Pinnaroo railway line, South Australia

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Pinnaroo railway line, South Australia
Overview
Status no services
Locale Murray Mallee
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Operation
Opened 14 September 1906 (1906-09-14)
Technical
Line length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Track length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
No. of tracks 1
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Old gauge 5 ft 3 in (1,600 mm)
Route map
To Adelaide
120.3 km Tailem Bend Loop (Station closed)
to Wolseley & Melbourne
158.5 km Peake Loop & silos
188.8 km Geranium Loop & silos
222.2 km Lameroo Loop (Station closed)
236.7 km Parilla Loop & silos
259.7 km Pinnaroo Loop (Station closed)
264.4 km Pinnaroo AWB Loop & silos
End of Standard Gauge
265.2 km South Australia / Victoria Border
Pinnaroo lineto Ouyen & Mildura line

Blue is Standard Gauge, Red is Broad Gauge

The Pinnaroo railway line runs east from the Adelaide to Melbourne line at Tailem Bend to Pinnaroo near the South Australia / Victoria state border. The route continued into Victoria via the Victorian Railways line to Ouyen where it joined the Mildura line.[1]

History

The line opened from Tailem Bend to Pinnaroo on 14 September 1906, being extended to the state border on 29 July 1915.[2]

When the Adelaide to Wolseley line was closed east of Tailem Bend for gauge conversion, the Pinnaroo line became part of the main line between Adelaide and Melbourne for two weeks in April 1995. Journey times increased by 10 to 12 hours.[3][4]

In May 1995, it was announced that the line west of Pinnaroo would be gauge converted from broad gauge to standard gauge.[5][6] Work on the conversion of the line was delayed until 1996, due to a large grain crop and increased traffic by trains destined for Tocumwal and Yarrawonga in regional Victoria that were on the broad gauge network.[7]

A small part of the line converted in 1996, was converted back for the 1997 grain harvest. To continue the journey to Adelaide, the grain was transhipped at Tailem Bend.[8] The last broad gauge train operated on 2 July 1998[9] with the line reopening on 25 November 1998.[2][10] As the Victorian line remained broad gauge, trains could no longer operate over the entire length with Pinaroo becoming a break of gauge point.

The line is expected to close in July 2015.[11] Viterra announced that no more grain would be carried by rail after 31 July 2015, with the 2015 harvest to be entirely transported by road.[12]

References

  1. Panitya Line Vicsig
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. "National Rail's Melbourne - Adelaide Diversion Services" Railway Digest April 1995 page 31
  4. "Pinnaroo Diversions a Success" Railway Digest June 1995 page 15
  5. "SA Branches to be Standardised" Railway Digest June 1995 page 15
  6. Non-Metropolitan Railways (Transfer) Act 1997 Government of South Australia
  7. "SA Murray Lands Renaissance" Railway Digest October 1995 page 15
  8. "South Australia" Railway Digest April 1997 page 37
  9. "Australian Southern News" Railway Digest September 1998 page 36
  10. "Australian Southern's Grain Gain" Railway Digest January 1999 page 12
  11. Freight Study & Rail Operations Investigation Flywheel Advisory 17 November 2014
  12. Lua error in package.lua at line 80: module 'strict' not found.