Bellinzona railway station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Bellinzona
File:BellinzonaBahnhof061020.jpg
The station building.
Location Viale Stazione 36,
6500 Bellinzona,
Canton of Ticino,
Switzerland
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Elevation Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). AMSL[1]
Owned by Swiss Federal Railways
Operated by Swiss Federal Railways (SBB-CFF-FFS)
Treni Regionali Ticino Lombardia(TILO)
Eurocity (EC)
Line(s) Gotthard railway
Distance Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). from Immensee[1]
Platforms 6
History
Opened December 6, 1874 (1874-12-06)
Electrified May 29, 1921 (1921-05-29)
Services
Preceding station   Swiss rail network   Following station
toward Zürich Hbf
EC
toward Zürich Hbf
SBB-CFF-FFS
toward 
toward Basel SBB
SBB-CFF-FFS
toward 
toward Zürich Hbf
SBB-CFF-FFS
Terminus
toward Basel SBB
SBB-CFF-FFS
Terminus
toward Airolo
TILO
S10
toward Chiasso
Terminus
TILO
S20
toward Locarno
Terminus TILO
S30
Location
Bellinzona railway station
Bellinzona railway station
Bellinzona railway station
Bellinzona railway station (Switzerland)

Bellinzona railway station (Italian: Stazione di Bellinzona ) serves the city of Bellinzona, in the Canton of Ticino, Switzerland. It is on the Swiss Federal Railways' Gotthard line.[1]

History

The station was opened in 1874, as part of the opening of the Ticino valley railway, with its Biasca – Bellinzona – LuganoChiasso line, and its Bellinzona – Locarno line. In 1882, upon the opening of the Gotthard Rail Tunnel, and the related commencement of services on the line from Airolo to Biasca, Bellinzona was connected with the north, and with German-speaking Switzerland.

In 2008, the SBB Cargo facility at Bellinzona hit the headlines, when its workers went on strike, after SBB Cargo had prescribed rigorous reduction measures for the site.[2]

With the opening of the Gotthard Base Tunnel in late 2016, travel times between Bellinzona and German Switzerland will fall by about one hour.

The station at the opening of the Gotthard line in 1882 

Facilities

The station has five through platform tracks, served by a side platform and two island platforms, connected by both a pedestrian subway and a footbridge. There are also transit and overtaking tracks for goods trains.

The station building is on the side platform, and is flanked at each end of the station by two terminal platform tracks; the terminal track to the south is in occasional use by terminating passenger trains, but the one to the north is normally used to stable the Bellinzona tunnel rescue train.

Operations

Passenger traffic at the station is handled by Swiss Federal Railways, which serves the station with long distance trains, and by Treni Regionali Ticino Lombardia (TiLo), which operates the three lines of the Ticino rapid transit network.

Trains operated include:

Regional bus routes of the Autopostale terminate on the station forecourt, providing links to various destinations. Autopostale also operates Bellinzona's city bus network, and all city services call at the station.

Station building with regional bus stops 
Station building and platforms from the footbridge, looking south 
Station platforms and railway works from the footbridge, looking north 

The future

Despite the planned Bellinzona rail bypass, which has now been postponed due to lack of funds, the station is set to remain a long distance train stopping point, even after the opening of the Gotthard Base Tunnel.

Initial plans were to replace the present Bellinzona and Lugano railway stations with a new station, to be named Ticino South, as part of the Ceneri Base Tunnel construction project. The new station would have been situated in Camorino, at the intersection of the Gotthard axis of the new AlpTransit line and the old Gotthardbahn.

However, in May 2007 the Swiss Federal Railways dissociated itself from those plans, and indicated support for the continued stopping of long-distance trains in the city centres of Bellinzona and Lugano.

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.

This article is based upon a translation of the German language version as at September 2010. The original authors can be seen here.

External links

  • Media related to Lua error in package.lua at line 80: module 'strict' not found. at Wikimedia Commons