Tobu Kinugawa Line
Tobu Kinugawa Line | |
---|---|
Overview | |
Type | Heavy rail |
Locale | Tochigi Prefecture |
Termini | Shimo-Imaichi Shin-Fujiwara |
Operation | |
Owner | Tobu Railway |
Technical | |
Line length | 16.2 km (10.1 mi) |
Track gauge | 1,067 mm (3 ft 6 in) |
Electrification | 1,500 V DC, overhead catenary |
The Tobu Kinugawa Line (東武鬼怒川線 Tōbu Kinugawa-sen?) is a 16.2 km long Japanese railway line from Shimo-Imaichi Station to Shin-Fujiwara Station in Nikkō, Tochigi. It is owned and operated by the private railway operator Tobu Railway.[1] Its name was taken after Kinugawa Onsen hot spring resort area the line serves.
At Shimo-Imaichi Station it connects with the Tobu Nikko Line. At Shin-Fujiwara Station it connects with the Yagan Railway Aizu Kinugawa Line. Some trains goes beyond the Aizu Kinugawa Line terminus at Aizu-Kōgen Oze-guchi Station onto the Aizu Railway Aizu Line.
The line runs surcharged, reserved-seat limited express services from and to Asakusa and Shinjuku in Tokyo.
The whole line is electrified at 1,500 V DC, but it is single tracked except for a 0.8 km double-tracked section at Kinugawa-Onsen Station.
Contents
Stations
Station | Distance (km) | Transfers | Location | ||
---|---|---|---|---|---|
Between stations |
Total | ||||
Shimo-Imaichi | 下今市 | - | 0.0 | Tobu Nikko Line | Nikkō, Tochigi |
Daiya-Mukō | 大谷向 | 0.8 | 0.8 | ||
Ōkuwa | 大桑 | 4.0 | 4.8 | ||
Shin-Takatoku | 新高徳 | 2.5 | 7.3 | ||
Kosagoe | 小佐越 | 2.6 | 9.9 | ||
Kinugawa-Onsen | 鬼怒川温泉 | 2.5 | 12.4 | ||
Kinugawa-Kōen | 鬼怒川公園 | 2.1 | 14.5 | ||
Shin-Fujiwara | 新藤原 | 1.7 | 16.2 | Yagan Railway Aizu Kinugawa Line |
History
- 1915: Fujiwara Tramway (藤原軌道株式会社 Fujiwara Kidō Kabushiki-gaisha?) was licensed to build a 762 mm (2 ft 6 in) gauge steam-hauled tramway. It was renamed Shimotsuke Tramway (下野軌道株式会社 Shimotsuke Kidō Kabushiki-gaisha?) in the same year.
- 2 January 1917: A 3.6-mile (5.8 km) section from Daiya-gawa Hokugan Station to Kinugawa Nangan Station was opened. The line was extended a further 2.5 miles (4.0 km) the same year.
- March 1919: Ōhara Station to Shimotaki Station section was opened.
- October 1919: Daiya Mukō Imaichi Station to Shin-Imaichi Station section was opened.
- 1 January 1920: Shimotaki Station to Fujiwara Station section was open to complete the whole 10.9-mile (17.5 km) line.
- 6 June 1921: The company name was renamed Shimotsuke Electric Railway Co., Ltd. (下野電気鉄道株式会社 Shimotsuke Denki Tetsudō Kabushiki-gaisha?).
- 9 March 1922: The whole line was electrified at 600 V DC.
- April 1927: The corporate headquarters was relocated to the Tobu Railway headquarters in Tokyo.
- 22 October 1929: 1,067 mm (3 ft 6 in) gauge operation began on all the line.
- 1931: The voltage was raised to 1,500 V.
- 1 May 1943: Shimotsuke Electric Railway was bought out by Tobu Railway. The line became Tobu Kinugawa Line.
- 9 October 1986: Yagan Railway Aizu Kinugawa Line through service began.
- 12 October 1990: Aizu Railway Aizu Line through service to Aizu Tajima Station began.
- 18 March 2006: New Kinugawa services to/from Shinjuku commence.[2]
From 17 March 2012, station numbering was introduced on all Tobu lines, with Tobu Kinugawa Line stations adopting the prefix "TN" in orange.[3]
Former connecting lines
- Shin-Takatoku station - The Tobu Yaita Line operated between 1924 and 1959.
Future developments
Tobu plans to borrow former JNR Class C11 steam locomotive C11 207 from JR Hokkaido for use on the 12.4 km section of the Kinugawa Line between Shimo-Imaichi and Kinugawa-Onsen stations from fiscal 2017.[4]
See also
References
Wikimedia Commons has media related to Tōbu Kinugawa Line. |
- Use dmy dates from November 2010
- Articles that mention track gauge 1067 mm
- Articles containing Japanese-language text
- Articles that mention track gauge 762 mm
- Commons category link is locally defined
- Lines of Tobu Railway
- Rail transport in Tochigi Prefecture
- 1067 mm gauge railways in Japan
- 2 ft 6 in gauge railways in Japan