Waseca Subdivision

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Dakota, Minnesota and Eastern Railroad
Waseca Subdivision
east to Union Pacific Railroad Winona Subdivsion
0.0 Tower CKCanadian Pacific River Subdivision
1.5 Goodview, Minnesota
3.1 Minnesota City JunctionCP River Subdivision
4.6 Minnesota City
11.3 Stockton
18.4 Lewiston
south to Wyattville
22.7 Utica
south to Fremont and Grover
28.3 St. Charles
north to Little Valley and Six Oaks, south to Troy
32.2 Dover
36.9 Eyota
37.9 Plainview spurformer link to Chatfield
42.7 Haverhill (Chester)
49.2 Rochester
south spur, formerly CGW to Spring Valley and Iowa
north spur, formerly to Red Wing
Olmsted
58.7 Byron
64.2 Kasson
Chicago Great Western Railway
68.3 Dodge Center
76.4 Claremont
north to Rice Lake and Lington
87.6 IC&E/Canadian Pacific Owatonna Subdivision
north to Faribault (Comus), south to Mason City, Iowa
88.1 Owatonna
Union Pacific Railroad Albert Lea Subdivision
96.3 Meriden
102.5 Waseca
south to Hartland Subdivision
west to Tracy Subdivision

The Waseca Subdivision or Waseca Sub is a railway line in southern Minnesota owned and operated by the Dakota, Minnesota and Eastern Railroad (DM&E) subsidiary of Canadian Pacific. It stretches roughly 103 miles (166 km) from Winona, Minnesota in the east to Waseca in the west where the rails continue as the Tracy Subdivision. There's also a connection south to the Hartland Subdivision. U.S. Highway 14 closely follows the railroad line.

Most of the line is dark territory, meaning that it is not signalled and not equipped with centralized traffic control or automatic block signalling systems. The line is dispatched via radio using track warrant control. However, short stretches of track in and near Winona are under control of signaling systems of the Union Pacific Railroad and Canadian Pacific.[1]

Construction

The line was originally planned in the 1850s when Minnesota was still Minnesota Territory, though it took the formation and collapse of a handful of different railroad companies before it was completely built. The first was the Transit Railroad Company, which formed in 1854 and included figures such as Henry Hastings Sibley and Alexander Ramsey who soon went on to become the first and second governors of Minnesota, respectively (though Ramsey had already been an appointed governor of Minnesota Territory). However, construction didn't begin until a groundbreaking on June 9, 1858 in Winona. A contract had been awarded the previous day to DeGraff & Co., headed by Colonel Andrew DeGraff (only two weeks after Henry Sibley entered office as governor). The company was able to grade 50 miles of right-of-way and build bridges along the route, but was hit by the 1858–1859 financial crisis. Work stalled and the property eventually went into foreclosure.

The Winona, St. Peter & Missouri River Railroad Company was awarded the property in 1861, but failed to make sufficient progress toward a goal of having trains up and running to Rochester by a deadline set by the state legislature, so ownership transferred to the Winona & St. Peter Railroad Company in 1862. The first passenger train, operated by Col. DeGraff, finally ran on December 9 of that year between Winona and Stockton and back, and the first freight load was carried the next day. This was less than six months after the William Crooks became the first locomotive to run in the state, between Saint Paul and St. Anthony (now Minneapolis).

Many of miles of track were laid in the following years. The railroad reached Rochester in 1864, Kasson in 1865 and Owatonna in 1866. The Chicago and North Western Railway (C&NW) bought the Winona & St. Peter in 1867, though it continued as a distinct subsidiary until 1900. Though the existing property was transferred to the new owner, the underlying land grants that made the line possible were transferred to investors in New York headed by A. H. Barney, a figure in the early days of Wells Fargo & Company. Today's subdivision was completed in 1868 with the addition of 16 miles through Waseca, though the line continued to be built westward, reaching Dakota Territory (now South Dakota) in 1872.

Additional branch lines were added, including three in 1878: from Eyota south to Chatfield, north from Eyota to Plainview, and north from Rochester to Zumbrota. A fourth branch off the mainline was made farther west (in today's Tracy Subdivision) the same year, from Sleepy Eye north to Redwood Falls. Interchanges were also made between this line and other north-south rail lines operated by other companies.[2] However, these branches have largely been abandoned today.

Decline of the Chicago and North Western

Passenger train service continued on the line from its formation until July 23, 1963 when the Rochester 400 made its final run. Amtrak's Empire Builder still briefly runs along a right-of-way shared between the Waseca Sub and Canadian Pacific's main line along the Mississippi River from Tower CK in Winona to Minnesota City Junction. That train uses the former Milwaukee Road Hiawatha route between Saint Paul and Chicago.

Chicago and North Western continued to operate the line across southern Minnesota and South Dakota until the 1980s, but was planning to abandon it. The Dakota, Minnesota and Eastern Railroad was formed and took over the line in 1986.

DM&E takeover and future plans

Starting in the late 1990s, DM&E began work on an extension from the western end of its line in South Dakota to coal mines in the Powder River Basin, and hoped to run coal trains along this route. However, the city of Rochester objected to this and wanted a rail bypass to be built if the rail volume was going to increase. A bypass is currently estimated to cost about $325 million. If built, it would turn south from the main line west of Dodge Center, go about as far south as the Rochester International Airport, then go back and rejoin the main line east of Eyota.[3] As the bypass debate continued, the Canadian Pacific Railway moved in to acquire the DM&E, which was completed in 2008.

There has also been renewed interest in passenger rail in southern Minnesota since the 1990s when Rochester was included in a study of possible high-speed rail routes between Minneapolis–Saint Paul and Chicago. As of 2010, the Minnesota Department of Transportation hopes to build passenger rail line between the Twin Cities and Rochester by 2030. As currently envisioned, new track would be laid for most of the distance south from the Cities and it would join the current DM&E line near Kasson to make the run into Rochester. If the line were to continue toward Chicago, some new track would likely need to be built to handle the descent to the Mississippi River near Winona.

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.

See also

External links