKD, a light rail line that runs to the western suburbs, could be integrated with the city's tram system, or be more closely tied to the Metro and a future suburban rail network, or both. The first such plans were prepared in the late 1930s and the railway tunnel running below the city centre was to be shared by both the railways and the metro. In the mid-1990s the WKD, PKP and Warsaw Metro systems were temporarily integrated and Warsaw city travel cards were valid also in the suburban railways. This idea was, however, dropped in 1999 due to financial problems.

Future extensions

  • Plac Konstytucji and Muranów, two stations omitted from the original plan to reduce cost were to be built by 2009, but construction has not yet started, and will not start in the near future.[13]
  • Line 2: the first, central section[14] now consists of seven stations: Rondo Daszyńskiego, Rondo ONZ, Świętokrzyska, Nowy Świat, Centrum Nauki Kopernik, Stadion Narodowy and Dworzec Wileński. It passes under the Vistula river between the Centrum Nauki Kopernik and Stadion Narodowy stations. Most of the funding for building this section was secured from the European Union and construction started in August 2010. The original plan to finish this section in time for Euro 2012 was too optimistic, with final completion occurring in March 2015. This line was built using a different boring technology that allowed for much faster construction compared to the first. The rest of Line 2 and its branches, totaling 28 stations, will be built in the future. A tender was opened for 35 trains (most to be used on Line 2, some on Line 1); Škoda Transportation and Vagonmash submitted the lowest price[15] but Siemens/Newag scored more points and were chosen to provide the trains.[16]
  • The final Warsaw Metro plan calls for four lines incorporating 100 km (62 mi) of track.[17]

See also

References

Inline citations
  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. website of Warsaw Metro - Line 2 information and maps
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. http://www.terrapinn.com/awards/the-metros/winners.stm
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. http://www.metro.waw.pl/page.php?id=223
  14. http://www.metro.waw.pl/page.php?id=260
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. http://www.railway-technology.com/projects/warsawmetro/
Bibliography
  • Lua error in package.lua at line 80: module 'strict' not found.

External links

Videos
  • Television TVPW - The Information Movie about Warsaw Metro system (production: TVPW) (Polish)
  • Television TVPW - Relation of opening the "Słodowiec" station (production: TVPW) (Polish)
  • Television TVPW - The movie about building the metro in Warsaw from the beginning to the end (production: TVPW) (Polish)
  • Television TVPW - The interview with Robert Jaryczewski - the best metro driver of the world in 2008 (production: TVPW) (Polish)
  • Television TVPW - The movie about signaling in metro in Warsaw (production: TVPW) (Polish)