Oaky River

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Oaky River
Perennial stream[1]
Oaky River Dam.jpg
Oaky River Dam and gorge
Country Australia
State New South Wales
IBRA New England Tablelands
District Northern Tablelands
local government area Armidale Dumaresq
Part of Macleay River catchment
Tributaries
 - right Ponds Creek
Source Round Mountain, Sonwy Range, Great Dividing Range
 - location below Point Lookout, near Ebor
 - elevation 1,400 m (4,593 ft)
Mouth confluence with the Chandler River
 - location near Jeogla
 - elevation 277 m (909 ft)
Length 60 km (37 mi)
National park Cathedral Rock NP, New England NP
Reservoir Oaky River Dam
[2]

Oaky River, a perennial stream of the Macleay River catchment, is located in the Northern Tablelands district of New South Wales, Australia.

Course and features

Oaky River rises on the southern slopes of Round Mountain, the highest peak of the Snowy Range, a spur of the Great Dividing Range south southwest of Ebor, and flows generally southwest, joined by one minor tributary before reaching its confluence with the Chandler River, southwest of Jeogla. The river descends 881 metres (2,890 ft) over its 51 kilometres (32 mi) course;[2] rapidly descending into a deep gorge where it meets the Chandler River.

The upper reaches of Oaky River are transversed by the Waterfall Way between Wollomombi and Ebor.

Oaky River and its tributaries are trout streams and platypus may be sighted in the waters.[3][4]

Reservoir

The river is impounded by Oaky River Dam, located approximately 40 kilometres (25 mi) from Armidale. At capacity, the dam covers around 42 hectares (100 acres) and holds 2,780 megalitres (98×10^6 cu ft) of water. A hydroelectric power station is located at the dam and the flow of water is used to generate electricity. The power station has five turbines that generate 12 megawatts (16,000 hp).[citation needed] Zihni Buzo OAM,[5] an Albanian refugee and Harvard-educated civil engineer and the father of Australian playwright, Alex Buzo, was the leading engineer on the construction of the dam and hydroelectric scheme.[6][7] This dam burst in February 2013 and is no longer viable.

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Lua error in package.lua at line 80: module 'strict' not found.

Lua error in package.lua at line 80: module 'strict' not found.