Kent Hills Wind Farm is a large wind farm project in Elgin, New Brunswick. The wind farm was completed on December 31, 2008.[1] The farm is the first in New Brunswick. It is owned and operated by TransAlta and the power is purchased by NB Power for supply to consumers.[2]

The farm consists of thirty-two 3 megawatt (MW) wind turbines for a total capacity of 96 MW. The project produces 280,000 megawatt hours per year,[3] enough power for 17,000 homes. The turbines used are Vestas V90-3MW model, which have a rotor diameter of 90 metres (295 ft) and sit atop an 80-metre (262 ft) tower.[1]

There are plans to expand the wind farm by adding a further 18 turbines at an undetermined date in the future.[1]

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.

Lua error in package.lua at line 80: module 'strict' not found.


<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>